Filter interviews by
Clear (1)
In 5 years, I see myself as a senior design engineer leading a team of designers and working on innovative projects.
Leading a team of designers
Working on innovative projects
Continuing to learn and develop my skills
Contributing to the growth and success of the company
Building strong relationships with clients and colleagues
Top trending discussions
Approach in chiller refers to the method or strategy used to control the temperature of the chilled water.
Approach in chiller is the temperature difference between the leaving chilled water and the entering chilled water.
A smaller approach indicates better chiller performance.
Approach can be controlled by adjusting the flow rate of the chilled water or the setpoint of the chiller.
Monitoring approach is important to ens
Factors affecting cooling tower efficiency include water quality, air flow, temperature differentials, and fouling.
Water quality - Impurities in water can reduce heat transfer efficiency.
Air flow - Proper air flow is essential for heat exchange.
Temperature differentials - Larger differentials between hot and cold water improve efficiency.
Fouling - Buildup of scale or debris can decrease efficiency.
I was interviewed in Feb 2023.
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
Good and some communication questions were asked
It was very good and asking dsa answers
I applied via Job Portal
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
posted on 31 Mar 2024
I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.
Seeking new challenges and opportunities for growth.
Looking for new challenges and opportunities to learn and grow
Interested in working on different projects or industries
Seeking a better work-life balance or company culture
Want to relocate to a different city or country for personal reasons
I applied via Naukri.com and was interviewed before Oct 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Aug 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Production Supervisor
530
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Officer
375
salaries
| ₹0 L/yr - ₹0 L/yr |
Territory Sales Supervisor
325
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Officer
236
salaries
| ₹0 L/yr - ₹0 L/yr |
Operation Assistant
229
salaries
| ₹0 L/yr - ₹0 L/yr |
Apollo Tyres
Ceat Tyres
Balkrishna Industries
JK Tyres