posted on 15 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
To close travers error calculation, use the formula 2n-4.
To close travers error calculation, substitute the value of n into the formula 2n-4.
For example, if n=3, the calculation would be 2(3)-4 = 6-4 = 2.
I was interviewed in Nov 2024.
Survey
Auto Level, Total Stesan, DGPS
posted on 3 Aug 2023
I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.
An auto level machine is a surveying instrument used to measure height differences and level surfaces.
Auto level machines use a compensator to ensure accurate readings.
They are commonly used in construction, land surveying, and civil engineering.
Examples of auto level machines include Leica NA700 Series and Topcon AT-B Series.
True north is the direction towards the geographic North Pole, while magnetic north is the direction towards the north magnetic pole.
True north is fixed and does not change over time, while magnetic north constantly shifts due to changes in the Earth's magnetic field.
True north is used for navigation on maps and charts, while magnetic north is used by compasses.
The angle between true north and magnetic north is called ...
The first surveyor in India is George Everest, who served as the Surveyor General of India from 1830 to 1843.
George Everest was appointed as the Surveyor General of India in 1830.
He is known for his work in mapping the Indian subcontinent, including the measurement of the height of Mount Everest which was later named after him.
Everest's tenure as Surveyor General of India laid the foundation for modern mapping and surv
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
posted on 16 Nov 2024
I applied via LinkedIn and was interviewed before Nov 2023. There was 1 interview round.
Traversing is a surveying technique used to determine the relative positions of points on the earth's surface.
Traversing involves measuring angles and distances between survey points.
It is used to create a network of connected points for mapping or construction purposes.
Traversing can be done using various methods such as compass and tape, theodolite, or GPS.
Errors in traversing can be minimized by using proper techniq...
posted on 12 Dec 2023
I applied via LinkedIn and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
posted on 13 Dec 2021
I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.
based on 3 interviews
Interview experience
based on 18 reviews
Rating in categories
Engineer
871
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Senior Engineer
846
salaries
| ₹3.2 L/yr - ₹11.5 L/yr |
Associate Manager
491
salaries
| ₹4.8 L/yr - ₹15.8 L/yr |
Mechanical Engineer
407
salaries
| ₹2 L/yr - ₹9 L/yr |
Civil Engineer
339
salaries
| ₹2.2 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company