Filter interviews by
I applied via Newspaper Ad and was interviewed before May 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Oct 2021. There were 2 interview rounds.
I appeared for an interview in Aug 2021.
I applied via Newspaper Ad and was interviewed before Apr 2021. There were 3 interview rounds.
Hard work versus smart work.
The power plug earth wire is bigger in size to ensure safety and prevent electrical shocks.
The earth wire provides a path for the current to flow in case of a fault or short circuit.
A larger wire size reduces resistance and allows for the safe dissipation of excess current.
It helps to protect individuals and equipment from electric shock hazards.
The earth wire is connected to the ground, which acts as a reference point...
Copper (Cu) conductor will take larger current than Aluminum (Al) conductor of the same size.
Copper has a higher electrical conductivity than Aluminum.
Copper has a lower resistivity than Aluminum.
Copper has better thermal conductivity than Aluminum.
Copper is more commonly used in high-current applications.
Aluminum is often used in overhead power transmission lines due to its lighter weight.
Pulse width modulation (PWM) is a technique used in VFD to control the speed of the motor by adjusting the width of the pulses of voltage supplied to the motor.
PWM is a method of controlling the amount of power delivered to a load without changing the voltage level.
In VFD, PWM is used to control the speed of the motor by varying the width of the pulses of voltage supplied to the motor.
The width of the pulses is control...
Mecon interview questions for popular designations
Get interview-ready with Top Mecon Interview Questions
I applied via Walk-in and was interviewed before Dec 2019. There were 4 interview rounds.
Disputes can be resolved through negotiation, mediation, arbitration or litigation.
Negotiation involves discussion and compromise to reach a mutually acceptable solution.
Mediation involves a neutral third party who helps the parties reach a settlement.
Arbitration involves a neutral third party who makes a binding decision after hearing both sides.
Litigation involves taking the dispute to court and having a judge or jur...
posted on 9 Jan 2018
Top trending discussions
The duration of Mecon interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 37 interviews
Interview experience
Assistant Project Engineer
371
salaries
| ₹2.6 L/yr - ₹7 L/yr |
Executive
171
salaries
| ₹6 L/yr - ₹13.5 L/yr |
Executive Engineer
96
salaries
| ₹6 L/yr - ₹12 L/yr |
Project Engineer
83
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Senior Manager
50
salaries
| ₹13 L/yr - ₹30 L/yr |
Hindustan Zinc
Vedanta Aluminium
Vedanta Resources
Carborundum Universal Limited