Mecon Project Engineer Interview Questions and Answers

Updated 18 Aug 2023

Mecon Project Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical,hr,present past detail of work
  • Q2. Whatever they ask during pannel demands

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep calm and present yourself whatever you are. Eye to eye contact during communication.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Basic knowledge of civil engineering
  • Ans. 

    Clear cover, steel unit weight, leveling, shuttering , quantity of concrete

  • Answered by Leeladhar Patnaik
  • Q2. What is civil engineering
  • Ans. 

    Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.

    • Involves designing and constructing buildings, bridges, roads, dams, and other structures

    • Focuses on ensuring structures are safe, functional, and sustainable

    • Requires knowledge of materials, construction techniques, and project management

    • Involves collaboration with architects, contractors, an...

  • Answered by AI
  • Q3. RCC design grade of concrete
  • Ans. 

    RCC design grade of concrete refers to the strength of the concrete mix used in reinforced concrete construction.

    • RCC design grade is denoted by a number followed by 'M' (e.g. M20, M30, etc.)

    • Higher grade concrete (e.g. M30) is used for structures requiring higher strength like bridges and high-rise buildings

    • Lower grade concrete (e.g. M20) is used for general construction purposes like residential buildings

  • Answered by AI
  • Q4. Bar bending scheduling
  • Q5. Work planning of job
  • Ans. 

    Work planning of job involves creating a detailed schedule and timeline for completing tasks and projects.

    • Identify project goals and objectives

    • Break down tasks into smaller components

    • Estimate time and resources needed for each task

    • Create a timeline with deadlines for each task

    • Assign responsibilities to team members

    • Regularly review and adjust the plan as needed

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What are you doing In person previous company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is Gant chart
  • Ans. 

    A Gantt chart is a visual representation of a project schedule that shows the start and finish dates of various elements of the project.

    • Gantt charts are used to plan, schedule, and track project progress

    • They show tasks, milestones, dependencies, and timelines in a graphical format

    • Commonly used in project management to communicate project status and timelines

    • Example: Task 1 starts on Monday and ends on Friday, Task 2 st

  • Answered by AI
  • Q2. Gant chart is the method for schedule and monitoring project Progress.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Basic knowledge of civil engineering
  • Ans. 

    Clear cover, steel unit weight, leveling, shuttering , quantity of concrete

  • Answered by Leeladhar Patnaik
  • Q2. What is civil engineering
  • Ans. 

    Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.

    • Involves designing and constructing buildings, bridges, roads, dams, and other structures

    • Focuses on ensuring structures are safe, functional, and sustainable

    • Requires knowledge of materials, construction techniques, and project management

    • Involves collaboration with architects, contractors, an...

  • Answered by AI
  • Q3. RCC design grade of concrete
  • Ans. 

    RCC design grade of concrete refers to the strength of the concrete mix used in reinforced concrete construction.

    • RCC design grade is denoted by a number followed by 'M' (e.g. M20, M30, etc.)

    • Higher grade concrete (e.g. M30) is used for structures requiring higher strength like bridges and high-rise buildings

    • Lower grade concrete (e.g. M20) is used for general construction purposes like residential buildings

  • Answered by AI
  • Q4. Bar bending scheduling
  • Q5. Work planning of job
  • Ans. 

    Work planning of job involves creating a detailed schedule and timeline for completing tasks and projects.

    • Identify project goals and objectives

    • Break down tasks into smaller components

    • Estimate time and resources needed for each task

    • Create a timeline with deadlines for each task

    • Assign responsibilities to team members

    • Regularly review and adjust the plan as needed

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is slump test
  • Ans. 

    Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.

    • Slump test involves filling a cone-shaped mold with concrete, then removing the mold and measuring how much the concrete slumps or settles.

    • The amount of slump indicates the workability of the concrete mix - higher slump means more workable mix.

    • Slump test helps in ensuring that the concrete mix has the r...

  • Answered by AI
  • Q2. M30 grade concrete ratio
  • Ans. 

    M30 grade concrete ratio is 1:1:2 (cement:sand:aggregate)

    • M30 grade concrete has a ratio of 1:1:2 for cement:sand:aggregate

    • This means for every part of cement, there is an equal part of sand and double the part of aggregate

    • For example, for 1 cubic meter of M30 concrete, you would need 1 part cement, 1 part sand, and 2 parts aggregate

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. What is slum test
  • Ans. 

    Slum test is a method used to assess the quality of concrete by observing the flow of concrete through a standard slump cone.

    • Slump test is performed by filling a slump cone with freshly mixed concrete, then lifting the cone and measuring the amount of slump or settlement of the concrete.

    • The result of the slump test indicates the workability of the concrete mixture, with different slumps corresponding to different level...

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What are you doing In person previous company
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is IRR in project?
  • Ans. 

    IRR stands for Internal Rate of Return in project management, which is a metric used to evaluate the profitability of a project.

    • IRR is a financial metric used to calculate the profitability of an investment or project.

    • It represents the discount rate that makes the net present value (NPV) of all cash flows from a project equal to zero.

    • A higher IRR indicates a more profitable project, while a lower IRR may signal potenti...

  • Answered by AI
  • Q2. What is Project Safety?
  • Ans. 

    Project safety refers to the measures and protocols put in place to ensure the well-being and security of all individuals involved in a project.

    • Ensuring compliance with safety regulations and standards

    • Implementing safety training for all project team members

    • Conducting regular safety inspections and audits

    • Providing personal protective equipment (PPE) when necessary

    • Creating emergency response plans and protocols

    • Examples:...

  • Answered by AI
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about our pas job experience & role.

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing to worry, everything will be all right. Be bindas. It's better not to join TRLK.

Mecon Interview FAQs

How many rounds are there in Mecon Project Engineer interview?
Mecon interview process usually has 2 rounds. The most common rounds in the Mecon interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Mecon Project Engineer Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more
Mecon Project Engineer Salary
based on 83 salaries
₹3.5 L/yr - ₹10 L/yr
27% more than the average Project Engineer Salary in India
View more details

Mecon Project Engineer Reviews and Ratings

based on 19 reviews

4.2/5

Rating in categories

3.5

Skill development

3.9

Work-life balance

3.0

Salary

3.3

Job security

3.4

Company culture

1.9

Promotions

3.6

Work satisfaction

Explore 19 Reviews and Ratings
Assistant Project Engineer
384 salaries
unlock blur

₹2.6 L/yr - ₹7 L/yr

Executive
170 salaries
unlock blur

₹5.8 L/yr - ₹13.7 L/yr

Executive Engineer
96 salaries
unlock blur

₹5 L/yr - ₹15 L/yr

Project Engineer
83 salaries
unlock blur

₹3.5 L/yr - ₹10 L/yr

Senior Manager
50 salaries
unlock blur

₹13 L/yr - ₹30 L/yr

Explore more salaries
Compare Mecon with

Engineers India

4.3
Compare

BHEL

4.1
Compare

TCS

3.7
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview