Filter interviews by
I applied via Company Website and was interviewed in Apr 2022. There were 3 interview rounds.
Technical round , personal skills, work experience
Top trending discussions
posted on 24 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There were 3 interview rounds.
PF can be corrected by updating the details in the PF portal and submitting necessary documents.
Update personal details in the PF portal
Submit required documents for correction
Contact HR or PF department for assistance
Energy saving procedures include optimizing lighting, HVAC systems, and equipment usage.
Implement energy-efficient lighting such as LED bulbs
Regularly maintain and tune HVAC systems for optimal performance
Use programmable thermostats to control heating and cooling
Turn off equipment when not in use to reduce standby power consumption
TPM procedures refer to Total Productive Maintenance practices aimed at maximizing equipment effectiveness and minimizing downtime.
TPM involves proactive maintenance to prevent breakdowns
Focuses on improving overall equipment efficiency
Involves training employees on equipment maintenance
Includes regular inspections and cleaning schedules
Utilizes tools like OEE (Overall Equipment Effectiveness) to measure performance
Criticality of machines can be identified based on their impact on production, safety, and downtime. They can be categorized as critical, essential, or non-essential.
Identify machines critical to production processes, where failure can lead to significant downtime or loss of revenue.
Consider machines critical to safety, where failure can pose a risk to employees or the environment.
Categorize machines as critical, essen...
Seeking new challenges and opportunities for professional growth.
Looking for new challenges and opportunities to learn and grow
Desire for career advancement and development
Seeking a more supportive work environment or better company culture
In about five years, I see myself leading a team of engineers, implementing innovative solutions, and contributing to the growth of the organization.
Leading a team of engineers in executing projects
Implementing innovative solutions to improve efficiency and quality
Contributing to the growth and success of the organization
Continuing professional development and learning new technologies
posted on 29 Aug 2024
Apti,core subject in engineering
I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.
DOL (Direct-On-Line) and star delta are two different wiring schemes used in electrical engineering for starting induction motors.
DOL wiring directly connects the motor to the power supply for starting, while star delta wiring initially starts the motor in star configuration and then switches to delta configuration for running.
DOL wiring is simpler and cheaper but causes high starting current, while star delta wiring r...
posted on 8 Jun 2023
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
posted on 18 May 2023
I applied via Approached by Company and was interviewed before May 2022. There were 4 interview rounds.
Technical questions related job titles and experiences and job role
posted on 12 May 2020
posted on 24 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There were 3 interview rounds.
PF can be corrected by updating the details in the PF portal and submitting necessary documents.
Update personal details in the PF portal
Submit required documents for correction
Contact HR or PF department for assistance
Energy saving procedures include optimizing lighting, HVAC systems, and equipment usage.
Implement energy-efficient lighting such as LED bulbs
Regularly maintain and tune HVAC systems for optimal performance
Use programmable thermostats to control heating and cooling
Turn off equipment when not in use to reduce standby power consumption
TPM procedures refer to Total Productive Maintenance practices aimed at maximizing equipment effectiveness and minimizing downtime.
TPM involves proactive maintenance to prevent breakdowns
Focuses on improving overall equipment efficiency
Involves training employees on equipment maintenance
Includes regular inspections and cleaning schedules
Utilizes tools like OEE (Overall Equipment Effectiveness) to measure performance
Criticality of machines can be identified based on their impact on production, safety, and downtime. They can be categorized as critical, essential, or non-essential.
Identify machines critical to production processes, where failure can lead to significant downtime or loss of revenue.
Consider machines critical to safety, where failure can pose a risk to employees or the environment.
Categorize machines as critical, essen...
Seeking new challenges and opportunities for professional growth.
Looking for new challenges and opportunities to learn and grow
Desire for career advancement and development
Seeking a more supportive work environment or better company culture
In about five years, I see myself leading a team of engineers, implementing innovative solutions, and contributing to the growth of the organization.
Leading a team of engineers in executing projects
Implementing innovative solutions to improve efficiency and quality
Contributing to the growth and success of the organization
Continuing professional development and learning new technologies
based on 1 interview
Interview experience
based on 23 reviews
Rating in categories
Assistant Project Engineer
370
salaries
| ₹2.6 L/yr - ₹7 L/yr |
Executive
170
salaries
| ₹5.8 L/yr - ₹13.5 L/yr |
Executive Engineer
98
salaries
| ₹5 L/yr - ₹12 L/yr |
Project Engineer
83
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Senior Manager
50
salaries
| ₹13 L/yr - ₹30 L/yr |
Engineers India
BHEL
TCS
Larsen & Toubro Limited