I applied via Referral and was interviewed before Apr 2020. There were 4 interview rounds.
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is a measure of how much mass is contained in a given volume of steel.
It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel alloy.
For example, the density of carbon steel is generally around 7.85...
Formula to find unit weight of steel
Unit weight of steel = Density of steel x Volume of steel
Density of steel = 7850 kg/m³
Volume of steel = Area of steel x Length of steel
Example: Unit weight of a 10mm diameter steel bar of length 1 meter = 0.785 x 1 x 7850 = 6162.25 grams
Example: Unit weight of a 12mm diameter steel bar of length 12 meters = 0.888 x 12 x 7850 = 835584 grams
The frog size of a brick refers to the distance between the two parallel sides of a brick.
The frog size is typically measured in millimeters.
It is important for proper bricklaying and mortar application.
The size of the frog can vary depending on the type and size of the brick.
For example, a standard brick may have a frog size of around 10-15mm.
Some bricks may not have a frog at all.
posted on 22 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
Look for key details such as dimensions, scale, title block, notes, and symbols.
Check the title block for project information, scale, and revision number.
Review the dimensions to understand the size and layout of the project.
Look for notes that provide important information or instructions.
Identify symbols that represent different elements or materials on the drawing.
Pay attention to any legends or key plans that expla
Observation of completed work is crucial to ensure quality and compliance with specifications.
Check if the work meets the design specifications
Inspect for any defects or deficiencies
Ensure proper materials and construction techniques were used
Verify that all safety standards were followed
Document any deviations or changes made during construction
I applied via Job Fair and was interviewed in Mar 2024. There were 2 interview rounds.
Bar bending schedule is a document detailing the shape, quantity, and cutting length of reinforcement bars in a construction project.
Bar bending schedule includes details such as bar mark, diameter, shape, length, and quantity of reinforcement bars.
Cutting length is the length of the reinforcement bar required for a specific shape and size in a structure.
Calculations for cutting length are based on the dimensions and s...
posted on 22 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
Look for key details such as dimensions, scale, title block, notes, and symbols.
Check the title block for project information, scale, and revision number.
Review the dimensions to understand the size and layout of the project.
Look for notes that provide important information or instructions.
Identify symbols that represent different elements or materials on the drawing.
Pay attention to any legends or key plans that expla
Observation of completed work is crucial to ensure quality and compliance with specifications.
Check if the work meets the design specifications
Inspect for any defects or deficiencies
Ensure proper materials and construction techniques were used
Verify that all safety standards were followed
Document any deviations or changes made during construction
I applied via Company Website and was interviewed in Nov 2022. There were 4 interview rounds.
Cube testing is a method used to determine the compressive strength of concrete cubes.
Cube testing involves casting concrete cubes and subjecting them to compressive forces.
The cubes are typically made of fresh concrete and cured under specific conditions.
After a specified curing period, the cubes are tested using a compression testing machine.
The compressive strength of the cubes is determined by dividing the maximum ...
Column testing is a process of evaluating the strength and stability of columns used in construction.
Column testing involves conducting various tests to determine the load-bearing capacity, deflection, and behavior of columns.
Common tests include compression tests, flexural tests, and shear tests.
The results of column testing help engineers ensure that columns meet design specifications and can safely support the inten...
Starter testing is the process of checking the functionality of the starter motor in a vehicle.
Starter testing involves checking the battery voltage, starter solenoid, and starter motor.
One common test is the voltage drop test, which checks for any resistance in the starter circuit.
Another test is the current draw test, which measures the amount of current the starter motor is drawing.
Starter testing is important to en...
Column testing is a process of evaluating the strength and stability of a column.
It involves applying a load to the column and measuring its deflection and strain.
The results are used to determine the column's load-carrying capacity and its ability to resist buckling.
Column testing is important in the design and construction of buildings and other structures.
Examples of column testing methods include axial compression ...
Qube testing is a type of compression testing used to determine the strength of concrete cubes.
It involves placing a concrete cube in a compression testing machine and applying a load until the cube fails.
The maximum load the cube can withstand is recorded and used to calculate the compressive strength of the concrete.
Qube testing is commonly used in construction projects to ensure the concrete used meets the required
Starter testing is the initial testing done to ensure that the system is ready for further testing.
Starter testing is done to identify any major issues or defects in the system before proceeding with further testing.
It includes basic tests like installation testing, configuration testing, and compatibility testing.
Starter testing helps in reducing the overall testing time and cost by identifying issues early on.
For exa...
Slab testing is the process of evaluating the strength and durability of concrete slabs.
Slab testing involves taking samples of concrete from the slab and subjecting them to various tests to determine their properties.
These tests may include compressive strength testing, flexural strength testing, and moisture content testing.
Slab testing is important to ensure that the concrete used in the slab is of sufficient qualit...
Slab area refers to the total area of a concrete slab used in construction.
Slab area is calculated by multiplying the length and width of the slab.
It is important to accurately calculate the slab area to determine the amount of materials needed for construction.
Slab area can vary depending on the design and purpose of the structure.
For example, the slab area of a residential building will be different from that of a co
The cost of a slab depends on various factors such as size, thickness, materials used, and labor costs.
The size of the slab affects the cost as larger slabs require more materials and labor
The thickness of the slab also affects the cost as thicker slabs require more materials and labor
The type of materials used for the slab affects the cost as some materials are more expensive than others
Labor costs vary depending on t...
Qube testing is a type of load testing used to determine the strength and stability of concrete structures.
Qube testing involves subjecting a small cube-shaped sample of concrete to a compressive load.
The load is gradually increased until the cube fails, and the maximum load it can withstand is recorded.
This information is used to determine the strength and stability of larger concrete structures, such as buildings and...
Slab area refers to the total area of a concrete slab.
Slab area is calculated by multiplying the length and width of the slab.
It is commonly used in construction to determine the amount of materials needed for the slab.
For example, if a slab is 10 feet by 10 feet, the slab area would be 100 square feet.
Make sure to learn according to your subject
I applied via Walk-in and was interviewed before May 2021. There was 1 interview round.
Deputy Manager
2.1k
salaries
| ₹9.7 L/yr - ₹22.6 L/yr |
Assistant Manager
1.9k
salaries
| ₹7 L/yr - ₹20 L/yr |
Manager
1.9k
salaries
| ₹11.2 L/yr - ₹39 L/yr |
Territory Sales Manager
380
salaries
| ₹9.6 L/yr - ₹31.9 L/yr |
Senior Manager
366
salaries
| ₹22 L/yr - ₹54 L/yr |
Tata Motors
Mahindra & Mahindra
Hero MotoCorp
Bajaj Auto