Filter interviews by
I applied via Recruitment Consultant and was interviewed in Sep 2021. There were 5 interview rounds.
Line balancing is the process of optimizing production line efficiency by evenly distributing workload among workstations.
It involves analyzing the production process and identifying bottlenecks
The goal is to minimize idle time and maximize productivity
Techniques used include time studies, work sampling, and process charts
Example: In a car assembly line, line balancing would involve ensuring that each workstation has a...
MOST stands for Mission Objective Strategy Tactics. It is a framework used in counselling to help clients achieve their goals.
MOST is a goal-oriented approach to counselling.
It involves identifying the client's mission, objective, strategy, and tactics.
Mission refers to the client's overall goal or purpose.
Objective refers to the specific outcome the client wants to achieve.
Strategy refers to the plan of action the cli...
VSM stands for Value Stream Mapping, a lean management tool used to analyze and improve the flow of materials and information in a process.
VSM is used to identify waste and inefficiencies in a process
It helps to visualize the current state of a process and design a future state
VSM includes mapping the flow of materials and information, calculating lead time and cycle time, and identifying bottlenecks
It is commonly used...
Talk time cycle time and lead time are terms used in call center management.
Talk time is the amount of time an agent spends talking to a customer during a call.
Cycle time is the total time an agent spends on a call, including talk time, hold time, and after-call work.
Lead time is the time it takes for an agent to answer a call from the moment it is received.
These terms are important in measuring call center performance...
VSM (Value Stream Mapping) can be applied by following a structured process to identify and eliminate waste in a process.
Identify the process to be mapped
Gather data on the process
Draw the current state map
Analyze the map to identify waste
Design the future state map
Implement changes to eliminate waste
Continuously monitor and improve the process
Top trending discussions
I applied via Campus Placement
My final year project was on developing a web-based inventory management system using Java and MySQL.
Developed using Java and MySQL
Web-based inventory management system
Implemented basic OOPs concepts
Used MVC architecture for better code organization
Included features like user authentication, product management, and order tracking
I applied via LinkedIn and was interviewed before Jun 2021. There were 2 interview rounds.
They give some topics related to present situation like in my GD in 2020 co. HR give topics related to that situation in our country like difference between offline education and online education system. and covid-19 pandemic related topics.
I applied via Naukri.com and was interviewed in Sep 2021. There were 2 interview rounds.
Types of test steps in software testing
Unit testing - testing individual units or components of the software
Integration testing - testing how different units or components work together
System testing - testing the entire system as a whole
Acceptance testing - testing if the software meets the requirements and is ready for release
Regression testing - testing to ensure that changes or updates to the software did not intro...
I applied via Walk-in and was interviewed before Nov 2021. There was 1 interview round.
Static class and static constructor in C#
Static class can only contain static members and cannot be instantiated
Static constructor is called only once when the class is first accessed
Static constructor is used to initialize static members of the class
Example: Math class in C# is a static class
Example: static constructor can be used to initialize a static variable with a value
Performance improvement in Angular app
Use lazy loading to load modules on demand
Optimize change detection strategy
Use trackBy function in ngFor loops
Minimize DOM manipulation
Use AOT compilation
Implement server-side rendering
Use web workers for heavy computations
Use caching for frequently accessed data
based on 19 reviews
Rating in categories
Manager
6
salaries
| ₹10 L/yr - ₹15 L/yr |
Assistant Manager
6
salaries
| ₹5 L/yr - ₹7.6 L/yr |
Senior Counsellor
5
salaries
| ₹9 L/yr - ₹10.1 L/yr |
Deputy Manager
4
salaries
| ₹7 L/yr - ₹10.1 L/yr |
Senior Manager
4
salaries
| ₹10 L/yr - ₹18 L/yr |
TCS
Accenture
Wipro
Cognizant