Cube testing is a method used to determine the compressive strength of concrete cubes.
Cube testing involves casting concrete cubes and subjecting them to compressive forces.
The cubes are typically made of fresh concrete and cured under specific conditions.
After a specified curing period, the cubes are tested using a compression testing machine.
The compressive strength of the cubes is determined by dividing the maximum ...
Column testing is a process of evaluating the strength and stability of columns used in construction.
Column testing involves conducting various tests to determine the load-bearing capacity, deflection, and behavior of columns.
Common tests include compression tests, flexural tests, and shear tests.
The results of column testing help engineers ensure that columns meet design specifications and can safely support the inten...
Starter testing is the process of checking the functionality of the starter motor in a vehicle.
Starter testing involves checking the battery voltage, starter solenoid, and starter motor.
One common test is the voltage drop test, which checks for any resistance in the starter circuit.
Another test is the current draw test, which measures the amount of current the starter motor is drawing.
Starter testing is important to en...
Column testing is a process of evaluating the strength and stability of a column.
It involves applying a load to the column and measuring its deflection and strain.
The results are used to determine the column's load-carrying capacity and its ability to resist buckling.
Column testing is important in the design and construction of buildings and other structures.
Examples of column testing methods include axial compression ...
Qube testing is a type of compression testing used to determine the strength of concrete cubes.
It involves placing a concrete cube in a compression testing machine and applying a load until the cube fails.
The maximum load the cube can withstand is recorded and used to calculate the compressive strength of the concrete.
Qube testing is commonly used in construction projects to ensure the concrete used meets the required
Starter testing is the initial testing done to ensure that the system is ready for further testing.
Starter testing is done to identify any major issues or defects in the system before proceeding with further testing.
It includes basic tests like installation testing, configuration testing, and compatibility testing.
Starter testing helps in reducing the overall testing time and cost by identifying issues early on.
For exa...
Slab testing is the process of evaluating the strength and durability of concrete slabs.
Slab testing involves taking samples of concrete from the slab and subjecting them to various tests to determine their properties.
These tests may include compressive strength testing, flexural strength testing, and moisture content testing.
Slab testing is important to ensure that the concrete used in the slab is of sufficient qualit...
Slab area refers to the total area of a concrete slab used in construction.
Slab area is calculated by multiplying the length and width of the slab.
It is important to accurately calculate the slab area to determine the amount of materials needed for construction.
Slab area can vary depending on the design and purpose of the structure.
For example, the slab area of a residential building will be different from that of a co
The cost of a slab depends on various factors such as size, thickness, materials used, and labor costs.
The size of the slab affects the cost as larger slabs require more materials and labor
The thickness of the slab also affects the cost as thicker slabs require more materials and labor
The type of materials used for the slab affects the cost as some materials are more expensive than others
Labor costs vary depending on t...
Qube testing is a type of load testing used to determine the strength and stability of concrete structures.
Qube testing involves subjecting a small cube-shaped sample of concrete to a compressive load.
The load is gradually increased until the cube fails, and the maximum load it can withstand is recorded.
This information is used to determine the strength and stability of larger concrete structures, such as buildings and...
Slab area refers to the total area of a concrete slab.
Slab area is calculated by multiplying the length and width of the slab.
It is commonly used in construction to determine the amount of materials needed for the slab.
For example, if a slab is 10 feet by 10 feet, the slab area would be 100 square feet.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
I applied via Job Portal and was interviewed before May 2023. There were 2 interview rounds.
I was interviewed before Jan 2024.
The question is asking about the candidate's last drawn salary (CTC).
CTC stands for Cost to Company and refers to the total salary package of an employee including all benefits and perks.
The candidate should provide the exact amount or range of their last drawn CTC.
It is important to be honest and transparent about the last CTC to negotiate effectively for the new role.
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
My expected CTC is in line with industry standards for a Sr. Engineer role.
Research industry standards for Sr. Engineer roles in the current market
Consider my years of experience, skills, and qualifications when determining my expected CTC
Be open to negotiation based on the overall compensation package offered
Star-Delta wiring diagram involves connecting a motor in two different configurations for starting and running.
Star connection involves connecting all three terminals of the motor windings together to form a star shape.
Delta connection involves connecting the terminals in a triangular shape.
Switching between star and delta configurations is done using a special motor starter.
Star-Delta wiring is commonly used for reduc...
Star-delta ladder logic is used to control the starting method of a three-phase induction motor.
Use two sets of contactors to switch between star and delta connections.
Implement a timer to delay the transition from star to delta.
Include overload protection for the motor.
Ensure proper interlocking to prevent simultaneous connection of star and delta.
Test the ladder logic thoroughly before implementation.
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Project Management related What is Your Previous Experience .
based on 3 reviews
Rating in categories
Deputy Manager
2.8k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
2.3k
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
1.5k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
815
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Motors
Maruti Suzuki
Ashok Leyland
Hero MotoCorp