I was interviewed in Jan 2025.

Round 1 - Technical 

(6 Questions)

  • Q1. What are the different levels of scheduling?
  • Q2. What is your understanding of Earned Value Management (EVM) in project management?
  • Q3. What is the basic life cycle of a project?
  • Q4. What is the significance of activity relationships in Primavera project management software?
  • Q5. What is the critical path in project management?
  • Q6. What is the difference between planning and scheduling?

Interview Preparation Tips

Interview preparation tips for other job seekers - Study extensively about Primavera P6 software and its application in project management.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the hydraulic gradient line?
  • Q2. What are the methods for managing floods?
  • Q3. What is prestress concrete?
  • Q4. What is Flood Wall?

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain a positive attitude and demonstrate a willingness to learn.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Dec 2024.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What is Total Float (TF) and Free Float(FF)?
  • Q2. What is your understanding of Earned Value Analysis (EVA)?
  • Q3. What are the key aspects to consider in delay analysis?
  • Q4. How would you rate your proficiency in P6/MSP on a scale of 1 to 10?
  • Q5. What are the different types of contracts?
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Thiagarajar College of Engineering, Madurai and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Basic topics like India before covid and after covid, Global warming, Educational System in india

Round 2 - Technical 

(4 Questions)

  • Q1. What is transformer?
  • Ans. 

    A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Consists of two coils of wire, known as primary and secondary coils

    • Primary coil receives electrical energy and induces a magnetic field

    • Magnetic field then induces a voltage in the secondary coil

    • Used to step up or step down voltage levels in electrical systems

  • Answered by AI
  • Q2. What are the types of Rectifiers?
  • Ans. 

    Types of rectifiers include half-wave, full-wave, and bridge rectifiers.

    • Half-wave rectifier only allows one half of the AC input waveform to pass through

    • Full-wave rectifier allows both halves of the AC input waveform to pass through

    • Bridge rectifier uses four diodes to rectify the AC input waveform

    • Examples include diode rectifiers and semiconductor rectifiers

  • Answered by AI
  • Q3. Difference between Synchronous and induction motor
  • Ans. 

    Synchronous motors have constant speed and require external excitation, while induction motors have variable speed and are self-starting.

    • Synchronous motors have a constant speed determined by the frequency of the power supply.

    • Induction motors have variable speed depending on the load.

    • Synchronous motors require external excitation to generate a magnetic field, while induction motors are self-starting.

    • Synchronous motors ...

  • Answered by AI
  • Q4. What is Ohms law?
  • Ans. 

    Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, and inversely proportional to the resistance of the conductor.

    • Ohm's law is represented by the formula: V = I * R, where V is voltage, I is current, and R is resistance.

    • It helps in calculating the relationship between voltage, current, and resistance in an electrical circuit.

    • For example, if a circuit has a vo...

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Will you ready to go to abroad after 5 years?
  • Ans. 

    Yes, I am open to the possibility of going abroad after 5 years for career advancement and new experiences.

    • I am open to exploring international opportunities for career growth.

    • I believe working abroad can provide valuable experiences and broaden my perspective.

    • I am willing to adapt to new cultures and environments for professional development.

  • Answered by AI
  • Q2. Why you have not choose higher education
  • Ans. 

    I chose to start working in the electrical field to gain practical experience and skills rather than pursuing higher education.

    • Prefer hands-on learning over theoretical education

    • Opportunity to gain real-world experience in the field

    • Financial constraints prevented pursuing higher education

    • Passionate about electrical work and wanted to start career sooner

  • Answered by AI
  • Q3. Family details and Occupation

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic interview and speak confidently
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Procedure about maintenance
  • Ans. 

    Maintenance procedures involve regular inspections, testing, and repairs to ensure equipment functionality and safety.

    • Regularly schedule maintenance tasks to prevent breakdowns and ensure equipment longevity

    • Conduct thorough inspections to identify potential issues before they escalate

    • Keep detailed records of maintenance activities and equipment history

    • Train staff on proper maintenance procedures and safety protocols

    • Uti...

  • Answered by AI
  • Q2. Knowledge about LOTO
  • Q3. Haw to maintain a battery bank
  • Ans. 

    To maintain a battery bank, regular inspections, proper charging, temperature control, and monitoring electrolyte levels are essential.

    • Perform regular inspections to check for signs of corrosion, leaks, or damage

    • Ensure proper charging by following manufacturer's guidelines and avoiding overcharging

    • Control temperature to prevent overheating or freezing, which can reduce battery life

    • Monitor electrolyte levels and top up ...

  • Answered by AI
  • Q4. Asking about ptw
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Ducting types youed
  • Q2. Ducting any types of material
  • Q3. Mep for explain
  • Q4. Mep basic form housed property
  • Q5. Electrical line
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - HR 

(2 Questions)

  • Q1. General discussion for HR
  • Q2. General discussion regarding current salarie.
Round 2 - Technical 

(2 Questions)

  • Q1. It was related to EDMS
  • Q2. It was related to sharepoint documentation.
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - HR 

(3 Questions)

  • Q1. About yourself and experience details
  • Q2. Salary expect
  • Q3. Excel test of 2 mints typing and Salary working in excel

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go for interview for name sake conducting. I went in morning till night I was in interview only totally 5 round of interview wast of time.
After excel test one person will tell will update you later and send us home total time wast & worst process of interview.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(8 Questions)

  • Q1. Can you tell me about yourself?
  • Ans. 

    I am a dedicated and experienced Project Control Engineer with a strong background in managing project schedules, budgets, and resources.

    • Over 5 years of experience in project control and management

    • Proficient in using project management software such as Primavera P6 and Microsoft Project

    • Skilled in analyzing project data and providing accurate forecasts

    • Strong communication and teamwork skills, able to collaborate with cr...

  • Answered by AI
  • Q2. What are the basics of Primavera?
  • Ans. 

    Primavera is a project management software used for planning, scheduling, and controlling projects.

    • Primavera is commonly used in industries such as construction, engineering, and manufacturing.

    • It allows users to create project schedules, allocate resources, track progress, and analyze project performance.

    • Users can generate reports, monitor costs, and manage risks within the software.

    • Primavera offers features like Gantt...

  • Answered by AI
  • Q3. What types of activities are there?
  • Q4. What are the different types of relationships?
  • Ans. 

    Different types of relationships include familial, romantic, professional, and platonic relationships.

    • Familial relationships: relationships between family members such as parents, siblings, and children.

    • Romantic relationships: intimate relationships between partners or spouses.

    • Professional relationships: relationships between colleagues or business partners.

    • Platonic relationships: non-romantic relationships based on fr

  • Answered by AI
  • Q5. How can you create a schedule?
  • Ans. 

    A schedule can be created by identifying project tasks, estimating durations, sequencing tasks, assigning resources, and setting milestones.

    • Identify all project tasks and break them down into smaller, manageable activities.

    • Estimate the duration of each task based on historical data or expert judgment.

    • Sequence the tasks in the order they need to be completed, considering dependencies between tasks.

    • Assign resources to ea...

  • Answered by AI
  • Q6. What is a look-ahead report?
  • Ans. 

    A look-ahead report is a document that outlines upcoming tasks, potential issues, and solutions for a project.

    • Provides a snapshot of upcoming project activities

    • Highlights potential roadblocks and proposed solutions

    • Helps project team anticipate and plan for future challenges

    • Usually covers a short-term period, such as the next week or month

  • Answered by AI
  • Q7. What are the steps to create a look-ahead report?
  • Ans. 

    Steps to create a look-ahead report

    • Identify the project milestones and deadlines

    • Review the project schedule and identify upcoming tasks

    • Analyze potential risks and delays

    • Update the look-ahead report with current progress and forecasted completion dates

    • Communicate the report to stakeholders for awareness and decision-making

  • Answered by AI
  • Q8. What are the 14 points of the DCMA (Defense Contract Management Agency)?
  • Ans. 

    The 14 points of the DCMA are guidelines for effective project management in defense contracts.

    • Establish clear project objectives and requirements

    • Develop a realistic project schedule

    • Assign responsibilities and authorities clearly

    • Ensure adequate resources are available

    • Maintain open communication with stakeholders

    • Identify and manage project risks

    • Monitor and control project performance

    • Implement corrective actions when nec...

  • Answered by AI
Round 2 - Technical 

(5 Questions)

  • Q1. What is earned value management?
  • Ans. 

    Earned value management is a project management technique for measuring project performance and progress.

    • Compares actual work completed and costs incurred to planned work and costs

    • Helps in forecasting project outcomes based on current performance

    • Key metrics include Planned Value (PV), Earned Value (EV), and Actual Cost (AC)

    • Formula: EV = % of work completed * Total budget

    • Example: If a project is 50% complete and the tot...

  • Answered by AI
  • Q2. What are the key performance indicators?
  • Ans. 

    Key performance indicators are measurable values that demonstrate how effectively a company is achieving key business objectives.

    • KPIs are specific, quantifiable metrics used to track progress towards organizational goals.

    • They help in evaluating the success of a project or business by measuring performance in key areas.

    • Examples of KPIs for a Project Control Engineer may include project completion time, budget variance,

  • Answered by AI
  • Q3. A project scenario was provided, and I was required to identify the key performance indicators.
  • Q4. What are the various formulas used to calculate the Budget at Completion (BAC)?
  • Ans. 

    Formulas used to calculate Budget at Completion (BAC) in project control engineering.

    • BAC = Planned Value (PV) at completion

    • BAC = Actual Cost (AC) + Estimate to Complete (ETC)

    • BAC = Budgeted Cost of Work Scheduled (BCWS) + Budgeted Cost of Work Remaining (BCWR)

  • Answered by AI
  • Q5. Where do you see yourself in five years?
  • Ans. 

    In five years, I see myself as a senior project control engineer leading a team of professionals and successfully managing complex projects.

    • Continuing to enhance my project management skills through advanced training and certifications

    • Taking on more responsibilities and leadership roles within the organization

    • Successfully completing several high-profile projects and delivering exceptional results

    • Mentoring and guiding j...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations for this position?
  • Ans. 

    My salary expectations are in line with industry standards for a Project Control Engineer with my level of experience and qualifications.

    • Research industry standards for Project Control Engineer salaries

    • Consider my level of experience and qualifications

    • Be prepared to negotiate based on the overall compensation package offered

  • Answered by AI
  • Q2. What are the working hours that are suitable for you?
  • Ans. 

    I am flexible with working hours and can adapt to the needs of the project. I am willing to work overtime when necessary.

    • I am open to working flexible hours to accommodate project needs

    • I am willing to work overtime when required to meet project deadlines

    • I can adjust my schedule to align with team meetings or client requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When determining salary expectations, focus solely on the in-hand salary and do not factor in the travel allowance.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Reverse the string
  • Ans. 

    Reverse a given string

    • Use a loop to iterate through the characters of the string

    • Append each character to a new string in reverse order

    • Return the reversed string

  • Answered by AI
  • Q2. Merge sort on infinite linklist
  • Ans. 

    Merge sort cannot be directly applied to an infinite linked list due to its divide and conquer nature.

    • Merge sort requires dividing the list into smaller sublists, which is not possible with an infinite linked list.

    • One approach is to break the infinite linked list into finite chunks, sort each chunk using merge sort, and then merge the sorted chunks.

    • Another approach is to use a different sorting algorithm that can handl...

  • Answered by AI
  • Q3. Operating systems
  • Q4. System designing
  • Q5. Object oriented programming

Skills evaluated in this interview

Mace Group Interview FAQs

How to prepare for Mace Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Mace Group. The most common topics and skills that interviewers at Mace Group expect are HTTP, Project Delivery, Schema, Monitoring and Construction.

Tell us how to improve this page.

Mace Group Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
Adani Group Interview Questions
3.9
 • 178 Interviews
View all

Mace Group Reviews and Ratings

based on 39 reviews

3.8/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

4.0

Salary

3.3

Job security

3.8

Company culture

3.6

Promotions

3.7

Work satisfaction

Explore 39 Reviews and Ratings
Field Engineer

Mumbai

2-6 Yrs

Not Disclosed

Field Engineer - Building and Structural

Mumbai

2-7 Yrs

Not Disclosed

Assistant MEP Manager

Bangalore / Bengaluru

7-15 Yrs

Not Disclosed

Explore more jobs
Project Assistant
21 salaries
unlock blur

₹4.8 L/yr - ₹9.4 L/yr

Assistant Manager
8 salaries
unlock blur

₹10.4 L/yr - ₹13.5 L/yr

Project Manager
8 salaries
unlock blur

₹11.1 L/yr - ₹22 L/yr

Assistant Project Manager
8 salaries
unlock blur

₹5.4 L/yr - ₹15 L/yr

Senior Project Manager
6 salaries
unlock blur

₹36 L/yr - ₹39 L/yr

Explore more salaries
Compare Mace Group with

Larsen & Toubro Limited

4.0
Compare

Tata Group

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hiranandani group

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview