i
Oceaneering International
Filter interviews by
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
Reverse a given string
Use a loop to iterate through the characters of the string
Append each character to a new string in reverse order
Return the reversed string
Merge sort cannot be directly applied to an infinite linked list due to its divide and conquer nature.
Merge sort requires dividing the list into smaller sublists, which is not possible with an infinite linked list.
One approach is to break the infinite linked list into finite chunks, sort each chunk using merge sort, and then merge the sorted chunks.
Another approach is to use a different sorting algorithm that can handl...
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
Top trending discussions
60 aptitude que in 30 mins
Coding test- with 2 coding que
I applied via Campus Placement and was interviewed in Aug 2023. There were 3 interview rounds.
There were 20 MCQ and 2 coding questions related to dsa
We were given a topic and we're divided in team of 6 and 3 members from each team were selected for next round
JMS is Java Message Service, a messaging standard that allows Java applications to communicate with each other asynchronously.
JMS provides a way for applications to send and receive messages in a loosely coupled, reliable, and asynchronous manner.
PUT and GET are HTTP methods used for RESTful web services, not JMS.
In JMS, messages are sent using the 'send' method and received using the 'receive' method.
JMS supports two ...
To create a Spring Boot project, use Spring Initializr or Spring Tool Suite.
Use Spring Initializr to generate a project with required dependencies and settings
Or use Spring Tool Suite to create a new Spring Starter Project
Configure the project settings and dependencies as per requirements
Add necessary code and run the project using the embedded server
It was a group presentation
DCA analysis in reservoir refers to Decline Curve Analysis, a method used to estimate future production rates of oil and gas wells.
DCA is a common technique in reservoir engineering to forecast production decline over time.
It involves fitting a decline curve to historical production data to predict future performance.
Different decline curve models like exponential, hyperbolic, and harmonic are used depending on the res...
posted on 30 May 2017
I was interviewed in Oct 2016.
posted on 1 Dec 2015
posted on 27 Aug 2015
posted on 29 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Design Engineer
94
salaries
| ₹0 L/yr - ₹0 L/yr |
CAD Engg
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Network Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineering Analyst
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineering Analyst
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Schlumberger
Halliburton
Baker Hughes
TechnipFMC