i
Oceaneering International
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 2 interview rounds.
Test includes GD&T , drawing and mechanical engg Questions
GD&T is used to create 2D drawings from 3D models in mechanical engineering design.
GD&T (Geometric Dimensioning and Tolerancing) is a set of symbols and rules used to define the geometry and allowable variations in a part or assembly.
The 3D model is first created using CAD software, and then the GD&T symbols are added to the model to define the dimensions, tolerances, and other requirements.
The 2D drawing is then gener...
Top trending discussions
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
posted on 20 Jul 2022
I applied via Company Website
Columns are vertical structures used for support while vessels are horizontal structures used for storage or transportation of fluids.
Columns are used for structural support while vessels are used for storage or transportation of fluids.
Columns are usually vertical while vessels are usually horizontal.
Columns are commonly found in buildings and bridges while vessels are commonly found in chemical plants and refineries.
...
Exchanger is a device used to transfer heat from one fluid to another.
Exchangers can be of various types such as shell and tube, plate, or spiral
They work on the principle of heat transfer through conduction
The hot fluid flows through the exchanger and transfers its heat to the cold fluid
The two fluids are kept separate by a barrier to prevent mixing
Exchangers are commonly used in HVAC systems, chemical plants, and ref
There are various types of permits required for mechanical work depending on the nature of the work.
There are hot work permits for welding and cutting operations.
Confined space permits for work in enclosed spaces.
Lockout/tagout permits for maintenance work on machinery.
Excavation permits for digging and trenching work.
Electrical permits for electrical work.
Permits for working at heights.
Permits for hazardous materials ...
If a person is injured inside a confined space, I would follow a set of steps to ensure their safety and provide immediate medical attention if necessary.
Assess the situation and ensure personal safety before entering the confined space.
Call for help and inform the relevant authorities about the incident.
Provide first aid or CPR if trained and necessary.
If the injury is severe or life-threatening, evacuate the injured ...
I will follow the emergency procedures and evacuate the area immediately.
I will stop all ongoing work and shut down any equipment that can be safely shut down.
I will follow the emergency evacuation plan and exit the area as quickly as possible.
I will report to the designated assembly point and wait for further instructions.
If necessary, I will assist in the evacuation of others who may need help.
I will not return to th...
Necessary documents for a permit include risk assessment, work method statement, and safety procedures.
Risk assessment
Work method statement
Safety procedures
I applied via Approached by Company and was interviewed in Jun 2022. There were 2 interview rounds.
I applied via Newspaper Ad and was interviewed before May 2022. There were 2 interview rounds.
posted on 23 Jan 2022
I applied via Recruitment Consulltant and was interviewed in Jul 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2020. There was 1 interview round.
based on 3 reviews
Rating in categories
Design Engineer
93
salaries
| ₹3.5 L/yr - ₹12 L/yr |
CAD Engg
66
salaries
| ₹3 L/yr - ₹6.8 L/yr |
Network Engineer
43
salaries
| ₹4 L/yr - ₹16 L/yr |
Senior Engineering Analyst
39
salaries
| ₹9 L/yr - ₹18.6 L/yr |
Engineering Analyst
28
salaries
| ₹7.8 L/yr - ₹13 L/yr |
Schlumberger
Halliburton
Baker Hughes
TechnipFMC