I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
FDD field dry density test is a method to determine the density of soil in the field.
FDD stands for Field Dry Density.
It is a test conducted on soil to measure its density.
The test involves extracting a soil sample from the field and determining its dry weight and volume.
The dry density is calculated by dividing the dry weight of the soil sample by its volume.
This test helps in assessing the compaction and quality of s
The slump in column concreting should be between 150-175 mm.
The slump should be measured before pouring the concrete.
The slump should be consistent throughout the column.
The slump should not exceed 175 mm to avoid segregation.
The slump should not be less than 150 mm to ensure proper compaction.
The slump can be adjusted by adding water or admixtures.
The slump test should be performed according to ASTM standards.
Slump in column concreting 90 to 100 mm
Slump refers to the consistency of the concrete mix
A slump of 90 to 100 mm indicates a very wet and unstable mix
This can lead to issues with the structural integrity of the column
Possible causes include incorrect water-cement ratio or improper mixing
Solutions may include adjusting the mix proportions or using additives to improve stability
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There was 1 interview round.
I applied via Campus Placement
They will conduct English talent test
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
I have 5 years of experience in my previous company, where I started as a sales associate and worked my way up to a team leader role.
Started as a sales associate and quickly learned the ropes of the business
Consistently exceeded sales targets and was promoted to team leader within 2 years
Managed a team of 10 sales associates and implemented new training programs to improve performance
Collaborated with other departments...
I am a dedicated and experienced professional with a strong background in leadership and team management.
Over 5 years of experience in retail management
Proven track record of increasing sales and improving customer satisfaction
Strong communication and problem-solving skills
Led a team of 15 employees to exceed quarterly sales targets by 20%
I applied via Campus Placement and was interviewed in Jan 2023. There were 3 interview rounds.
Real estate related to the industry
I applied via Approached by Company and was interviewed in Dec 2022. There were 2 interview rounds.
OSHR design specification includes hardware and software requirements for the system.
Hardware requirements such as processor, memory, storage, and input/output devices.
Software requirements such as operating system, programming languages, and development tools.
Functional requirements such as user interface, data storage, and security features.
Non-functional requirements such as performance, reliability, and scalability...
The full form of FHTC is not clear. HDPE pipes have high strength and flexibility, while DI pipes are more durable. Wall thickness of water retaining structure depends on the design and load requirements.
FHTC full form is not clear
HDPE pipes have high strength and flexibility, making them suitable for underground installations and areas with high seismic activity
DI pipes are more durable and have a longer lifespan, mak...
The minimum required Sbc for raft foundation design of OHSR depends on various factors.
The size and weight of the OHSR
The soil type and bearing capacity
The depth of the foundation
The seismic zone of the location
Consulting a geotechnical engineer is recommended
The code of practice used for water retaining structures is BS EN 1992-3:2006.
BS EN 1992-3:2006 is the European standard for the design of concrete structures.
It provides guidelines for the design, construction, and maintenance of water retaining structures.
The code covers various types of water retaining structures such as reservoirs, tanks, and swimming pools.
It includes requirements for materials, structural design,...
A BOQ stands for Bill of Quantities, which is a document used in construction projects to list the materials, parts, and labor needed for a project.
A BOQ is typically prepared by a quantity surveyor or estimator.
It includes detailed information on quantities, unit rates, and total costs for each item in the project.
BOQs are used to help contractors and clients understand the scope of work and costs involved in a projec...
A contract is a legally binding agreement between two or more parties that outlines the terms and conditions of their relationship.
A contract must involve an offer, acceptance, consideration, and intention to create legal relations.
Contracts can be written or oral, but written contracts are generally more enforceable.
Examples of contracts include employment agreements, rental agreements, and sales contracts.
FIDIC stands for International Federation of Consulting Engineers, which publishes standard contracts for the construction industry.
FIDIC is an acronym for International Federation of Consulting Engineers.
FIDIC publishes standard contracts for the construction industry.
FIDIC contracts are commonly used in international construction projects.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
165
salaries
| ₹4.2 L/yr - ₹12.1 L/yr |
Deputy Manager
90
salaries
| ₹5 L/yr - ₹13.5 L/yr |
Manager
82
salaries
| ₹5.5 L/yr - ₹21.5 L/yr |
Senior Manager
78
salaries
| ₹6.5 L/yr - ₹25 L/yr |
Senior Executive
58
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Knight Frank
R.S. Infraprojects
SMEC
BPTP