Upload Button Icon Add office photos

Filter interviews by

Lokhandwala Infrastructure Interview Questions and Answers for Experienced

Updated 21 Oct 2021

Lokhandwala Infrastructure Interview Experiences for Experienced

1 interview found

Interview Questionnaire 

1 Question

  • Q1. Past experience and the basic tell me about yourself questions

Interview Preparation Tips

Interview preparation tips for other job seekers - My only advice is NOT TO APPLY FOR ANY JOB OPENINGS HERE IN THIS COMPANY. Salary is always late and not accurate at all. You will have to fight with the HR (who is least bothered even to answer a call or to even call you back or reply to your messages). Pathetic working environment. Toxic people and will let the actual working man power down because lot of boot lickers present in the company. You need to be an extreme BOOT LICKER if you want to sustain in this company. The only work that goes on here is playing office politics and bitching and gossiping. This is not the company you have to aim for if you want to grow. Zero positive feedback.

Customer Relationship Manager Interview Questions asked at other Companies

Q1. What are the best strategies to achieve positive results in a one-on-one interview round?
View answer (1)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the creak voltage ? Battery voltage?
  • Ans. 

    Creep voltage is the minimum voltage required to initiate the flow of current in a battery.

    • Creep voltage is also known as threshold voltage.

    • It is the voltage level at which a battery starts to discharge.

    • For example, a 9V battery may have a creep voltage of around 7V.

    • Creep voltage is important in determining the usable capacity of a battery.

  • Answered by AI
  • Q2. DG side starting point side need to simple starting volatage .that name is creak .
Round 3 - Technical 

(2 Questions)

  • Q1. Cooling system,AC docmation
  • Q2. Breaker working pricipal,DG maintenance,AC servicing
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
No response
Round 1 - Technical 

(1 Question)

  • Q1. How many Limit switch in tower crane.?
  • Ans. 

    The number of limit switches in a tower crane varies depending on the specific model and manufacturer.

    • The number of limit switches in a tower crane can range from 2 to 6 or more.

    • Limit switches are used to prevent the crane from overtraveling in certain directions or reaching unsafe positions.

    • Common types of limit switches in tower cranes include hoisting limit switches, trolley limit switches, and slewing limit switche

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Asked regarding job experience and how to tackles site if there are above 500 workmen.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What are the reasons of delay in a construction project?
  • Ans. 

    Delays in construction projects can be caused by various factors.

    • Weather conditions, such as heavy rain or extreme temperatures, can slow down construction progress.

    • Unforeseen site conditions, such as encountering unexpected underground utilities or poor soil quality, may require additional time for resolution.

    • Supply chain issues, including delays in material delivery or shortages, can impact project timelines.

    • Changes ...

  • Answered by AI
  • Q2. How do you track progress of project?
  • Ans. 

    I track progress of projects by setting clear goals, using project management tools, and regularly communicating with team members.

    • Set clear goals and objectives for the project

    • Break down the project into smaller tasks and milestones

    • Use project management tools such as Gantt charts or Kanban boards to track progress

    • Regularly communicate with team members to get updates on their tasks

    • Hold regular meetings or check-ins t...

  • Answered by AI
  • Q3. What all tasks you perform on daily basis?
  • Ans. 

    As an Assistant Manager, I perform a variety of tasks on a daily basis to ensure smooth operations and support the manager.

    • Overseeing daily operations and ensuring compliance with company policies

    • Managing and supervising staff, including scheduling and training

    • Assisting with customer service and resolving any issues or complaints

    • Monitoring inventory levels and placing orders as needed

    • Analyzing sales data and implementi...

  • Answered by AI
  • Q4. How do you manage stakeholders?
  • Ans. 

    I manage stakeholders by identifying their needs, communicating effectively, and building strong relationships.

    • Identify key stakeholders and their needs

    • Communicate regularly and effectively with stakeholders

    • Build strong relationships through trust and transparency

    • Address concerns and conflicts in a timely and respectful manner

    • Collaborate with stakeholders to achieve common goals

    • Provide regular updates and progress repo...

  • Answered by AI
  • Q5. What kind of projects you have done before?
  • Ans. 

    I have worked on various projects including team management, process improvement, and customer satisfaction.

    • Led a team of 10 employees to successfully implement a new inventory management system, resulting in a 20% reduction in stockouts.

    • Developed and executed a customer feedback program, resulting in a 15% increase in overall customer satisfaction.

    • Implemented a process improvement initiative that reduced production ti...

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Tell me about yourself?
  • Ans. 

    I am a highly motivated and experienced professional with a strong background in management and leadership.

    • I have over 5 years of experience in supervisory roles, where I successfully led teams and achieved targets.

    • I am skilled in strategic planning, problem-solving, and decision-making.

    • I have a proven track record of improving operational efficiency and customer satisfaction.

    • I am adept at building and maintaining stro...

  • Answered by AI
  • Q2. What is your current roles and responsibilities?
  • Ans. 

    I am currently responsible for managing a team and overseeing daily operations.

    • Managing a team of employees

    • Overseeing daily operations and ensuring smooth workflow

    • Setting goals and targets for the team

    • Monitoring performance and providing feedback

    • Handling customer complaints and resolving issues

    • Creating work schedules and assigning tasks

    • Training new employees and conducting performance evaluations

  • Answered by AI
  • Q3. What is your current salary and expectations?
  • Ans. 

    I am currently earning $50,000 per year and my salary expectations for the Assistant Manager position are in the range of $60,000 to $70,000 per year.

    • My current salary is $50,000 per year.

    • I am looking for a salary in the range of $60,000 to $70,000 per year for the Assistant Manager position.

    • I believe my skills and experience justify this salary expectation.

  • Answered by AI
  • Q4. What is your notice period?
  • Ans. 

    My notice period is 30 days.

    • I have a notice period of 30 days.

    • I am required to give a 30-day notice before leaving my current position.

    • I am contractually obligated to provide a 30-day notice period.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep it all genuine, short and to the point. What matters most is the ownership you take for your works and willingness to learn new things as and when required.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

You have to show your skills and be a good person

Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation to be done
  • Q2. Joining formalities to be fulfilled

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself, don't fake it, we will know if you do

I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Basic standard
  • Q2. Materials calculation, standard construction materials testing as i s standard requirement
  • Q3. How to solve construction problems, Quality, safety, Progress, time schedule
  • Ans. 

    To solve construction problems, quality, safety, progress, and time schedule, a project manager should prioritize communication, risk management, and continuous improvement.

    • Establish clear communication channels with all stakeholders

    • Identify potential risks and develop contingency plans

    • Regularly review and improve quality control processes

    • Ensure compliance with safety regulations and provide training to workers

    • Monitor

  • Answered by AI
  • Q4. What your strengths

Interview Preparation Tips

Interview preparation tips for other job seekers - Please answer which is right answer
Only. Answer Promptly

I applied via Approached by Company and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Hi what is your name
  • Ans. 

    I am manikandan diploma civil in 5 years experience sir

  • Answered Anonymously
  • Q2. Total work experience
  • Q3. I am manikandan from kallakurichi

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil construction in site engeenr

I applied via Job Portal and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Why should we hire you
  • Q2. What do you expect from us

Interview Preparation Tips

Interview preparation tips for other job seekers - Its Simple just be confident in front of the Interviewer Answer the questions in simple and easy words. Don't hesitate.

I applied via Referral and was interviewed in Oct 2021. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous project and technical questions
Round 3 - Technical 

(1 Question)

  • Q1. About my mistakes in previous projects
Round 4 - Technical 

(1 Question)

  • Q1. About waterproofing methods and applications and previous company details
Round 5 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Why are you looking for a change?
  • Q4. What are your strengths and weaknesses?
  • Q5. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn more about waterproofing. prepare about your mistakes and how did you overcome. Mostly online teams interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2019.

Interview Questionnaire 

1 Question

  • Q1. Work experience

Tell us how to improve this page.

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 332 Interviews
CBRE Interview Questions
4.2
 • 251 Interviews
NoBroker Interview Questions
3.1
 • 221 Interviews
Square Yards Interview Questions
4.1
 • 194 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
Sobha Interview Questions
3.9
 • 122 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
View all

Lokhandwala Infrastructure Reviews and Ratings

based on 23 reviews

3.6/5

Rating in categories

3.1

Skill development

3.4

Work-Life balance

3.0

Salary & Benefits

3.3

Job Security

3.1

Company culture

2.9

Promotions/Appraisal

3.2

Work Satisfaction

Explore 23 Reviews and Ratings
Finishing Manager
5 salaries
unlock blur

₹12.5 L/yr - ₹13.5 L/yr

Construction Management
4 salaries
unlock blur

₹14 L/yr - ₹33 L/yr

MEP Engineer
4 salaries
unlock blur

₹5.8 L/yr - ₹8.5 L/yr

Sales Manager
4 salaries
unlock blur

₹7 L/yr - ₹10.9 L/yr

Store Manager
4 salaries
unlock blur

₹8 L/yr - ₹12.1 L/yr

Explore more salaries
Compare Lokhandwala Infrastructure with

JLL

4.1
Compare

CBRE

4.2
Compare

Square Yards

4.1
Compare

NoBroker

3.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview