A Safety Supervisor was asked 4mo ago
Q. What is a Permit to Work (PTW)?
Ans. 

PTW stands for Permit to Work, a formal written system used to control certain types of work that are identified as potentially hazardous.

  • PTW is used to ensure that proper precautions are taken before starting work in hazardous environments.

  • It involves a formal written authorization that specifies the work to be done and the precautions to be taken.

  • Examples of work that may require a PTW include hot work, confined...

View all Safety Supervisor interview questions
A Safety Supervisor was asked 4mo ago
Q. What are the dangers of working at heights?
Ans. 

Height poses significant dangers due to potential falls and impact injuries.

  • Working at heights requires proper training and equipment to prevent falls

  • Potential hazards include unstable surfaces, improper scaffolding, and lack of guardrails

  • Fall protection measures such as harnesses, safety nets, and guardrails should be in place

  • Regular inspections and maintenance of equipment and structures at height are crucial to...

View all Safety Supervisor interview questions
A Senior Civil Engineer was asked 5mo ago
Q. What filter media are used?
Ans. 

Used filter media are materials used in filtration systems to remove impurities from water or air.

  • Sand

  • Activated carbon

  • Zeolite

  • Anthracite

  • Gravel

View all Senior Civil Engineer interview questions
A Senior Civil Engineer was asked 5mo ago
Q. What is the cement consumption for M-15 grade PCC per cubic meter?
Ans. 

The consumption of cement for M-15 grade PCC per cubic meter is typically around 240 kg.

  • The consumption of cement for M-15 grade PCC is usually around 240 kg per cubic meter.

  • This value may vary slightly based on factors such as mix design and site conditions.

  • It is important to accurately calculate the quantity of cement needed to ensure the strength and durability of the concrete.

  • For example, for a 1 cubic meter o...

View all Senior Civil Engineer interview questions
A QC Engineer was asked 11mo ago
Q. What tests are performed on soil material samples?
Ans. 

The number of tests for soil material samples varies depending on the specific requirements and standards.

  • The number of tests for soil material samples can range from a few basic tests to more comprehensive testing depending on the project requirements.

  • Common tests for soil material samples include moisture content, particle size distribution, compaction, and strength tests.

  • The number of tests may also depend on t...

View all QC Engineer interview questions
A Billing Engineer was asked
Q. What is the nominal cover for a pipeline?
Ans. 

Nominal cover for pipeline refers to the minimum thickness of concrete cover over the reinforcement in a pipeline.

  • Nominal cover is typically specified in project specifications or design drawings.

  • The purpose of nominal cover is to protect the reinforcement from corrosion and provide durability to the pipeline.

  • The nominal cover for pipelines can vary depending on factors such as the type of pipeline, environmental ...

View all Billing Engineer interview questions
A Senior Civil Engineer was asked
Q. What is the full form of HDPE Pipe?
Ans. 

HDPE stands for High-Density Polyethylene.

  • HDPE is a type of plastic pipe commonly used in various applications.

  • It is known for its high strength, durability, and resistance to corrosion.

  • HDPE pipes are widely used in water supply systems, sewage systems, gas distribution networks, and industrial applications.

  • They are lightweight, flexible, and easy to install.

  • HDPE pipes have a long service life and are environmenta...

View all Senior Civil Engineer interview questions
Are these interview questions helpful?
A Senior Civil Engineer was asked
Q. Why does heat occur in concrete?
Ans. 

Heat is generated in concrete due to exothermic chemical reactions during the hydration process.

  • Heat is generated during the chemical reaction between cement and water.

  • The heat generated can cause thermal expansion and cracking in concrete.

  • The amount of heat generated depends on the type of cement used and the curing conditions.

  • Heat can be controlled by using low-heat cement or by cooling the concrete during curin...

View all Senior Civil Engineer interview questions
A Billing Engineer was asked
Q. To calculate a BBS for footing.
Ans. 

To calculate a BBS for footing, you need to determine the size and spacing of reinforcement bars required for the footing construction.

  • Calculate the total area of the footing

  • Determine the design requirements for the footing (such as load capacity)

  • Select the appropriate size and spacing of reinforcement bars based on design requirements

  • Calculate the total length of reinforcement bars needed for the footing

  • Prepare a...

View all Billing Engineer interview questions

LCC Projects Interview Experiences

17 interviews found

QC Engineer Interview Questions & Answers

user image Anonymous

posted on 22 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Compaction test process Sand replace methard
  • Q2. What is no. Of test for soil Matairial sample
  • Ans. 

    The number of tests for soil material samples varies depending on the specific requirements and standards.

    • The number of tests for soil material samples can range from a few basic tests to more comprehensive testing depending on the project requirements.

    • Common tests for soil material samples include moisture content, particle size distribution, compaction, and strength tests.

    • The number of tests may also depend on the ty...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - What is good knowdhge of all the lab testing and reporting
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Conjmption of cement m-15 grade pcc per cum
  • Ans. 

    The consumption of cement for M-15 grade PCC per cubic meter is typically around 240 kg.

    • The consumption of cement for M-15 grade PCC is usually around 240 kg per cubic meter.

    • This value may vary slightly based on factors such as mix design and site conditions.

    • It is important to accurately calculate the quantity of cement needed to ensure the strength and durability of the concrete.

    • For example, for a 1 cubic meter of M-1...

  • Answered by AI
  • Q2. What are used filter media
  • Ans. 

    Used filter media are materials used in filtration systems to remove impurities from water or air.

    • Sand

    • Activated carbon

    • Zeolite

    • Anthracite

    • Gravel

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Salery discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Good irrigation growing company your skills used. Not any other dislike issue overall good company.

Interview Questions & Answers

user image Anonymous

posted on 1 Jan 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Assignment 

Assignment test and practical knowledge

Round 2 - Technical 

(4 Questions)

  • Q1. All material related
  • Q2. Aggregate and cement sand steel
  • Q3. Store grn process
  • Q4. Material stoking
Round 3 - HR 

(1 Question)

  • Q1. Salary any why change job

Interview Preparation Tips

Interview preparation tips for other job seekers - Revise all knowledge of working basik yo advance
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Notice period discussion
Round 2 - Technical 

(3 Questions)

  • Q1. Formula and process
  • Q2. Indian standard code knowledge
  • Q3. Engineering design knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company and culture

HR Executive Interview Questions & Answers

user image Anonymous

posted on 30 Dec 2023

Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. About your self
  • Q2. Notice period and salary details
Round 2 - Technical 

(2 Questions)

  • Q1. Technically knowledge
  • Q2. Legal and labor laws
Round 3 - HR 

(1 Question)

  • Q1. Salary bargaining

Senior Engineer Interview Questions & Answers

user image Anand mishra

posted on 1 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. About water tretment plant OHSR
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Mathematical Formula
  • Ans. 

    The question is asking for a mathematical formula.

    • Identify the variables and constants in the formula

    • Understand the relationship between the variables

    • Apply the formula to solve the problem

  • Answered by AI
  • Q2. Project Knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Good for first time job and growing company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Dangers level in height?
  • Ans. 

    Height poses significant dangers due to potential falls and impact injuries.

    • Working at heights requires proper training and equipment to prevent falls

    • Potential hazards include unstable surfaces, improper scaffolding, and lack of guardrails

    • Fall protection measures such as harnesses, safety nets, and guardrails should be in place

    • Regular inspections and maintenance of equipment and structures at height are crucial to prev...

  • Answered by AI
  • Q2. What is PTW?
  • Ans. 

    PTW stands for Permit to Work, a formal written system used to control certain types of work that are identified as potentially hazardous.

    • PTW is used to ensure that proper precautions are taken before starting work in hazardous environments.

    • It involves a formal written authorization that specifies the work to be done and the precautions to be taken.

    • Examples of work that may require a PTW include hot work, confined spac...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is a good company, Now it's Limited, providing good accommodation and salary come on time every month date 10 to 15 .
this company is running a pipeline company & Dam project, Canal project and some where Metro project..

Civil Engineer Interview Questions & Answers

user image Rahul verma

posted on 11 Mar 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Question related to working experience ,current CTC and other basic questions
Round 2 - Technical 

(1 Question)

  • Q1. Question related to QA/QC , pipe dia , jointing/fitting , IS code, structural work , DI /MS pipe work , type of pipe uses like HDPE, MDPE, DI k7/K9 etc
Round 3 - One-on-one 

(1 Question)

  • Q1. CTC discussion , location , allowance etc.

Interview Preparation Tips

Topics to prepare for LCC Projects Civil Engineer interview:
  • Prepare good knowlage of IS code
  • Knowlage about excaution work
  • Site management
  • Site Supervision
  • Site Planning
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Feb 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. To calculate a BBS for footing.
  • Ans. 

    To calculate a BBS for footing, you need to determine the size and spacing of reinforcement bars required for the footing construction.

    • Calculate the total area of the footing

    • Determine the design requirements for the footing (such as load capacity)

    • Select the appropriate size and spacing of reinforcement bars based on design requirements

    • Calculate the total length of reinforcement bars needed for the footing

    • Prepare a deta...

  • Answered by AI
  • Q2. How do you plan the project
  • Q3. What is the nominal cover for pipeline
  • Ans. 

    Nominal cover for pipeline refers to the minimum thickness of concrete cover over the reinforcement in a pipeline.

    • Nominal cover is typically specified in project specifications or design drawings.

    • The purpose of nominal cover is to protect the reinforcement from corrosion and provide durability to the pipeline.

    • The nominal cover for pipelines can vary depending on factors such as the type of pipeline, environmental condi...

  • Answered by AI
  • Q4. Why you are change the job

Interview Preparation Tips

Topics to prepare for LCC Projects Billing Engineer interview:
  • Bar Binding Schedule
  • IS Code
Interview preparation tips for other job seekers - Interview was very easy, you just have to be positive attitude. They prefer a mid range guy who expect low mid range salary.

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about LCC Projects?
Ask anonymously on communities.

LCC Projects Interview FAQs

How many rounds are there in LCC Projects interview?
LCC Projects interview process usually has 2 rounds. The most common rounds in the LCC Projects interview process are Technical, HR and Resume Shortlist.
How to prepare for LCC Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at LCC Projects. The most common topics and skills that interviewers at LCC Projects expect are Project Management, Budgeting, Coordination, Cost Estimation and Irrigation.
What are the top questions asked in LCC Projects interview?

Some of the top questions asked at the LCC Projects interview -

  1. FHTC full form & How to install connection for ...read more
  2. How can the project make good progress while keeping safety and quality in mi...read more
  3. What is the nominal cover for pipel...read more
How long is the LCC Projects interview process?

The duration of LCC Projects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

3.9/5

based on 28 interview experiences

Difficulty level

Easy 9%
Moderate 73%
Hard 18%

Duration

Less than 2 weeks 91%
2-4 weeks 9%
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 819 Interviews
Senco Gold Interview Questions
4.4
 • 568 Interviews
Planet Spark Interview Questions
3.8
 • 489 Interviews
Swiggy Interview Questions
3.8
 • 464 Interviews
Quess Interview Questions
3.8
 • 457 Interviews
Klm Axiva Finvest Interview Questions
4.4
 • 433 Interviews
TCS iON Interview Questions
3.9
 • 384 Interviews
ITC Infotech Interview Questions
3.7
 • 370 Interviews
Meesho Interview Questions
3.7
 • 361 Interviews
Udaan Interview Questions
3.9
 • 346 Interviews
View all

LCC Projects Reviews and Ratings

based on 207 reviews

4.3/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

4.1

Salary

3.8

Job security

4.0

Company culture

3.8

Promotions

3.9

Work satisfaction

Explore 207 Reviews and Ratings
Manager Budgeting // HO

Ahmedabad

4-9 Yrs

₹ 5-12 LPA

Sr. Manager-Legal // Head Office Ahmedabad

Ahmedabad

9-14 Yrs

Not Disclosed

Manager / Deputy Manager-Budgeting / Head Office

Ahmedabad

10-12 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
44 salaries
unlock blur

₹3.5 L/yr - ₹9 L/yr

Site Engineer
34 salaries
unlock blur

₹2.5 L/yr - ₹6 L/yr

Civil Site Engineer
25 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Civil Engineer
19 salaries
unlock blur

₹2 L/yr - ₹8.2 L/yr

Junior Engineer
17 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Explore more salaries
Compare LCC Projects with

Quess

3.8
Compare

L&T Construction

4.0
Compare

Ekart Logistics

3.9
Compare

Udaan

3.9
Compare
write
Share an Interview