Filter interviews by
Yes, I have implemented cost-saving measures and improved project efficiency through strategic planning and innovative solutions.
Implemented cost-saving measures such as optimizing material usage and reducing waste
Improved project efficiency through strategic planning and scheduling
Introduced innovative solutions to streamline processes and enhance productivity
I applied via Walk-in and was interviewed before Nov 2023. There were 2 interview rounds.
WTP and STP refer to water treatment plant and sewage treatment plant processes.
WTP involves processes like coagulation, flocculation, sedimentation, filtration, and disinfection to treat water for consumption.
STP involves processes like screening, primary treatment, secondary treatment, and disinfection to treat sewage before releasing it back into the environment.
Both processes are essential for maintaining clean wat...
Top trending discussions
based on 2 reviews
Rating in categories
Senior Engineer
5.3k
salaries
| ₹5 L/yr - ₹17 L/yr |
Engineer
4.7k
salaries
| ₹1.5 L/yr - ₹8.5 L/yr |
Technical Lead
2k
salaries
| ₹8.5 L/yr - ₹30 L/yr |
Project Lead
1.6k
salaries
| ₹6 L/yr - ₹23 L/yr |
Senior Software Engineer
1.4k
salaries
| ₹4.8 L/yr - ₹18.2 L/yr |
TCS
Infosys
Wipro
Tech Mahindra