Upload Button Icon Add office photos

Filter interviews by

L&T Construction Manager Inspection Interview Questions and Answers

Updated 25 Dec 2021

L&T Construction Manager Inspection Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Testing of transformer , cable, conductor , DG, Insulator and related IEC standard .
  • Q2. How to make QAP and what content are required .
  • Ans. 

    A QAP should include procedures, standards, and guidelines for quality assurance in a project.

    • Identify the project's quality objectives

    • Define the quality standards and procedures

    • Establish the roles and responsibilities of the quality team

    • Determine the quality control and inspection processes

    • Outline the corrective action procedures

    • Include documentation requirements

    • Ensure compliance with relevant regulations and standard

  • Answered by AI
  • Q3. What type of document required for starting a substation project . Starting for initial to final stage .
  • Ans. 

    Various documents are required for starting a substation project, from initial to final stage.

    • Feasibility study report

    • Environmental impact assessment report

    • Design and engineering drawings

    • Equipment specifications and procurement documents

    • Construction and installation documents

    • Commissioning and testing documents

    • Operation and maintenance manuals

    • As-built drawings and records

  • Answered by AI
  • Q4. Prepare a check list to audit Transmission line project as per ISO 9000:2015.
  • Ans. 

    Checklist for auditing Transmission line project as per ISO 9000:2015

    • Verify if the project meets the requirements of ISO 9000:2015

    • Check if the project has a quality management system in place

    • Ensure that the project has documented procedures for all processes

    • Verify that the project has a system for monitoring and measuring performance

    • Check if the project has a system for corrective and preventive actions

    • Ensure that the ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident , polite and don’t try to bluff at any point . If answer was not sure than clearly tell interviewer .

L&T Construction Interview FAQs

What are the top questions asked in L&T Construction Manager Inspection interview?

Some of the top questions asked at the L&T Construction Manager Inspection interview -

  1. What type of document required for starting a substation project . Starting for...read more
  2. How to make QAP and what content are require...read more
  3. Prepare a check list to audit Transmission line project as per ISO 9000:20...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 404 Interviews
Dilip Buildcon Interview Questions
4.0
 • 139 Interviews
G R Infraprojects Interview Questions
4.1
 • 129 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
View all
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
665 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
525 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Civil Site Engineer
380 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
325 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview