A QAP should include procedures, standards, and guidelines for quality assurance in a project.
Identify the project's quality objectives
Define the quality standards and procedures
Establish the roles and responsibilities of the quality team
Determine the quality control and inspection processes
Outline the corrective action procedures
Include documentation requirements
Ensure compliance with relevant regulations and standard
Various documents are required for starting a substation project, from initial to final stage.
Feasibility study report
Environmental impact assessment report
Design and engineering drawings
Equipment specifications and procurement documents
Construction and installation documents
Commissioning and testing documents
Operation and maintenance manuals
As-built drawings and records
Checklist for auditing Transmission line project as per ISO 9000:2015
Verify if the project meets the requirements of ISO 9000:2015
Check if the project has a quality management system in place
Ensure that the project has documented procedures for all processes
Verify that the project has a system for monitoring and measuring performance
Check if the project has a system for corrective and preventive actions
Ensure that the ...
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹17.8 L/yr |
Senior Engineer
856
salaries
| ₹3 L/yr - ₹12.2 L/yr |
Assistant Construction Manager
529
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Civil Site Engineer
377
salaries
| ₹1.6 L/yr - ₹8.3 L/yr |
Assistant Engineering Manager
322
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA