Round 1 - One-on-one 

(6 Questions)

  • Q1. Basic questions in company
  • Q2. All types engine are working
  • Q3. How is maintenance repairing automobil engine
  • Ans. 

    Maintenance repairs automobile engines by diagnosing issues, replacing faulty parts, and conducting regular maintenance checks.

    • Diagnosing engine issues through visual inspection and diagnostic tools

    • Replacing faulty parts such as spark plugs, filters, and belts

    • Conducting regular maintenance checks to prevent future issues

    • Testing the engine after repairs to ensure proper functioning

  • Answered by AI
  • Q4. Which types of problem face in work
  • Q5. Resolved the problem face in company & workshop
  • Q6. Which types of working company and dealer
  • Ans. 

    Maintenance Supervisors typically work for manufacturing companies, property management companies, and equipment dealers.

    • Manufacturing companies

    • Property management companies

    • Equipment dealers

  • Answered by AI

Interview questions from similar companies

I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Mechanical supervisor
  • Q2. Mechanical supervisor maintenance

Interview Preparation Tips

Interview preparation tips for other job seekers - I have worked in dilipbuldcon Ltd for Maintenance all Breckdon mechanical

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Question about material reconciliation, allowable wastage question based on previous work experience
  • Q2. It's not easy to describe it in a few words because of the interview time is more

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare point base answer what u have done in ur present service and what u r going to offer them by considering a technical aspects

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience, and my scope of work?
  • Q2. Areas of strengths and areas need to develop

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview consisting of two rounds, first is about my personal details, which is intervied by Hr person. the second round is technical one, which was taken by Project director of the particular project. So i advice everyone be confident what you answering them, all the questions were asked about my experience part, and the knowledge what i have gained during the work apart from my education life. They also check all my documents. After completion of my interview and after 1 month, i got the offer letter of this company. Now iam so happy for this achievement. I hope all of the others who were attending for the interviews, hope you all get placed.

Thanks and Regards
Rahman

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About the background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have good job knowledge

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Maintenance Supervisor interview for experienced candidates?
L&T Construction interview process for experienced candidates usually has 1 rounds. The most common rounds in the L&T Construction interview process for experienced candidates are One-on-one Round.
What are the top questions asked in L&T Construction Maintenance Supervisor interview for experienced candidates?

Some of the top questions asked at the L&T Construction Maintenance Supervisor interview for experienced candidates -

  1. How is maintenance repairing automobil eng...read more
  2. Which types of working company and dea...read more
  3. Resolved the problem face in company & works...read more

Tell us how to improve this page.

L&T Construction Maintenance Supervisor Interview Process for Experienced

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 148 Interviews
G R Infraprojects Interview Questions
4.1
 • 137 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 66 Interviews
View all
L&T Construction Maintenance Supervisor Salary
based on 5 salaries
₹2 L/yr - ₹8.1 L/yr
14% more than the average Maintenance Supervisor Salary in India
View more details

L&T Construction Maintenance Supervisor Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
706 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
491 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview