Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Electrical Site Supervisor Interview Questions and Answers

Updated 3 Dec 2021

L&T Construction Electrical Site Supervisor Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. आप के पास फिल्ड लाईन मे कितने वर्षों का अनुभव है क्या आप फील्ड में 11,000 एलटी लाइन का काम किया है क्या आप मीटर लगवा पाएंगे कंजूमर से बात करने का तरीका क्या है इस प्रकार के प्रश्न पूछे गए थे
  • Ans. जवाब में हमने हां का उत्तर दिया और डेढ़ साल का अनुभव बताएं
  • Answered by dhananjay singh

Interview questions from similar companies

I appeared for an interview in Sep 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your salary expectations?

Interview Preparation Tips

Topics to prepare for Tata Projects Electrical Site Supervisor interview:
  • Electrical Machines
  • Transformers
Interview preparation tips for other job seekers - HR electrical related questions

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is MPLS and flow of labels in MPLS
  • Ans. 

    MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.

    • MPLS stands for Multiprotocol Label Switching

    • Labels are assigned to packets at the ingress router

    • Labels are used to identify the path a packet should take through the network

    • Labels are swapped at each MPLS router along the path

    • The last MPLS router removes the label and forwards the packet based on the IP ad...

  • Answered by AI
  • Q2. What is route reflector in BGP
  • Ans. 

    Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.

    • Route reflector reduces the number of iBGP peerings required in a network.

    • It helps in scaling the network by reducing the number of updates and processing required.

    • Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.

    • It is commonly used in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the role or profile for which you are applying. Brushup basics about all the topics for your role

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Based on experience and problem faced in project site
  • Q2. Previous site experience and the benifits
  • Q3. Roles and responsibilities of self and the factors affecting company growth

Interview Preparation Tips

Interview preparation tips for other job seekers - don't join in this black hole it is just like company there are no projects for this company the culture is so worst.

Tell us how to improve this page.

L&T Construction Electrical Site Supervisor Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 433 Interviews
Dilip Buildcon Interview Questions
4.0
 • 141 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
L&T Construction Electrical Site Supervisor Salary
based on 12 salaries
₹1 L/yr - ₹4.2 L/yr
21% less than the average Electrical Site Supervisor Salary in India
View more details

L&T Construction Electrical Site Supervisor Reviews and Ratings

based on 8 reviews

4.3/5

Rating in categories

4.2

Skill development

3.1

Work-life balance

3.6

Salary

3.3

Job security

4.0

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 8 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
705 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
494 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Civil Site Engineer
410 salaries
unlock blur

₹1.6 L/yr - ₹9.1 L/yr

Assistant Engineering Manager
324 salaries
unlock blur

₹5 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview