Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

L&T Construction DET Interview Questions and Answers

Updated 20 Sep 2020

L&T Construction DET Interview Experiences

1 interview found

DET Interview Questions & Answers

user image Anonymous

posted on 20 Sep 2020

I applied via Campus Placement and was interviewed before Sep 2019. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Self details,some technical questions
  • Q2. Past work experience
  • Ans. 

    I have 5 years of experience working in marketing and communications roles for various companies.

    • Managed social media accounts and created content for marketing campaigns

    • Developed and implemented communication strategies to increase brand awareness

    • Collaborated with cross-functional teams to execute marketing initiatives

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT, ANSWER STRAIGHT TO THE POINT, DON'T LIE(if u lie, u should be confident to answer them),if u Know the answer,say yes other wise say no.develop extra curricular activities,they will become plus for u.know about the company i.e history,there success etc.

Interview questions from similar companies

I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is MPLS and flow of labels in MPLS
  • Ans. 

    MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.

    • MPLS stands for Multiprotocol Label Switching

    • Labels are assigned to packets at the ingress router

    • Labels are used to identify the path a packet should take through the network

    • Labels are swapped at each MPLS router along the path

    • The last MPLS router removes the label and forwards the packet based on the IP ad...

  • Answered by AI
  • Q2. What is route reflector in BGP
  • Ans. 

    Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.

    • Route reflector reduces the number of iBGP peerings required in a network.

    • It helps in scaling the network by reducing the number of updates and processing required.

    • Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.

    • It is commonly used in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the role or profile for which you are applying. Brushup basics about all the topics for your role

Skills evaluated in this interview

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

INTERVIEWS

Bajaj Auto

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 432 Interviews
Dilip Buildcon Interview Questions
4.0
 • 141 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
L&T Construction DET Salary
based on 6 salaries
₹2 L/yr - ₹4.4 L/yr
58% more than the average DET Salary in India
View more details

L&T Construction DET Reviews and Ratings

based on 5 reviews

3.6/5

Rating in categories

3.1

Skill development

3.1

Work-life balance

4.1

Salary

4.5

Job security

3.1

Company culture

3.1

Promotions

3.1

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview