Filter interviews by
I applied via Walk-in and was interviewed before Oct 2023. There was 1 interview round.
Top trending discussions
posted on 18 Jul 2023
posted on 3 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
Project Details Work Assignment
posted on 19 Dec 2023
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.
The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.
The number of excavators required will depend on the size of the excavation area, the type o...
A lead is a potential customer or client who has shown interest in a product or service.
A lead is typically generated through marketing efforts such as advertising or networking.
Leads can be obtained through various channels such as social media, email campaigns, or trade shows.
Once a lead is identified, they are usually passed on to the sales team for further follow-up and conversion.
Qualifying leads involves determin...
The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.
The quantity done will depend on the output capacity of each machine
Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced
For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour
posted on 31 Jan 2022
I applied via Naukri.com and was interviewed in Sep 2021. There were 4 interview rounds.
Technical and Aptitude Questions
posted on 23 Apr 2022
I applied via Approached by Company and was interviewed before Apr 2021. There were 3 interview rounds.
The density of cement varies depending on the type of cement and its composition.
The density of ordinary Portland cement is around 3.15 g/cm³
The density of white cement is around 2.90 g/cm³
The density of low heat cement is around 3.0 g/cm³
The density of high alumina cement is around 3.0 g/cm³
The density of rapid hardening cement is around 3.15 g/cm³
posted on 3 Oct 2022
I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
Aptitude test and techinal test will conduct
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
Challenges faced in existing projects
Managing tight deadlines
Dealing with unexpected technical issues
Coordinating with cross-functional teams
Ensuring project scope doesn't exceed budget
Adapting to changing requirements
Maintaining quality standards
Ensuring timely delivery
I applied via Approached by Company and was interviewed in Mar 2021. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
703
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
504
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
393
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
323
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA