Chargehand Interview Questions & Answers

user image Srikanta Kumar Jena

posted on 13 Mar 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Properties of material
  • Ans. 

    Properties of material refer to its characteristics and behavior under different conditions.

    • Properties of material include physical, mechanical, thermal, electrical, and chemical properties.

    • Physical properties include density, color, and melting point.

    • Mechanical properties include strength, hardness, and elasticity.

    • Thermal properties include conductivity and expansion coefficient.

    • Electrical properties include conductiv...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Welding

Interview questions from similar companies

I applied via Jio career and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Preparation about telecom !
  • Q2. Telecom related questions, odc, foundation , concrete quality with w/c ratio

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare with your confidence !
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Exam will be conduct for aptitude test

Round 3 - Technical 

(3 Questions)

  • Q1. Any asked questions my Bulding mteriyal i will attemt given answer your questions
  • Q2. Bulding material any questions
  • Q3. Can u any questions my releted tred

Interview Preparation Tips

Topics to prepare for GMR Group Site Engineer interview:
  • Bulding meterial
Interview preparation tips for other job seekers - A standardized test is a test that is administered and scored in a consistent, or "standard", manner
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. They are asking about my work and previous work please and company including salary and benifits
Round 3 - Technical 

(2 Questions)

  • Q1. Asking about building structure work related questions and about my planing for smooth working on site,with coordination between contractor and company pmc or cleint
  • Q2. About quality quantity and site work

Interview Preparation Tips

Interview preparation tips for other job seekers - All prepared about your relevant sector interview with honesty

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is slump test Curing of method
  • Ans. 

    Slump test is a measure of the consistency of fresh concrete.

    • It is used to determine the workability of concrete.

    • The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.

    • The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.

    • Curing is the process of maintaining moisture in the concrete ...

  • Answered by AI
  • Q2. Cube test Direct Sher Test Plete lod test CBRTest

Interview Preparation Tips

Interview preparation tips for other job seekers - Manjil aur taqdeer khud hi bnani padti hai

I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 32 dia 1 meter weight how much?

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic questions and previous company project details must

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

Interview Questionnaire 

1 Question

  • Q1. Site related

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How many 1 gallon
  • Ans. 

    The question is incomplete and does not make sense.

    • The question is missing important information.

    • It is unclear what the question is asking for.

    • There is no context provided for the question.

    • Without more information, it is impossible to answer the question.

  • Answered by AI
  • Q2. M-5 to M-25 ratio
  • Ans. 

    The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.

    • The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.

    • The ratio indicates the compressive strength of the concrete after 28 days of curing.

    • For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.

    • T...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was very good, my interview was such that I would be

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Chargehand interview?
L&T Construction interview process usually has 1 rounds. The most common rounds in the L&T Construction interview process are Technical.

Tell us how to improve this page.

L&T Construction Chargehand Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 429 Interviews
Dilip Buildcon Interview Questions
4.0
 • 141 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
L&T Construction Chargehand Salary
based on 12 salaries
₹3.2 L/yr - ₹6.2 L/yr
7% less than the average Chargehand Salary in India
View more details

L&T Construction Chargehand Reviews and Ratings

based on 2 reviews

2.0/5

Rating in categories

4.0

Skill development

2.0

Work-life balance

2.0

Salary

4.0

Job security

2.0

Company culture

2.0

Promotions

3.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview