Filter interviews by
I applied via Recruitment Consultant and was interviewed in Nov 2018. There were 5 interview rounds.
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Apr 2020. There were 3 interview rounds.
Porosity is the measure of empty spaces in a material, often used in geology and engineering.
Porosity is the ratio of void spaces to total volume in a material.
It is expressed as a percentage.
Porosity is important in fields like geology for assessing rock formations and in engineering for determining the strength of materials.
Examples of porous materials include sponges, pumice stones, and aerogels.
Permeability is the property of a material that allows fluids or gases to pass through it.
Permeability is a measure of how easily a substance can pass through a material.
It is often used in geology to describe how easily fluids can flow through rocks or soil.
Permeability can be affected by factors such as pore size, connectivity, and fluid viscosity.
Materials like sandstone have high permeability, while materials like
I am passionate about helping others and believe this job will allow me to make a positive impact in the community.
I have a strong desire to contribute to the well-being of others
I am excited about the opportunity to work in a team-oriented environment
I am eager to learn and grow in my career
Oil shale is a rock containing kerogen that can be converted into shale oil through a process called retorting.
Oil shale is a sedimentary rock containing kerogen, a precursor to oil.
Shale oil is the liquid hydrocarbons extracted from oil shale through a process called retorting.
Oil shale deposits are found in various countries like the United States, Estonia, and China.
Shale oil production has increased in recent years
I applied via Company Website and was interviewed in Jan 2023. There were 5 interview rounds.
Pump start up refers to the process of starting and initializing a pump for operation.
Pump start up involves checking the pump for any issues or malfunctions before starting it.
It includes priming the pump to ensure proper water flow.
Monitoring the pump's performance during start up is crucial to prevent damage.
Following manufacturer's guidelines for pump start up is important for optimal operation.
posted on 28 Dec 2023
I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.
posted on 3 Apr 2024
I applied via Company Website and was interviewed in Oct 2022. There were 4 interview rounds.
Difference between AC source and DC source current
Applications of AC current and DC current
Applications of the omhs law and Eddy current
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
based on 18 reviews
Rating in categories
Field Operator
82
salaries
| ₹18 L/yr - ₹36 L/yr |
Operations Engineer
33
salaries
| ₹20.3 L/yr - ₹65 L/yr |
DCS Operator
32
salaries
| ₹24 L/yr - ₹42 L/yr |
Instrumentation Technician
23
salaries
| ₹3.8 L/yr - ₹13 L/yr |
Instrument Engineer
22
salaries
| ₹9 L/yr - ₹28.4 L/yr |
Reliance Industries
Shell
Oil And Natural Gas Corporation
Linde India