I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.
Induction motor operates on the principle of electromagnetic induction, while synchronous motor operates at a constant speed determined by the frequency of the power supply.
Induction motor does not require any external excitation to run, while synchronous motor requires a separate DC power source for excitation.
Induction motor has a slightly lower efficiency compared to synchronous motor.
Synchronous motor is used in ap...
Transformer parts include core, windings, and insulation. It is used to step up or step down voltage in electrical systems.
Transformer parts: core, windings, insulation
Core: provides magnetic path for flux
Windings: primary and secondary coils
Insulation: prevents short circuits
Used to step up or step down voltage in electrical systems
posted on 9 Oct 2023
I applied via Walk-in
To check IR of XLPE cable, use a megger to measure insulation resistance.
Use a megger to measure insulation resistance of XLPE cable
Ensure the cable is de-energized before testing
Compare the measured IR value with the manufacturer's specifications
Repeat the test at different points along the cable for accuracy
Tests for transformers include turns ratio test, insulation resistance test, power factor test, and winding resistance test.
Turns ratio test measures the turns ratio between primary and secondary windings.
Insulation resistance test checks the insulation resistance of the transformer windings.
Power factor test evaluates the power factor of the transformer.
Winding resistance test measures the resistance of the transforme
Types of excavations include trench excavation, basement excavation, road excavation, and pit excavation.
Trench excavation involves digging a narrow channel in the ground for laying pipes or cables.
Basement excavation is the process of digging out the foundation of a building to create a below-ground level.
Road excavation is the removal of soil and rocks to construct or repair roads.
Pit excavation involves digging a la...
I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
Srv kaya hai trv kaya hai
Fire faeting sistem keshi kam karta hai
Div ko auto me set karna
Moter repring karna
posted on 26 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
The power flow at my previous company involved analyzing and optimizing the distribution of electrical power throughout the system.
Studied power flow patterns to ensure efficient distribution of electricity
Utilized software like ETAP or PSS/E for power flow analysis
Implemented measures to reduce power losses and improve system reliability
Collaborated with other engineers to address power flow issues
Regularly monitored
Operation and maintenance procedures for transformer feeders and motor feeders involve regular inspections, testing, and preventive maintenance to ensure optimal performance and safety.
Regularly inspect transformer and motor feeders for signs of wear, damage, or overheating.
Perform routine testing to check for proper voltage levels, insulation resistance, and overall functionality.
Conduct preventive maintenance such as...
A contactor is an electrical device used to switch an electrical circuit on or off, while BMR stands for Basic Maintenance Ratio in electrical engineering.
Contactor is used to control electric motors, lighting, heating, and other electrical loads
BMR is a ratio used to determine the maintenance cost of a system relative to its initial cost
Contactor typically consists of a coil, contacts, and an enclosure
BMR is calculate...
Low forward power in a generator refers to the situation where the power output of the generator is lower than expected or required.
Low forward power can be caused by issues such as mechanical problems, fuel supply issues, or electrical faults.
It can result in reduced efficiency, poor performance, and potential damage to the generator.
Regular maintenance and monitoring can help prevent and address low forward power iss...
To sync your power plant with the grid, you need to match the frequency and phase of the plant with the grid.
Ensure the frequency of the power plant matches the grid frequency (usually 50 or 60 Hz)
Synchronize the phase angle of the power plant with the grid
Use synchronization equipment such as synchronizing relays and synchroscopes
Gradually increase the power output of the plant to match the grid demand
Monitor the sync
I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.
posted on 20 Jul 2024
posted on 29 Nov 2024
I design, develop, and test electrical systems and equipment.
Designing electrical systems for buildings or products
Developing prototypes and testing them for functionality
Collaborating with other engineers and technicians
Troubleshooting and resolving electrical issues
Staying updated on industry trends and advancements
posted on 31 Jan 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Field Operator
72
salaries
| ₹15 L/yr - ₹36 L/yr |
Operations Engineer
36
salaries
| ₹20.6 L/yr - ₹65 L/yr |
DCS Operator
32
salaries
| ₹24 L/yr - ₹42 L/yr |
Instrumentation Technician
23
salaries
| ₹3.8 L/yr - ₹13 L/yr |
Operator
22
salaries
| ₹24 L/yr - ₹31.5 L/yr |
Indian Oil Corporation
Reliance Industries
Bharat Petroleum
Hindustan Petroleum