Filter interviews by
I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.
Top trending discussions
posted on 4 May 2019
I applied via Approached by Company and was interviewed in Oct 2018. There were 5 interview rounds.
I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.
posted on 29 Nov 2021
posted on 5 Mar 2025
I appeared for an interview in Feb 2025.
Erection and testing of transformers involves careful installation, connection, and verification of performance parameters.
1. Site Preparation: Ensure the foundation is level and capable of supporting the transformer weight.
2. Unloading: Use cranes or forklifts to safely unload the transformer from transport vehicles.
3. Positioning: Align the transformer with the designated installation area, ensuring proper clearance ...
Erecting a power panel involves careful planning, installation, and safety measures to ensure proper functionality and compliance.
1. Site Preparation: Ensure the installation site is clean, level, and free from obstructions.
2. Equipment Check: Verify that all components of the power panel are present and undamaged.
3. Mounting: Securely mount the panel to a wall or a dedicated structure using appropriate fasteners.
4. El...
Cable laying involves planning, installation, and securing cables for electrical systems, ensuring safety and efficiency.
Plan the route: Assess the area for obstacles and determine the most efficient path for the cables.
Select appropriate cables: Choose cables based on voltage, current capacity, and environmental conditions.
Use proper tools: Employ tools like cable pullers, trenchers, and splicing kits for effective in...
Generator rotor tests ensure the rotor's integrity and performance, crucial for reliable generator operation.
Visual Inspection: Check for physical damage, cracks, or corrosion on the rotor surface.
Insulation Resistance Test: Measure insulation resistance between rotor windings and ground using a megohmmeter.
Winding Resistance Test: Use a micro-ohmmeter to measure the resistance of rotor windings to ensure they are with...
Testing and commissioning of HT & LT panels ensure safety, reliability, and performance of electrical systems.
Visual Inspection: Check for physical damage, proper labeling, and cleanliness of the panel.
Insulation Resistance Testing: Use a megohmmeter to measure insulation resistance to ensure safety.
Functional Testing: Verify the operation of circuit breakers, relays, and other protective devices.
Voltage and Curren...
posted on 19 Oct 2021
I applied via Campus Placement and was interviewed in Oct 2021. There was 1 interview round.
Ohm's law states that the current through a conductor between two points is directly proportional to the voltage across the two points.
Ohm's law is represented by the equation I = V/R, where I is the current, V is the voltage, and R is the resistance.
It is used to calculate the current flowing through a circuit given the voltage and resistance.
It can also be used to calculate the resistance of a circuit given the volta...
A relay is an electrically operated switch that uses an electromagnet to mechanically control the opening and closing of contacts.
Relays are commonly used in electrical systems to control high-power devices with low-power signals.
They can be used to control motors, lights, solenoids, and other electrical components.
Relays have an input coil that generates a magnetic field when current flows through it, causing the cont...
posted on 17 Dec 2021
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
posted on 31 Jan 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
posted on 30 May 2023
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
Some of the top questions asked at the Kuwait National Petroleum Company Electrical Maintenance Technician interview -
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Field Operator
82
salaries
| ₹18 L/yr - ₹36 L/yr |
DCS Operator
32
salaries
| ₹24 L/yr - ₹42 L/yr |
Operations Engineer
32
salaries
| ₹15.7 L/yr - ₹65 L/yr |
Instrumentation Technician
23
salaries
| ₹3.8 L/yr - ₹13 L/yr |
Instrument Engineer
22
salaries
| ₹9 L/yr - ₹28.4 L/yr |
Reliance Industries
Shell
Oil And Natural Gas Corporation
Linde India