i
KPIT Technologies
Filter interviews by
I applied via Referral and was interviewed before Jul 2022. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2022. There was 1 interview round.
I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.
Questions asked related to Logical Reasoning, Verbal and Non-Verbal
KPIT Technologies interview questions for popular designations
I applied via Naukri.com and was interviewed before Apr 2022. There were 4 interview rounds.
Time quanta refers to the smallest unit of time that a computer's operating system can allocate to a process.
It is also known as a time slice or a quantum.
It is used in multitasking operating systems to allocate CPU time to different processes.
The length of a time quanta can vary depending on the operating system and its settings.
If a process does not complete its task within its allocated time quanta, it is preempted ...
Linux booting process involves several stages including BIOS, bootloader, kernel initialization, and user space initialization.
The process starts with the BIOS (Basic Input/Output System) which initializes hardware components.
The bootloader (GRUB or LILO) is then loaded which loads the kernel into memory.
The kernel initializes drivers, mounts the root file system, and starts the init process.
The init process then start...
Get interview-ready with Top KPIT Technologies Interview Questions
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
Project management stages include initiation, planning, execution, monitoring and control, and closure.
Initiation: defining the project scope, objectives, and stakeholders
Planning: creating a detailed project plan, including timelines, budget, and resources
Execution: carrying out the plan and completing the project deliverables
Monitoring and control: tracking progress, identifying and addressing issues, and making nece...
Fast-tracking is a project management technique to accelerate the project schedule by overlapping activities.
Fast-tracking involves identifying critical path activities that can be overlapped to reduce the project duration.
It requires careful planning and coordination to ensure that the quality of work is not compromised.
Examples of fast-tracking include overlapping design and construction phases in a building project ...
I was interviewed before Jul 2022.
GST process in STO scenarios involves movement of goods between two different states with tax implications.
In STO scenarios, goods are transferred from one branch to another within the same company but in different states.
GST is applicable on the supply of goods in STO scenarios, with tax implications based on the state of supply and recipient.
The supplying branch issues a tax invoice to the receiving branch for the go...
Requirements in MRP are generated based on the demand for finished goods, lead times, inventory levels, and production capacity.
MRP calculates requirements by exploding the bill of materials for each finished product
It considers demand forecasts, customer orders, and safety stock levels
Lead times for procurement and production are factored in to determine when materials are needed
Inventory levels are monitored to ensur...
Interview experience
based on 2.6k reviews
Rating in categories
Senior Software Engineer
2.4k
salaries
| ₹6 L/yr - ₹20 L/yr |
Software Engineer
2.3k
salaries
| ₹2 L/yr - ₹11.4 L/yr |
Technical Lead
1.9k
salaries
| ₹8.4 L/yr - ₹25.3 L/yr |
Senior Technical Lead
774
salaries
| ₹10.3 L/yr - ₹36 L/yr |
Software Developer
600
salaries
| ₹2.9 L/yr - ₹11 L/yr |
TCS
Infosys
Wipro
HCLTech