Turbine and Boiler light up procedure
Check all valves and switches are in the correct position
Check fuel and water levels
Start the boiler and wait for steam pressure to build up
Open the turbine inlet valve and gradually increase load
Monitor all parameters and adjust as necessary
KEPCO Plant Service & Engineering interview questions for popular designations
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There was 1 interview round.
BTG protection refers to the safety measures taken for Boiler, Turbine, Generator, and Switchyard.
BTG protection is crucial for ensuring the safe and efficient operation of power plants.
It involves various safety measures such as fire protection, overpressure protection, and electrical protection.
Examples of BTG protection systems include fire suppression systems, pressure relief valves, and protective relays.
Regular m...
Top trending discussions
Some of the top questions asked at the KEPCO Plant Service & Engineering interview for experienced candidates -
based on 6 interviews
Interview experience
based on 276 reviews
Rating in categories
Assistant Engineer
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
90
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
72
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
35
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Energy Hydrocarbon
Tata Projects
TechnipFMC
Toyo Engineering