A wave trap is a device used in electrical engineering to prevent unwanted signals or frequencies from entering a system.
Wave traps are typically used in power systems to filter out specific frequencies that can cause interference.
They are designed to allow only desired signals to pass through while blocking unwanted signals.
Wave traps can be used in substations, transmission lines, and other electrical systems to impr...
Types of circuit breakers used in substations include air circuit breakers, oil circuit breakers, vacuum circuit breakers, and SF6 circuit breakers.
Air circuit breakers are commonly used in low voltage applications.
Oil circuit breakers are used in high voltage applications.
Vacuum circuit breakers are compact and reliable, suitable for medium voltage applications.
SF6 circuit breakers are used in high voltage substations
Global warming ,covid-19, current affairs
posted on 27 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
System studies involve analyzing and evaluating the performance of electrical systems to ensure efficiency and reliability.
System studies involve analyzing the behavior of electrical systems under different operating conditions.
They help identify potential issues and optimize the performance of the system.
Examples of system studies include load flow analysis, short circuit analysis, and protection coordination studies.
Load flow study is a method used in electrical engineering to analyze and calculate the flow of power in an electrical network.
Load flow study helps in determining the steady-state operating conditions of a power system.
It involves calculating the voltage magnitude and phase angle at each bus in the network.
The study considers factors like power generation, transmission line losses, and load demand.
It helps in identify...
I appeared for an interview before Mar 2024, where I was asked the following questions.
The cable laying process involves planning, trenching, installation, and testing for effective electrical distribution.
Planning: Assess the route and determine cable type based on load requirements.
Trenching: Excavate the ground to lay cables, ensuring proper depth and width.
Installation: Place cables in trenches, using protective conduits if necessary.
Backfilling: Cover the cables with soil, ensuring no sharp objects ...
I applied via Naukri.com and was interviewed in Feb 2024. There were 3 interview rounds.
Face interview when it will be there??
I applied via LinkedIn and was interviewed in Mar 2021. There was 1 interview round.
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Assistant Engineer
94
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Senior Engineer
90
salaries
| ₹4.5 L/yr - ₹9.6 L/yr |
Assistant Manager
72
salaries
| ₹6 L/yr - ₹11.5 L/yr |
Engineer
72
salaries
| ₹2.7 L/yr - ₹7.5 L/yr |
Deputy Manager
35
salaries
| ₹8.5 L/yr - ₹15 L/yr |
Nasser S. Al Hajri Corporation
Saudi Binladin Group
Bahwan Engineering
Tractebel