I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
posted on 26 May 2022
Experienced project engineer seeking new challenges and opportunities for growth.
Looking for a change to expand my skill set and take on more complex projects
Seeking a company that values innovation and encourages professional development
Interested in joining a team that fosters collaboration and promotes a positive work culture
I expect your company to be a leader in the industry, with a strong focus on innovation and a collaborative work environment.
I expect the company to have a clear vision and mission, and to communicate them effectively to employees.
I expect the company to provide opportunities for professional growth and development.
I expect the company to have a strong commitment to quality and customer satisfaction.
I expect the compan...
I have worked with two previous companies in the role of Senior Project Engineer.
Company A: Worked on the design and implementation of a large-scale infrastructure project. Managed a team of engineers and ensured project completion within budget and timeline.
Company B: Led the development of a new product line, overseeing the entire project lifecycle from concept to production. Collaborated with cross-functional teams
Piling work involves driving piles into the ground to provide support for structures. There are several types of piling.
Piling work is done to provide a stable foundation for structures such as buildings, bridges, and retaining walls.
Piles can be made of various materials including concrete, steel, and timber.
The most common types of piling are driven piles, drilled piles, and screw piles.
Driven piles are hammered into...
posted on 17 Nov 2021
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
Common defects in MS pipes include corrosion, cracks, leaks, and misalignment.
Corrosion: Occurs due to exposure to moisture and chemicals, leading to rust and weakening of the pipe.
Cracks: Can be caused by stress, improper handling, or manufacturing defects, compromising the structural integrity.
Leaks: Result from faulty joints, damaged seals, or pipe degradation, causing fluid or gas to escape.
Misalignment: Improper i...
SCADA stands for Supervisory Control and Data Acquisition. It is a system used to monitor and control industrial processes.
SCADA systems collect data from sensors and other devices in real-time
The data is then processed and displayed on a human-machine interface (HMI)
Operators can use the HMI to monitor and control the process remotely
SCADA systems are commonly used in industries such as oil and gas, water treatment, a...
The density of CI pipes varies based on the size and thickness of the pipe.
CI pipes have a density range of 6.9-7.8 g/cm³
The density of CI pipes can be calculated using the formula: Density = Mass/Volume
The density of CI pipes is affected by factors such as temperature and pressure
The density of CI pipes is important for determining their strength and durability
The minimum thickness of OHT Raft depends on various factors such as load capacity, soil type, and seismic activity.
The thickness of OHT Raft should be calculated based on the load capacity of the structure.
The soil type and seismic activity of the area should also be considered while determining the minimum thickness.
The minimum thickness of OHT Raft can vary from project to project depending on the above factors.
Cons...
MS pipes are made of mild steel while DI pipes are made of ductile iron.
MS pipes are cheaper than DI pipes.
DI pipes are more durable and have higher tensile strength than MS pipes.
DI pipes are used for water supply and sewage systems while MS pipes are used for gas and oil pipelines.
DI pipes have a smoother inner surface which reduces friction and improves flow rate.
MS pipes are prone to corrosion and require regular m...
I applied via Referral and was interviewed in Jul 2021. There were 4 interview rounds.
Project activities refer to the tasks and actions required to complete a project.
Identifying project goals and objectives
Creating a project plan and timeline
Assigning tasks to team members
Monitoring progress and making adjustments as needed
Communicating with stakeholders
Completing project deliverables
Conducting project evaluations and reviews
The type of agitator depends on the process requirements and the properties of the materials being mixed.
The most common types of agitators are paddle, turbine, anchor, and propeller.
Paddle agitators are used for low viscosity fluids, while turbine agitators are used for high viscosity fluids.
Anchor agitators are used for heavy and viscous materials, while propeller agitators are used for mixing gases into liquids.
The ...
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 14 Apr 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
Various types of steel are used in construction, including carbon steel, stainless steel, and high-strength low-alloy steel.
Carbon steel is commonly used in construction due to its strength and affordability.
Stainless steel is used in areas where corrosion resistance is required, such as in coastal regions or chemical plants.
High-strength low-alloy steel (HSLA) is used in structures that require higher strength and red...
550D is a newer version of 550 with improved features and capabilities.
550D has a higher resolution sensor than 550
550D has a faster continuous shooting speed than 550
550D has a higher maximum ISO than 550
550D has a better LCD screen than 550
The PH stages in project management refer to the initiation, planning, execution, monitoring, and closure phases.
Initiation: Defining the project's objectives, scope, and stakeholders.
Planning: Developing a detailed project plan, including timelines, resources, and budgets.
Execution: Implementing the project plan and managing resources.
Monitoring: Tracking project progress, identifying risks, and making necessary adjus...
The quantity of concrete and steel per cubic meter varies depending on the design and specifications of the project.
The amount of concrete and steel per cubic meter is determined by the structural design and specifications of the project.
The mix design of concrete and grade of steel used also affect the quantity per cubic meter.
For example, a project may require 0.4 cubic meters of concrete and 100 kg of steel per cubi...
I applied via Approached by Company and was interviewed before Jan 2023. There were 2 interview rounds.
Interview experience
based on 1 review
Rating in categories
Assistant Manager
241
salaries
| ₹6.8 L/yr - ₹22 L/yr |
Territory Sales Manager
148
salaries
| ₹7.4 L/yr - ₹24 L/yr |
Senior Executive
100
salaries
| ₹4.6 L/yr - ₹12.5 L/yr |
Deputy Manager
99
salaries
| ₹11.5 L/yr - ₹31.5 L/yr |
Design Engineer
86
salaries
| ₹3 L/yr - ₹9 L/yr |
Hindware Limited
Jaquar
Cera Sanitaryware
Roca India