I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
I was interviewed in Jan 2025.
I am currently working at a construction company specializing in infrastructure projects.
Specializing in infrastructure projects
Working at a construction company
Dealing with civil engineering tasks
I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.
Managed site development projects from concept to completion
Designed infrastructure systems such as water supply and drainage
Performed construction management duties to ensure projects stayed on schedule and within budget
Worked on projects ranging from residential de...
Handling a site in the transmission sector involves coordinating with various stakeholders, ensuring compliance with regulations, and overseeing the construction process.
Coordinate with utility companies to ensure proper installation of transmission lines
Ensure compliance with safety regulations and environmental standards
Oversee the construction process to ensure quality and timely completion
Manage and resolve any iss...
Key considerations for foundation in transmission line construction
Soil type and bearing capacity must be assessed
Proper foundation design to support the weight and wind loads of the transmission line towers
Consideration of environmental factors such as seismic activity and flooding
Accessibility for construction equipment and maintenance
Proper drainage to prevent erosion and foundation instability
The best method for erection in transmission is using cranes and specialized equipment.
Use cranes for lifting and placing heavy transmission components
Ensure proper planning and coordination to avoid delays
Utilize specialized equipment for precise positioning
Follow safety protocols to prevent accidents
Consider environmental factors such as wind and terrain
I adapt to challenging situations by staying calm, analyzing the problem, seeking advice from colleagues, and coming up with creative solutions.
Stay calm and composed under pressure
Analyze the problem thoroughly before taking action
Seek advice and input from colleagues or experts
Think creatively to come up with innovative solutions
The diagonal in the transmission sector plays a crucial role in providing structural stability and support to the transmission towers.
The diagonal members in transmission towers help to distribute the load and provide stability against wind and seismic forces.
They prevent the tower from buckling or collapsing under various loads.
Diagonals also help in reducing the overall weight of the tower by transferring some of the...
posted on 6 Sep 2024
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Rate analysis involves calculating the cost of different items in a project.
Rate analysis involves breaking down the cost of each item in a project
It helps in determining the cost of materials, labor, and equipment for each item
Rate analysis is essential for accurate budgeting and cost estimation in construction projects
Escalation is the process of increasing the level of urgency or severity of a situation.
Escalation is commonly used in project management to address issues that require immediate attention.
It involves raising a concern to higher levels of authority when it cannot be resolved at the current level.
Escalation can also refer to increasing the intensity of a conflict or dispute.
Examples include escalating a customer complai...
Types of indices include price index, quantity index, and composite index.
Price index measures changes in prices over time.
Quantity index measures changes in quantities of goods or services.
Composite index combines price and quantity indices to provide a comprehensive measure.
Examples: Consumer Price Index (CPI), Producer Price Index (PPI), and Dow Jones Industrial Average.
Wastage can be controlled by proper planning, monitoring, training, and implementing efficient processes.
Implementing proper inventory management to avoid overstocking and expiration of materials
Regular monitoring of material usage and identifying areas of high wastage
Training staff on proper handling and storage of materials to prevent damage and spoilage
Implementing lean construction practices to minimize material wa...
Designing beams and columns involves determining the size, material, and layout to support the required loads.
Consider the type of structure and the loads it will bear
Calculate the required dimensions and reinforcement based on structural analysis
Select appropriate materials such as steel or concrete
Ensure proper connections and detailing for stability and safety
Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.
Limit state of serviceability ensures that a structure remains usable and safe for occupants.
It involves checking factors like deflection, vibration, cracking, and durability.
For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...
I was interviewed in Dec 2024.
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
posted on 18 Oct 2024
I applied via Recruitment Consulltant
Quality control in civil engineering involves implementing processes to ensure that construction projects meet specified standards and requirements.
Establishing quality control procedures and protocols
Regular inspections and testing of materials and workmanship
Training and educating staff on quality standards
Implementing corrective actions when deviations are identified
Utilizing quality control tools such as checklists
BBS in code refers to Bar Bending Schedule as per Indian standards.
BBS stands for Bar Bending Schedule.
It is a detailed list of reinforcement bars to be used in a construction project.
It includes information on bar sizes, shapes, quantities, and placement.
BBS is prepared as per the requirements of Indian standards like IS 2502:1963.
It helps in ensuring proper reinforcement placement and quantity in the structure.
Experienced Planning Engineer with a background in civil engineering and a proven track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
In 5 years, I see myself as a senior Planning Engineer leading a team on major projects and contributing to the growth of the company.
Leading a team of planning engineers on major projects
Contributing to the growth and success of the company
Continuing to enhance my skills and knowledge in planning and project management
Possibly pursuing further certifications or advanced degrees in the field
based on 12 reviews
Rating in categories
Assistant Engineer
202
salaries
| ₹1.2 L/yr - ₹5.8 L/yr |
Engineer
72
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Assistant Engineer - Civil
63
salaries
| ₹1.9 L/yr - ₹5.5 L/yr |
Senior Engineer
53
salaries
| ₹4.8 L/yr - ₹9.6 L/yr |
Civil Site Engineer
47
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company