Filter interviews by
Be the first one to contribute and help others!
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
posted on 17 Oct 2024
Good process from management side
posted on 10 Oct 2024
posted on 30 Apr 2021
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
Precast structures are pre-made concrete elements used in construction.
Precast segments are manufactured off-site and transported to the construction site for assembly.
They are commonly used in bridge construction, tunnels, and other large-scale infrastructure projects.
Precast segments can be designed to fit specific project requirements, reducing construction time and costs.
They offer high durability and strength, and...
Segment casting can be done using various methods depending on the material and application.
One method is sand casting, where a mold is created using sand and the molten metal is poured into it.
Another method is investment casting, where a wax pattern is created and coated with ceramic before the metal is poured.
Die casting is a method where molten metal is forced into a mold under high pressure.
Continuous casting is u...
Grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of concrete in megapascals (MPa).
Common grades of concrete include M10, M20, M30, etc.
Higher grade concrete has higher strength and durability.
For example, M20 grade concrete has a compressive strength of 20 MPa.
Design mix of concrete refers to the proportion of materials used in making concrete.
Design mix is determined based on the strength and durability requirements of the concrete.
The mix includes cement, water, aggregates (sand, gravel, crushed stone), and sometimes admixtures.
The proportions of each material are specified in terms of weight or volume.
For example, a common mix for general use is 1:2:3 (cement:sand:gravel)...
Segment casting is a method of casting concrete segments for tunnel lining.
Segments are cast in a factory and transported to the tunnel site.
Segments are then assembled to form a complete tunnel lining.
This method is commonly used in tunnel construction projects.
It allows for faster construction and better quality control.
Examples include the Channel Tunnel and the SMART Tunnel in Malaysia.
posted on 11 Dec 2023
I applied via Referral
posted on 29 Oct 2024
Technical questions and aptitude questions
About the railways facility
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
based on 26 reviews
Rating in categories
Assistant Manager
7
salaries
| ₹3.1 L/yr - ₹7.1 L/yr |
Accountant
5
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Project Manager
4
salaries
| ₹18 L/yr - ₹22 L/yr |
Project Manager Civil
4
salaries
| ₹1.8 L/yr - ₹1.8 L/yr |
Civil Engineer
4
salaries
| ₹4.8 L/yr - ₹4.8 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
Ramky Infrastructure