Filter interviews by
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Shop floor can be managed effectively by implementing efficient production processes, ensuring proper communication, maintaining a clean and organized workspace, and prioritizing safety.
Implement efficient production processes to optimize workflow and minimize downtime.
Ensure proper communication among team members to avoid misunderstandings and delays.
Maintain a clean and organized workspace to improve efficiency and ...
Geometrical tolerance refers to the allowable variation in dimensions and form of a part, while theoretical tolerance is the ideal or perfect value for a dimension.
Geometrical tolerance allows for deviations in dimensions and form to ensure proper fit and function of parts.
Theoretical tolerance represents the ideal or perfect value for a dimension, with no allowance for variation.
Geometrical tolerance is specified usin...
Ovality in production engineering can be caused by factors such as improper tooling, material inconsistencies, and machine misalignment.
Improper tooling can lead to uneven pressure on the material, causing it to deform into an oval shape.
Material inconsistencies, such as variations in thickness or hardness, can result in non-uniform stretching during the production process.
Machine misalignment, where the equipment is n...
MSA stands for Measurement System Analysis. It is used to assess the capability of a measurement system to provide accurate and reliable results.
MSA helps in identifying sources of variation in measurement systems.
It ensures that the measurement system is capable of producing accurate and reliable results.
MSA includes studies like Gage R&R (Repeatability and Reproducibility) to assess measurement system variation.
I...
Control plan specifies how to control a process, while Quality plan outlines the overall quality objectives and strategies.
Control plan focuses on process control methods and parameters
Quality plan outlines quality objectives, standards, and strategies
Control plan is more detailed and specific to the production process
Quality plan is more general and covers overall quality management
Both plans are essential for ensurin
Rejection can be controlled by implementing robust quality control measures and continuous improvement processes.
Implementing thorough quality control checks at every stage of production
Regularly reviewing and analyzing rejection data to identify root causes
Training employees on quality standards and best practices
Implementing corrective and preventive actions based on rejection trends
Collaborating with suppliers to im
I applied via Walk-in and was interviewed in Jun 2023. There were 5 interview rounds.
Kems Auto Components interview questions for popular designations
I applied via Company Website and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
Yes, I am fit for the post of Quality Engineer.
I have a strong background in quality engineering with experience in implementing quality control processes.
I am skilled in conducting quality audits and inspections to identify areas for improvement.
I have expertise in using quality tools and methodologies such as Six Sigma and Lean principles.
I have successfully led cross-functional teams to resolve quality issues and im...
I am a detail-oriented Quality Engineer with a strong background in ensuring product quality and process improvement.
Experienced in conducting quality audits and inspections
Proficient in using statistical analysis tools to identify and resolve quality issues
Skilled in developing and implementing quality control procedures
Strong problem-solving and analytical skills
Excellent communication and teamwork abilities
I tend to procrastinate and sometimes struggle with time management.
Procrastination
Time management
Difficulty prioritizing tasks
Occasional lack of focus
posted on 9 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
Seven QC tools are a set of basic quality control tools used to identify and solve quality problems.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Stratification
Cause-and-effect diagrams
posted on 26 May 2020
I applied via Walk-in and was interviewed in Apr 2020. There were 3 interview rounds.
The 7 QC tools are a set of basic quality control tools used to identify and solve quality problems.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Stratification
Cause-and-effect diagrams
As a Quality Engineer in my previous company, I was responsible for ensuring product quality, conducting audits, and implementing quality control processes.
Conducted product quality inspections and audits
Implemented quality control processes to improve product quality
Analyzed data to identify areas for improvement
Collaborated with cross-functional teams to address quality issues
Ensured compliance with industry standard
QA focuses on preventing defects while QC focuses on identifying and fixing defects.
QA is a proactive process that involves planning, designing, and executing tests to prevent defects from occurring.
QC is a reactive process that involves identifying defects through testing and then fixing them.
QA is focused on the entire software development life cycle while QC is focused on the testing phase.
Examples of QA activities ...
I applied via Naukri.com and was interviewed before Oct 2021. There were 2 interview rounds.
based on 6 interviews
Interview experience
based on 57 reviews
Rating in categories
Quality Engineer
31
salaries
| ₹2 L/yr - ₹4.5 L/yr |
CNC Machine Operator
9
salaries
| ₹2.1 L/yr - ₹3.2 L/yr |
Engineer
7
salaries
| ₹3 L/yr - ₹4.3 L/yr |
Senior Quality Engineer
7
salaries
| ₹3 L/yr - ₹9 L/yr |
Executive Accountant
7
salaries
| ₹1.9 L/yr - ₹4 L/yr |
Bharat Forge
Samvardhana Motherson Group
Bosch
Sundaram Clayton