Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International OHE Engineer Interview Questions and Answers

Updated 23 Sep 2024

KEC International OHE Engineer Interview Experiences

2 interviews found

OHE Engineer Interview Questions & Answers

user image Anonymous

posted on 1 Apr 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Railway electrification related
  • Q2. OHE railway electrification related
  • Q3. All new and motification
  • Q4. Mast erection, bracket erection, wiring, adjustment,acd checking,tw checking,atd adjustment,si erection adjustment
  • Q5. Block,and non block work
  • Q6. Earth bonding work
  • Q7. DPR submitted with verification
  • Q8. Good coordination with the client
  • Q9. Thanks you so much

Interview Preparation Tips

Interview preparation tips for other job seekers - Smart working and hard working

OHE Engineer Interview Questions & Answers

user image Anonymous

posted on 23 Sep 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. OHE Realated all Question
  • Q2. Planning Related all Question

OHE Engineer Interview Questions Asked at Other Companies

asked in BARSYL
Q1. what is ohe

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What about last company working
  • Q2. How much experience you have in IT.
Round 2 - HR 

(2 Questions)

  • Q1. Why you are looking for job in IRB
  • Q2. How much salary do you want in IRB.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Beam lapping zone ,How many Beam zone
  • Q2. What is over lap , What is confined zone VDF Flooring casting process

Interview Preparation Tips

Interview preparation tips for other job seekers - I thik we should prepare before the interview. We should have Konw about technical and site knowledge.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Electrical engineers
  • Q2. Electrical digine eng
  • Q3. Why joined your company
  • Ans. 

    I joined the company because of its innovative projects and collaborative work environment.

    • Opportunity to work on cutting-edge projects

    • Collaborative work environment

    • Company's reputation in the industry

    • Career growth opportunities

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good excuse
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Face to face interview 

(2 Questions)

  • Q1. What do know about Concrete? And How did you used the concrete.
  • Ans. 

    Concrete is a versatile building material made of cement, water, and aggregates. It is used in construction for various structures.

    • Concrete is a composite material composed of cement, water, and aggregates like sand or gravel.

    • It is known for its strength, durability, and versatility in construction projects.

    • Concrete can be used for building foundations, roads, bridges, dams, and other structures.

    • It can also be used for...

  • Answered by AI
  • Q2. What is the steel and concrete in used of construction related work or construction sites.
  • Ans. 

    Steel and concrete are commonly used materials in construction for their strength and durability.

    • Steel is used in construction for structural support, such as beams, columns, and reinforcement in concrete.

    • Concrete is used for foundations, walls, floors, and other structural elements.

    • Steel and concrete are often used together in buildings and infrastructure projects to create strong and durable structures.

    • Examples inclu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You have to complete all your documents for the job and give proper information about related construction.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Sep 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Contact to you for opportunity
Round 3 - Technical 

(4 Questions)

  • Q1. Material testing 1.Soil 2.Bitumen 3.Cement 4.Aggregate
  • Q2. Design Mix & Job Mix formula Concrete, DLC, PQC, GSB, WMM, DBM, BC
  • Q3. Others material in Finishing PEB Material
  • Ans. 

    PEB material refers to pre-engineered building materials used in finishing construction projects.

    • PEB materials are commonly used in construction projects for their durability and cost-effectiveness.

    • Examples of PEB materials include steel beams, roofing sheets, wall panels, and insulation materials.

    • Quality control is essential in ensuring that PEB materials meet industry standards and specifications.

    • Inspecting PEB mater...

  • Answered by AI
  • Q4. Rockwool, Welding, Tile, Brick work and Painting work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the HDPE and Di pipe is code ??
  • Ans. 

    HDPE and Di pipe IS codes are standards set by the Bureau of Indian Standards for high-density polyethylene and ductile iron pipes.

    • IS 4984: High-density polyethylene (HDPE) pipes for potable water supplies

    • IS 8329: Ductile iron (DI) pipes and fittings for pressure pipelines

  • Answered by AI
  • Q2. Types of Aerator.
  • Ans. 

    Aerators are devices used to add air into water or other liquids to increase oxygen levels.

    • Surface aerators

    • Submersible aerators

    • Diffused aerators

    • Mechanical aerators

    • Aspirating aerators

  • Answered by AI
  • Q3. 3 Types of Aerator - 1) cascade 2) Tray tower 3) spray nozal

Interview Preparation Tips

Topics to prepare for Welspun Enterprises Senior Engineer interview:
  • Environmental Engineering
  • Building Construction
  • Water Treatment Plant
Interview preparation tips for other job seekers - Be confident and
Interview experience
4
Good
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Mechanical maintenance relatives
  • Q2. Types of PM and type of valves
  • Ans. 

    There are various types of PM (Programmable Logic Controllers) and valves used in engineering.

    • Types of PM include PLC (Programmable Logic Controller), DCS (Distributed Control System), and SCADA (Supervisory Control and Data Acquisition).

    • Types of valves include gate valves, globe valves, ball valves, butterfly valves, and check valves.

    • Each type of PM and valve has its own specific applications and advantages.

    • For exampl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions related to your field
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Mechanical engineering production
  • Q2. Oil and gas fertilizer devision
  • Ans. 

    Oil and gas fertilizer division involves the production and distribution of fertilizers derived from oil and gas byproducts.

    • Fertilizers are produced using byproducts from the oil and gas industry, such as natural gas liquids or sulfur.

    • The fertilizers produced can include nitrogen-based fertilizers like ammonia or urea, as well as sulfur-based fertilizers like ammonium sulfate.

    • The division may involve processes such as ...

  • Answered by AI
  • Q3. Respected sir/ma'am, I Suresh attaching my brief resume for your kind consideration in your organisation. Pls take a look and let me know if any opportunity is there with you. ...
  • Q4. Respected sir/ma'am, I Suresh attaching my brief resume for your kind consideration in your organisation. Pls take a look and let me know if any opportunity is there with you. ...
Round 3 - Group Discussion 

Previous experience and job profile and working

KEC International Interview FAQs

How many rounds are there in KEC International OHE Engineer interview?
KEC International interview process usually has 1 rounds. The most common rounds in the KEC International interview process are Technical.
What are the top questions asked in KEC International OHE Engineer interview?

Some of the top questions asked at the KEC International OHE Engineer interview -

  1. Mast erection, bracket erection, wiring, adjustment,acd checking,tw checking,at...read more
  2. Railway electrification rela...read more
  3. OHE railway electrification rela...read more

Tell us how to improve this page.

KEC International OHE Engineer Interview Process

based on 3 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 737 Interviews
Siemens Interview Questions
4.1
 • 429 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
Thermax Limited Interview Questions
4.2
 • 247 Interviews
ABB Interview Questions
4.1
 • 231 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
View all
KEC International OHE Engineer Salary
based on 67 salaries
₹2.4 L/yr - ₹7.5 L/yr
7% more than the average OHE Engineer Salary in India
View more details

KEC International OHE Engineer Reviews and Ratings

based on 13 reviews

4.7/5

Rating in categories

4.1

Skill development

4.1

Work-life balance

4.3

Salary

3.9

Job security

4.2

Company culture

3.5

Promotions

4.1

Work satisfaction

Explore 13 Reviews and Ratings
Assistant Manager
658 salaries
unlock blur

₹5.2 L/yr - ₹21.9 L/yr

Senior Engineer
434 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
224 salaries
unlock blur

₹1 L/yr - ₹9 L/yr

Project Engineer
213 salaries
unlock blur

₹2.6 L/yr - ₹11 L/yr

Project Manager
199 salaries
unlock blur

₹10.2 L/yr - ₹43 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview