Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International

Compare button icon Compare button icon Compare
4.1

based on 3.5k Reviews

Filter interviews by

KEC International Structural Engineer Interview Questions and Answers

Updated 27 Sep 2023

KEC International Structural Engineer Interview Experiences

1 interview found

I applied via Recruitment Consulltant and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Ask to me about bridge structure
  • Q2. Like pile foundation, open foundation, sub structure, super structure Bridge etc.
  • Q3. Job location discussion
  • Q4. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - It's well

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Birla Institute of Technology and Science (BITS), Pilani and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Social media connecting people

Round 2 - Technical 

(2 Questions)

  • Q1. Timoshenko beam theory
  • Q2. Sfd and bmd diagram
  • Ans. 

    Sfd and bmd diagrams show the variation of shear force and bending moment along the length of a structural member.

    • SFD (Shear Force Diagram) shows the variation of shear force along the length of a beam or structural member.

    • BMD (Bending Moment Diagram) shows the variation of bending moment along the length of a beam or structural member.

    • SFD and BMD are essential for analyzing the internal forces and moments in a structu...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Ans. 

    I am a structural engineer with 5 years of experience in designing and analyzing buildings and bridges.

    • Graduated with a degree in Civil Engineering

    • Worked on various projects including high-rise buildings and pedestrian bridges

    • Proficient in software such as AutoCAD and SAP2000

  • Answered by AI
  • Q2. Preference of job location
  • Ans. 

    I am open to job locations that offer opportunities for growth and development.

    • I am willing to relocate for the right job opportunity

    • I prefer job locations with good transportation options

    • I am open to both urban and rural locations depending on the job requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well both technical and communication skills
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is dual case in finding R value in EQ
  • Ans. 

    Dual case in finding R value in EQ refers to considering both the worst-case scenario and the best-case scenario.

    • Dual case involves analyzing the structure's response to both maximum and minimum loads.

    • It helps in determining the range of possible outcomes for the structure.

    • For example, in seismic design, dual case analysis considers both the maximum and minimum seismic forces that the structure may experience.

  • Answered by AI
  • Q2. Why you are shifting your job

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and answer honestly
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the IS code of pile.
  • Ans. 

    IS 2911 is the Indian Standard code for design and construction of pile foundations.

    • IS 2911 is the code for design and construction of pile foundations in India.

    • It covers various types of piles including driven piles, bored cast-in-situ piles, etc.

    • The code provides guidelines for the design, materials, construction, and testing of piles.

    • It ensures the safety and stability of structures supported by piles.

    • Example: IS 29...

  • Answered by AI
  • Q2. What is the density of bentonite during piling.
  • Ans. 

    The density of bentonite during piling is typically around 1.0 to 1.2 g/cm^3.

    • The density of bentonite can vary depending on the specific type and concentration used.

    • Higher density bentonite is often preferred for better support during piling operations.

    • Typical range of density for bentonite during piling is 1.0 to 1.2 g/cm^3.

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is mean by shear key
  • Ans. 

    Shear key is a device used to transfer shear forces between two components in a structure.

    • Shear keys are typically used in construction joints to prevent sliding between adjacent components.

    • They are designed to resist horizontal forces and ensure stability.

    • Shear keys can be found in structures such as bridges, buildings, and dams.

    • Examples include shear keys in bridge expansion joints to prevent movement between bridge

  • Answered by AI
  • Q2. Different between columns and beams
  • Ans. 

    Columns are vertical structural members that support loads, while beams are horizontal members that transfer loads to columns or walls.

    • Columns are vertical and primarily support compressive loads.

    • Beams are horizontal and primarily support bending loads.

    • Columns are typically taller than they are wide, while beams are typically wider than they are tall.

    • Examples: In a building, columns support the weight of the floors abo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Ss
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. What should be the height of Tremie pipe from pile founding level during concrete?
  • Ans. 

    The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.

    • The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.

    • Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.

    • Adjustment...

  • Answered by AI
  • Q2. Which all codes are used for structure engineering ?
  • Ans. 

    Various codes are used in structural engineering to ensure safety and compliance with regulations.

    • International Building Code (IBC)

    • American Society of Civil Engineers (ASCE) standards

    • American Concrete Institute (ACI) standards

    • American Institute of Steel Construction (AISC) standards

    • Eurocode

    • National Building Code of Canada (NBCC)

  • Answered by AI
  • Q3. What is the role of bearings in Bridges?
  • Ans. 

    Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.

    • Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.

    • Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.

    • Different types of bearings include elastomeric bearings, pot bearings, and slid...

  • Answered by AI
  • Q4. Which formula is used to calculate the elongation of PSC Girder?
  • Ans. 

    The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.

    • The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)

    • Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder

    • The change in length is the difference between the original length and the length...

  • Answered by AI
  • Q5. What is the Process of Making PSC Girder?
  • Ans. 

    The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.

    • Prepare the concrete mix with a specific ratio of cement, aggregates, and water.

    • Pour the mix into a formwork that is designed to the shape and size of the girder.

    • Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.

    • Cure the girder by m...

  • Answered by AI
  • Q6. What is socketing length in Pile?
  • Ans. 

    Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.

    • Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.

    • It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.

    • Socketing length can vary depending on the site c...

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Why do you want to leave your previous Job?
  • Q2. Are you ready to relocate ?
  • Q3. How much salary do you expect?
  • Q4. Tell me am Example when you did Team Work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for the answer like your Job change decision with strong reason. And before appearing any Interview, Read all the notes , which all you prepared Earlier. And one more thing, read about the topic for which you have applied specially and about the company as well.

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Written technical of 3 questions
  • Q2. 1. Find weight and COG of an irrrgular shape. Unit weight of member was given. 2. Calculate force required for COG shift. W load was applied at center of rectangle and we had to calculate forces at all fou...
  • Ans. 

    Interview questions for Structural Engineer

    • For irregular shape, find volume and multiply by unit weight to get weight. Divide moment of each part by total weight to get COG.

    • To calculate force required for COG shift, use moment equation. Sum of moments about any point should be equal to zero.

    • For SFD and BMD, use equations of equilibrium and moment. Draw free body diagram to show all forces acting on the portal.

    • Understan...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Explain barge and lifting analysis with full procedure. Various lifting factors. Support condition in barge and lifting analysis. Local check of equipment supporting beam.
  • Ans. 

    Barge and lifting analysis involves determining the support conditions and lifting factors for equipment on a barge.

    • Barge and lifting analysis is used to ensure that equipment on a barge is properly supported and can be safely lifted.

    • The procedure involves analyzing the support conditions of the barge and the equipment, as well as determining the lifting factors required to safely lift the equipment.

    • Various factors mus...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident of whatever you have written on resume.

I applied via Walk-in and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Tell about yourself
  • Q2. How r your experience in civil structur

Interview Preparation Tips

Interview preparation tips for other job seekers - Any interviews asking practically questions not enough theory
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of base plate
  • Ans. 

    Base plate design involves determining the size, thickness, and material of the plate to support the structural load.

    • Consider the load requirements and dimensions of the column being supported

    • Calculate the required thickness and size of the base plate based on the load

    • Select a suitable material for the base plate, such as steel or concrete

    • Ensure proper anchorage and connection details for the base plate

  • Answered by AI
  • Q2. Roughly draw a base plate connection
  • Ans. 

    A base plate connection is a structural element used to connect a steel column to a concrete foundation.

    • Base plate connections are typically used in steel structures to transfer loads from the column to the foundation.

    • The base plate is usually welded to the bottom of the column and anchored to the concrete foundation using anchor bolts.

    • The base plate connection design must consider factors such as load transfer, bendin...

  • Answered by AI

I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Introduce yourself (Technically)
  • Q2. Thereafter all the questions are based on my experience

Interview Preparation Tips

Interview preparation tips for other job seekers - First of all, you have to be the confidant and never hesitate to accept, prepare resume only with true credentials which you have executed already because they want to know that you have involved in the work or not, most important thing is, when you are blanked with the question Accept that you are blanked in front of interviewer

KEC International Interview FAQs

What are the top questions asked in KEC International Structural Engineer interview?

Some of the top questions asked at the KEC International Structural Engineer interview -

  1. Like pile foundation, open foundation, sub structure, super structure Bridge et...read more
  2. Ask to me about bridge struct...read more

Tell us how to improve this page.

KEC International Structural Engineer Salary
based on 15 salaries
₹3.9 L/yr - ₹7.5 L/yr
11% less than the average Structural Engineer Salary in India
View more details

KEC International Structural Engineer Reviews and Ratings

based on 2 reviews

4.7/5

Rating in categories

5.0

Skill development

4.0

Work-Life balance

3.0

Salary & Benefits

4.7

Job Security

4.4

Company culture

3.7

Promotions/Appraisal

4.7

Work Satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
620 salaries
unlock blur

₹5.2 L/yr - ₹20 L/yr

Senior Engineer
435 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
224 salaries
unlock blur

₹2.2 L/yr - ₹9.5 L/yr

Project Engineer
215 salaries
unlock blur

₹3.6 L/yr - ₹11 L/yr

Project Manager
214 salaries
unlock blur

₹11.9 L/yr - ₹43 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Sterlite Power

3.9
Compare

Kalpataru Projects International

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview