1 Question

  • Q1. What will u do if casing traped after Concreating
  • Ans. 

    If casing gets trapped after concreting, I would follow these steps to resolve the issue.

    • Assess the situation and determine the cause of the casing getting trapped

    • If the casing is stuck due to concrete hardening, try to break the concrete around it using appropriate tools

    • If breaking the concrete is not feasible, consider using a hydraulic jack to push the casing out

    • Consult with experienced professionals or engineers fo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Shear ur experience on sight & remember all

Civil Site Engineer Interview Questions & Answers

user image Purnesh Prince

posted on 12 Mar 2023

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions and is codes Safety procedures
Round 3 - HR 

(1 Question)

  • Q1. About past job and salary benifit

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are technically good then it will be best for you

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Metro project Bumbai
  • Q2. Metro project Bumbai j.kumar
  • Q3. J.kumar metro project
  • Ans. 

    J.kumar metro project is a major infrastructure project involving construction of metro rail system.

    • J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.

    • The project involves various stages such as planning, design, construction, and implementation.

    • It may include tasks like excavation, tunneling, track laying, station construction, etc.

    • The project requires coordination wi...

  • Answered by AI
  • Q4. Site Engineer , metro project
  • Q5. Very good company

Interview Preparation Tips

Topics to prepare for J. Kumar Infraprojects Civil Site Engineer interview:
  • Civil Engineering
  • Site Engineering
  • Site Supervision
Interview preparation tips for other job seekers - Site Engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the nominal brick size?
  • Ans. 

    The nominal brick size is typically 90 mm x 90 mm x 90 mm.

    • Nominal brick size is commonly 90 mm x 90 mm x 90 mm.

    • It may vary slightly depending on the country or region.

    • Brick sizes are standardized for construction purposes.

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Sir B.E civil engineer hai Mere job nhi laga DBL company me training deye RE Wall Four lanning of mangalwedh_Solapur section of NH_166 Pkg in the state of Maharashtra
  • Q2. Mere DBL company me job nhi laga

Interview Preparation Tips

Interview preparation tips for other job seekers - Hindi
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Assignment 

Related to auto level and total station one more thing buliding material

Round 2 - HR 

(1 Question)

  • Q1. About the site work

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • For leveling

I applied via Company Website and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Your present job profile is important
  • Q2. What is your work and responsiblety
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Where do you see yourself in 5 years?
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work and more hard work........
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is specific weight of steel
  • Ans. 

    The specific weight of steel is the weight of a unit volume of steel material.

    • Specific weight is also known as the unit weight or density of a material.

    • It is typically measured in units of kilograms per cubic meter (kg/m³) or pounds per cubic foot (lb/ft³).

    • The specific weight of steel can vary depending on the type and grade of steel.

    • For example, the specific weight of mild steel is around 7850 kg/m³ or 490 lb/ft³.

    • High...

  • Answered by AI
  • Q2. What does M stands for in M20.
  • Ans. 

    M stands for Mix in M20.

    • M20 is a designation for the mix ratio of concrete.

    • The M stands for Mix, indicating the mix ratio of cement, sand, and aggregate.

    • M20 represents a mix ratio of 1:1.5:3, where 1 is cement, 1.5 is sand, and 3 is aggregate.

    • Different grades of concrete have different mix ratios, with M20 being a commonly used grade.

  • Answered by AI
  • Q3. M stand for mix was the answer

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have to work in hardship and with extreme pressure work here.

I applied via Approached by Company and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Where do you see yourself in 5 years?

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Civil engineer dilip bild con
Good job good work

I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is a Foundation
  • Ans. 

    A foundation is a structural element that supports a building or other structure by transferring its load to the underlying soil or rock.

    • Foundations are typically made of concrete, masonry, or steel.

    • They are designed to distribute the weight of the structure evenly and prevent settlement or movement.

    • Different types of foundations include shallow foundations (such as strip footings and mat foundations) and deep foundati...

  • Answered by AI
  • Q2. Full name of RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete.

    • RCC is a composite material made of cement, sand, aggregates, and steel reinforcement.

    • It is widely used in construction for its strength and durability.

    • The steel reinforcement provides tensile strength to the concrete, while the cement, sand, and aggregates provide compressive strength.

    • RCC is commonly used in the construction of buildings, bridges, dams, and other structures.

    • Ex...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am civil structure site engineer 5 year experience in RCC work

KEC International Interview FAQs

How many rounds are there in KEC International Civil Site Engineer interview?
KEC International interview process usually has 3 rounds. The most common rounds in the KEC International interview process are Resume Shortlist, One-on-one Round and HR.
How to prepare for KEC International Civil Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Safety and Site Execution.
What are the top questions asked in KEC International Civil Site Engineer interview?

Some of the top questions asked at the KEC International Civil Site Engineer interview -

  1. What will u do if casing traped after Concreat...read more
  2. Technical questions and is codes Safety procedu...read more

Tell us how to improve this page.

KEC International Civil Site Engineer Interview Process

based on 4 interviews

Interview experience

4.5
  
Good
View more
Join KEC International Building Infrastructure for the World of Tomorrow
KEC International Civil Site Engineer Salary
based on 141 salaries
₹2 L/yr - ₹7.8 L/yr
36% more than the average Civil Site Engineer Salary in India
View more details

KEC International Civil Site Engineer Reviews and Ratings

based on 57 reviews

4.1/5

Rating in categories

4.1

Skill development

4.1

Work-life balance

4.1

Salary

4.2

Job security

4.1

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 57 Reviews and Ratings
Assistant Manager
653 salaries
unlock blur

₹5.2 L/yr - ₹18.5 L/yr

Senior Engineer
426 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
223 salaries
unlock blur

₹1.3 L/yr - ₹9.5 L/yr

Project Engineer
215 salaries
unlock blur

₹3 L/yr - ₹11 L/yr

Safety Officer
205 salaries
unlock blur

₹2 L/yr - ₹7.8 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview