Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Interview Questions, Process, and Tips for Experienced

Updated 8 Apr 2025

Top KEC International Interview Questions and Answers for Experienced

View all 116 questions

KEC International Interview Experiences for Experienced

Popular Designations

195 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

English and aptitude were checked

Round 2 - One-on-one 

(3 Questions)

  • Q1. What's zero liquid discharge?
  • Ans. 

    Zero liquid discharge is a water treatment process that eliminates liquid waste by recovering and reusing all water for industrial purposes.

    • Water treatment process

    • Eliminates liquid waste

    • Recovers and reuses all water

    • Common in industries like textile, pharmaceutical, and power plants

  • Answered by AI
  • Q2. What's carbon footprint?
  • Ans. 

    Carbon footprint is the total amount of greenhouse gases produced directly and indirectly by human activities.

    • It includes emissions from burning fossil fuels for electricity, heat, and transportation.

    • Factors contributing to carbon footprint include diet, travel habits, and energy consumption.

    • Reducing carbon footprint involves using renewable energy sources, energy-efficient appliances, and sustainable transportation.

    • Ca...

  • Answered by AI
  • Q3. What's hazardous waste and solid waste management?
  • Ans. 

    Hazardous waste is waste that poses a threat to public health or the environment, while solid waste management involves the collection, transportation, and disposal of non-hazardous waste.

    • Hazardous waste includes chemicals, batteries, pesticides, and radioactive materials.

    • Solid waste management includes recycling, composting, landfill disposal, and waste-to-energy facilities.

    • Proper management of hazardous waste is cruc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was easy.

Assistant Environment Health and Safety Manager Interview Questions asked at other Companies

Q1. How would you evacuate the people if an emergency occurs in the work place?
View answer (1)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. They had asked me about pre stressing, jacking force and elongation achieve, further moved on my past experience about CLC and asked about method of CLC using CFT and also sought about dimension and time c...
  • Q2. What is the time cycle?, Dimensions, Prestressing related questions, and questions on cantilever construction method by using cantilever formwork travellers

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep yourself calm, they are going to ask only what you have done earlier and don't hesitate to deny if something they ask and you don't know about it.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (62)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - QA/QC 

(3 Questions)

  • Q1. Quality Related Question
  • Q2. Quality Related Question Multiple Question.
  • Q3. Quality Related Question for ASME Section.

Interview Preparation Tips

Interview preparation tips for other job seekers - First Time Apply for KEC International Company.
I don't know whether I will get a job in this company or not , if I get a job in this company I will work for honestly.

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (4)

Interview Questions & Answers

user image Anonymous

posted on 5 Jul 2023

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Which types if cement we use for below plinth level structure

KEC International interview questions for popular designations

 Assistant Manager

 (12)

 Senior Engineer

 (10)

 Project Engineer

 (9)

 Project Manager

 (6)

 Safety Supervisor

 (6)

 Civil Engineer

 (6)

 Engineering Leadership Trainee

 (6)

 Manager

 (5)

Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
No response

I applied via Referral and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is railway and railway projects
  • Ans. 

    Railway is a transportation system that uses tracks to move trains carrying passengers and goods.

    • Railway projects involve the construction, maintenance, and improvement of railway infrastructure.

    • Examples of railway projects include building new railway lines, upgrading existing tracks, and installing new signaling systems.

    • Railway projects can also involve the purchase of new trains and the development of new technologi...

  • Answered by AI
  • Q2. How you can get order from railway
  • Ans. 

    To get an order from railway, one needs to follow the procurement process and meet the requirements.

    • Research and understand the procurement process of the railway

    • Identify the specific requirements for the product/service being offered

    • Ensure that the product/service meets the quality standards set by the railway

    • Submit a proposal or bid that meets all the requirements

    • Follow up with the railway to ensure that the proposal...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updats with railway and metro projects it will help for you

Marketing Officer Interview Questions asked at other Companies

Q1. 1 ) Introduce yourself 2) Highest Qualification 3) Cropping pattern in your area
View answer (3)

Get interview-ready with Top KEC International Interview Questions

I applied via Naukri.com and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basic civil engineering execution practices
  • Q2. IS codes, concrete technology, BBS

Interview Preparation Tips

Topics to prepare for KEC International Senior Engineer interview:
  • Concrete technology
  • Is code
  • Bbs
Interview preparation tips for other job seekers - Be real. Know that the interviewer is more knowledgeable. Dont fake intelligence. Be smart but dont overdo it.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (62)

Jobs at KEC International

View all
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Overhead equipments related
  • Ans. 

    Railway OHE work experience

  • Answered Anonymously
  • Q2. Railway Electrical
  • Q3. New and modified work
  • Ans. 

    Railway OHE new work and modifications

  • Answered Anonymously
  • Q4. Mast erection, wiring, ATD Adjustment,SED checking tawor wagon checking
  • Ans. 

    I have done all this work

  • Answered Anonymously
  • Q5. OHE foundation work
  • Q6. Mast grouting work

Interview Preparation Tips

Interview preparation tips for other job seekers - After the project was completed, I fired me

OHE Supervisor Interview Questions asked at other Companies

Q1. What is cess level , What is embedded length, what needs to maintain the OHE quality,
View answer (1)

Survey Engineer Interview Questions & Answers

user image Santu Halder

posted on 16 Dec 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

HRD, Tecnical, Project manager

Round 3 - Technical 

(2 Questions)

  • Q1. As per department
  • Q2. Survey Department

Survey Engineer Interview Questions asked at other Companies

Q1. What's is traversing, and describe it how to it calculate data.....
View answer (1)

Interview Questions & Answers

user image Chaman Lal Pandotra

posted on 5 Nov 2024

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Regarding quality
  • Q2. QMS IMS and site quality
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Cost of pile per Running metre
  • Ans. 

    Cost of pile per running meter is determined by factors like material, length, diameter, soil conditions, and installation method.

    • Cost of pile per running meter can vary based on the material used (concrete, steel, timber, etc.)

    • The length and diameter of the pile will also impact the cost per running meter

    • Soil conditions at the site can affect the cost as well

    • The method of installation (driven, drilled, etc.) will also...

  • Answered by AI
  • Q2. Process of Piling work
  • Ans. 

    Piling work involves driving piles into the ground to provide support for structures.

    • Piling work starts with site investigation to determine soil conditions

    • Piles are driven into the ground using various methods such as impact hammers or vibratory hammers

    • Different types of piles include driven piles, bored piles, and screw piles

    • Piling work requires careful planning and coordination with other construction activities

  • Answered by AI
  • Q3. Why Target compressing strength is always greater than Characteristics compressive strength ?
  • Ans. 

    Target compressive strength is greater due to safety factors and variations in material properties.

    • Target compressive strength accounts for safety factors to ensure structural integrity.

    • Characteristics compressive strength is based on ideal conditions and may not account for all variables.

    • Variations in material properties can lead to differences between target and characteristics compressive strength.

    • Target compressive...

  • Answered by AI
  • Q4. What is full form of "NCR" ?
  • Ans. 

    National Capital Region

    • Full form: National Capital Region

    • Refers to the metropolitan area in India that encompasses the entire NCT of Delhi and several districts in neighboring states

    • Includes cities like Gurgaon, Noida, Ghaziabad, Faridabad, etc.

  • Answered by AI
  • Q5. What is QAP and Method statement and why is this important?
  • Ans. 

    QAP stands for Quality Assurance Plan and Method Statement is a document detailing how a particular task will be completed.

    • QAP outlines the quality control procedures and standards that will be followed during a project.

    • Method statement provides a step-by-step guide on how a specific task will be carried out, ensuring safety and efficiency.

    • Both documents are important in ensuring that projects are completed to a high s...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For 300 mm dia. it's around ₹2200 per RM

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

KEC International Interview FAQs

How many rounds are there in KEC International interview for experienced candidates?
KEC International interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the KEC International interview process for experienced candidates are Technical, Resume Shortlist and HR.
How to prepare for KEC International interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Project Management, Transmission Line, Substation, EHS and Railways.
What are the top questions asked in KEC International interview for experienced candidates?

Some of the top questions asked at the KEC International interview for experienced candidates -

  1. 8. A critical deliverable which was to be delivered to the C-Suite is way behin...read more
  2. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide ...read more
  3. Which Advance excel used for inventory...read more
How long is the KEC International interview process?

The duration of KEC International interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

KEC International Interview Process for Experienced

based on 98 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Tata Projects Interview Questions
4.2
 • 453 Interviews
Dilip Buildcon Interview Questions
4.0
 • 147 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
GMR Group Interview Questions
4.0
 • 84 Interviews
View all

KEC International Reviews and Ratings

based on 3.8k reviews

4.0/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.9

Salary

4.1

Job security

3.8

Company culture

3.3

Promotions

3.7

Work satisfaction

Explore 3.8k Reviews and Ratings
TBM_Main_Chennai

Chennai

4-6 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
659 salaries
unlock blur

₹5.2 L/yr - ₹20 L/yr

Senior Engineer
453 salaries
unlock blur

₹4.3 L/yr - ₹14 L/yr

Civil Engineer
220 salaries
unlock blur

₹2.4 L/yr - ₹9 L/yr

Safety Officer
191 salaries
unlock blur

₹1.8 L/yr - ₹8 L/yr

Engineer
187 salaries
unlock blur

₹2.5 L/yr - ₹10 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview