posted on 7 Aug 2024
I applied via campus placement at National Institute of Technology (NIT), Hamirpur and was interviewed before Aug 2023. There were 2 interview rounds.
English and aptitude were checked
Zero liquid discharge is a water treatment process that eliminates liquid waste by recovering and reusing all water for industrial purposes.
Water treatment process
Eliminates liquid waste
Recovers and reuses all water
Common in industries like textile, pharmaceutical, and power plants
Carbon footprint is the total amount of greenhouse gases produced directly and indirectly by human activities.
It includes emissions from burning fossil fuels for electricity, heat, and transportation.
Factors contributing to carbon footprint include diet, travel habits, and energy consumption.
Reducing carbon footprint involves using renewable energy sources, energy-efficient appliances, and sustainable transportation.
Ca...
Hazardous waste is waste that poses a threat to public health or the environment, while solid waste management involves the collection, transportation, and disposal of non-hazardous waste.
Hazardous waste includes chemicals, batteries, pesticides, and radioactive materials.
Solid waste management includes recycling, composting, landfill disposal, and waste-to-energy facilities.
Proper management of hazardous waste is cruc...
posted on 16 Dec 2023
I applied via Recruitment Consulltant and was interviewed before Dec 2022. There were 3 interview rounds.
Top trending discussions
posted on 28 Dec 2023
posted on 13 Apr 2022
I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.
posted on 19 Jul 2022
I applied via Newspaper Ad and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 29 Oct 2023
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Oct 2022. There were 4 interview rounds.
Refer Aptitude questions
Debate of any Social topic
posted on 12 Nov 2021
I applied via Referral and was interviewed before Nov 2020. There were 3 interview rounds.
To implement EMP from scratch during execution, start with identifying key environmental aspects and impacts.
Identify key environmental aspects and impacts
Develop an action plan to address these aspects and impacts
Assign responsibilities and establish timelines
Train employees on the action plan and their roles
Monitor and measure progress regularly
Review and update the EMP as needed
The main principle of ISO 14001 is to establish an effective environmental management system.
ISO 14001 is a standard for environmental management systems.
It focuses on establishing a framework for managing environmental responsibilities.
The main principle is to continually improve environmental performance.
It requires organizations to identify and control their environmental impact.
ISO 14001 also emphasizes compliance
The main pollutants in construction sites include dust, noise, and chemicals.
Dust from excavation and demolition activities
Noise from heavy machinery and equipment
Chemicals from paints, solvents, and adhesives
Diesel exhaust from construction vehicles
Sediment runoff from erosion
Asbestos and lead from older buildings
Construction waste and debris
Vibration from pile driving and drilling
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
662
salaries
| ₹5.2 L/yr - ₹21.9 L/yr |
Senior Engineer
430
salaries
| ₹4.3 L/yr - ₹13 L/yr |
Civil Engineer
216
salaries
| ₹2.4 L/yr - ₹9.1 L/yr |
Project Engineer
215
salaries
| ₹2.6 L/yr - ₹11 L/yr |
Safety Officer
188
salaries
| ₹1.8 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Sterlite Power
Kalpataru Projects International