Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Assistant Environment Health and Safety Manager Interview Questions and Answers

Updated 7 Aug 2024

KEC International Assistant Environment Health and Safety Manager Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Technology (NIT), Hamirpur and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

English and aptitude were checked

Round 2 - One-on-one 

(3 Questions)

  • Q1. What's zero liquid discharge?
  • Ans. 

    Zero liquid discharge is a water treatment process that eliminates liquid waste by recovering and reusing all water for industrial purposes.

    • Water treatment process

    • Eliminates liquid waste

    • Recovers and reuses all water

    • Common in industries like textile, pharmaceutical, and power plants

  • Answered by AI
  • Q2. What's carbon footprint?
  • Ans. 

    Carbon footprint is the total amount of greenhouse gases produced directly and indirectly by human activities.

    • It includes emissions from burning fossil fuels for electricity, heat, and transportation.

    • Factors contributing to carbon footprint include diet, travel habits, and energy consumption.

    • Reducing carbon footprint involves using renewable energy sources, energy-efficient appliances, and sustainable transportation.

    • Ca...

  • Answered by AI
  • Q3. What's hazardous waste and solid waste management?
  • Ans. 

    Hazardous waste is waste that poses a threat to public health or the environment, while solid waste management involves the collection, transportation, and disposal of non-hazardous waste.

    • Hazardous waste includes chemicals, batteries, pesticides, and radioactive materials.

    • Solid waste management includes recycling, composting, landfill disposal, and waste-to-energy facilities.

    • Proper management of hazardous waste is cruc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was easy.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Power, Insulation resistance testing, Conductivity, HIRA
Round 3 - HR 

(1 Question)

  • Q1. Question about previous experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Read & Prepare Whatever you write in resume

Assistant Environment Health and Safety Manager Interview Questions Asked at Other Companies

Q1. How would you evacuate the people if an emergency occurs in the w ... read more
Q2. What is HSE plan & what sources to be required on the ground?
Q3. What is risk assessment and Tell about the format of Risk assessm ... read more
Q4. What Precautions are needed to be taken while doing Manual handli ... read more
Q5. What is JSA? What is Safe work method? Difference between safe wo ... read more

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Launcher girder questions asked and general safety questions

I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. Tell me about yourself.
Round 3 - Technical 

(1 Question)

  • Q1. About R&R, EHS Management System, ISO 45001:2018, General Safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident! Anwer honestly and must study about company that you applying to.

I applied via Newspaper Ad and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About previous experience and work deliverables
Round 2 - HR 

(1 Question)

  • Q1. Salary negotiation for the position

Interview Preparation Tips

Interview preparation tips for other job seekers - Was not interviewed by SHE manager. Planning manager has interviewed. All questions regarding how Metro Project will be managed.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Refer Aptitude questions

Round 3 - Group Discussion 

Debate of any Social topic

Round 4 - Technical 

(1 Question)

  • Q1. ISO 45001, 14001

I applied via Referral and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How do you start the implementation of EMP from scratch during execution?
  • Ans. 

    To implement EMP from scratch during execution, start with identifying key environmental aspects and impacts.

    • Identify key environmental aspects and impacts

    • Develop an action plan to address these aspects and impacts

    • Assign responsibilities and establish timelines

    • Train employees on the action plan and their roles

    • Monitor and measure progress regularly

    • Review and update the EMP as needed

  • Answered by AI
  • Q2. What is the main principle of ISO 14001?
  • Ans. 

    The main principle of ISO 14001 is to establish an effective environmental management system.

    • ISO 14001 is a standard for environmental management systems.

    • It focuses on establishing a framework for managing environmental responsibilities.

    • The main principle is to continually improve environmental performance.

    • It requires organizations to identify and control their environmental impact.

    • ISO 14001 also emphasizes compliance

  • Answered by AI
  • Q3. What are the main pollutants in construction site
  • Ans. 

    The main pollutants in construction sites include dust, noise, and chemicals.

    • Dust from excavation and demolition activities

    • Noise from heavy machinery and equipment

    • Chemicals from paints, solvents, and adhesives

    • Diesel exhaust from construction vehicles

    • Sediment runoff from erosion

    • Asbestos and lead from older buildings

    • Construction waste and debris

    • Vibration from pile driving and drilling

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for all the questions on your work experience. As the interviewer will test all your past skills based on the projects handled by you in your previous firms.

Skills evaluated in this interview

KEC International Interview FAQs

How many rounds are there in KEC International Assistant Environment Health and Safety Manager interview?
KEC International interview process usually has 2-3 rounds. The most common rounds in the KEC International interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in KEC International Assistant Environment Health and Safety Manager interview?

Some of the top questions asked at the KEC International Assistant Environment Health and Safety Manager interview -

  1. What's hazardous waste and solid waste manageme...read more
  2. What's zero liquid dischar...read more
  3. What's carbon footpri...read more

Tell us how to improve this page.

KEC International Assistant Environment Health and Safety Manager Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 740 Interviews
Tata Projects Interview Questions
4.2
 • 423 Interviews
Siemens Interview Questions
4.1
 • 416 Interviews
Thermax Limited Interview Questions
4.1
 • 249 Interviews
ABB Interview Questions
4.1
 • 232 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
View all
8% more than the average Assistant Environment Health and Safety Manager Salary in India
View more details

KEC International Assistant Environment Health and Safety Manager Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.7

Skill development

3.0

Work-life balance

3.3

Salary

4.3

Job security

3.3

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
662 salaries
unlock blur

₹5.2 L/yr - ₹21.9 L/yr

Senior Engineer
430 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
216 salaries
unlock blur

₹2.4 L/yr - ₹9.1 L/yr

Project Engineer
215 salaries
unlock blur

₹2.6 L/yr - ₹11 L/yr

Safety Officer
188 salaries
unlock blur

₹1.8 L/yr - ₹7.6 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview