Q1. 8. A critical deliverable which was to be delivered to the C-Suite is way behind schedule, and you get to know this in the 11th hour. How will you communicate this to the leadership?
Communicate the delay in critical deliverable to C-Suite in the 11th hour
Immediately inform the C-Suite about the delay and the reasons behind it
Provide a clear plan of action to mitigate the delay and ensure timely delivery
Be transparent and honest about the situation
Assure the C-Suite that steps are being taken to prevent such delays in the future
Offer alternative solutions or options if possible
Q2. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide jack lapping in cuplock system...
The number of manpower required in a 1000 sqmt area for a 7-day slab cycle and how to provide jack lapping in the cuplock system.
To determine the number of manpower required, consider the efficiency and productivity of the workers.
Factors such as the complexity of the slab, experience of the workers, and availability of equipment should be taken into account.
For example, if each worker can cover 50 sqmt per day, then 1000 sqmt will require 20 workers for a 7-day cycle.
Jack la...read more
Q3. What is the travel speed of Gantry in horizontal and vertical?
The travel speed of Gantry in horizontal and vertical depends on the specific model and manufacturer.
The travel speed can range from 100 to 500 feet per minute depending on the model.
The vertical speed can range from 50 to 200 feet per minute depending on the model.
Some examples of gantry models and their speeds are: XYZ gantry with a horizontal speed of 300 feet per minute and a vertical speed of 100 feet per minute, and ABC gantry with a horizontal speed of 200 feet per min...read more
Q4. Which Advance excel used for inventory..?
Advanced Excel features used for inventory management
Data validation to ensure accurate data entry
Conditional formatting to highlight low stock levels
Pivot tables to analyze inventory data
VLOOKUP and HLOOKUP to quickly retrieve information
Macro-enabled templates for automated inventory tracking
Q5. 7. A vendor is very rigid with a change. The change entails a crucial aspect of your system which is an extension, but was not documented explicitly. How will you negotiate?
Negotiate with vendor regarding a crucial undocumented change
Understand the reason for the vendor's rigidity
Explain the importance of the change and its impact on the system
Provide evidence to support the need for the change
Offer alternative solutions or compromises
Involve higher management if necessary
Q6. Classification of cranes and working principles of Crane and how you calculate fall of rope ?
Classification and working principles of cranes and how to calculate fall of rope.
Cranes are classified based on their functions, such as mobile, tower, and overhead cranes.
The working principle of a crane involves the use of pulleys, cables, and motors to lift and move heavy objects.
The fall of rope is calculated by dividing the distance the load needs to be lifted by the number of parts of rope supporting the load.
For example, if the load needs to be lifted 100 feet and the...read more
Q7. Boom placer model and how it’s works and facing problems?
Boom placer is a machine used in construction to place concrete at high elevations.
Boom placer uses a hydraulic system to lift and place concrete.
It can be mounted on a truck or trailer for easy transportation.
Common problems include hydraulic leaks and malfunctions, as well as operator error.
Regular maintenance and proper training can help prevent these issues.
Q8. 2. What do you think about the future of digitalising HR, as a function?
Digitalising HR is the future of HR function.
Digitalisation of HR will lead to increased efficiency and accuracy in HR processes.
It will enable HR professionals to focus on strategic initiatives rather than administrative tasks.
Digital HR tools such as HR analytics, AI-powered recruitment, and chatbots will become more prevalent.
Remote work and virtual collaboration will also drive the need for digital HR solutions.
However, it is important to ensure data privacy and security ...read more
Q9. 5. Walk me through an HR System implementation roadmap, right from sourcing to institutionalising it and then sustaining it?
An HR system implementation roadmap involves sourcing, planning, testing, training, and institutionalizing the system.
Identify the need for an HR system and define the requirements
Source and evaluate potential vendors or build in-house
Plan the implementation timeline and allocate resources
Test the system and ensure it meets the requirements
Train employees on how to use the system
Institutionalize the system by integrating it into daily operations
Sustain the system by monitorin...read more
Q10. Which SAP T code used for mm ?
The SAP T code used for mm is MM01 for creating material master records and MM02 for changing them.
MM01 for creating material master records
MM02 for changing material master records
Q11. Explain M25 and what should be the value of cube of M25 grade concrete ?
M25 is a mix of concrete with a compressive strength of 25 MPa. The cube strength of M25 grade concrete should be 25 MPa.
M25 is a mix of concrete with a compressive strength of 25 MPa.
The cube strength of M25 grade concrete should be 25 MPa.
The mix proportion for M25 grade concrete is usually 1:1:2 (cement:sand:aggregate).
Q12. Which SAP movement type used for mm
Movement type 101 is used for goods receipt and 261 is used for goods issue in SAP MM.
101 for goods receipt
261 for goods issue
Q13. What is characteristic strength and terget mean strength ? Relation between both ?
Characteristic strength is the strength of a material below which not more than a specified proportion of test results are expected to fall. Target mean strength is the strength that a structure is designed to achieve.
Characteristic strength is a statistical value representing the lower tail of the strength distribution of a material.
Target mean strength is the strength that a structure is designed to achieve based on safety factors and design codes.
The relation between chara...read more
Q14. What is QAP and Method statement and why is this important?
QAP stands for Quality Assurance Plan and Method Statement is a document detailing how a particular task will be completed.
QAP outlines the quality control procedures and standards that will be followed during a project.
Method statement provides a step-by-step guide on how a specific task will be carried out, ensuring safety and efficiency.
Both documents are important in ensuring that projects are completed to a high standard and in a safe manner.
For example, in construction ...read more
Q15. Why Target compressing strength is always greater than Characteristics compressive strength ?
Target compressive strength is greater due to safety factors and variations in material properties.
Target compressive strength accounts for safety factors to ensure structural integrity.
Characteristics compressive strength is based on ideal conditions and may not account for all variables.
Variations in material properties can lead to differences between target and characteristics compressive strength.
Target compressive strength is used in design calculations to ensure the str...read more
Q16. What was the leading indicators in safety?
Leading indicators are proactive measures that help to identify potential safety issues before they result in incidents.
Leading indicators focus on prevention rather than reaction
They are measurable and trackable
Examples include safety training completion rates, near-miss reporting, and safety audits
They can help to identify trends and areas for improvement
Effective use of leading indicators can lead to a reduction in incidents and injuries
Q17. What will u do if casing traped after Concreating
If casing gets trapped after concreting, I would follow these steps to resolve the issue.
Assess the situation and determine the cause of the casing getting trapped
If the casing is stuck due to concrete hardening, try to break the concrete around it using appropriate tools
If breaking the concrete is not feasible, consider using a hydraulic jack to push the casing out
Consult with experienced professionals or engineers for guidance and assistance
Ensure safety measures are follow...read more
Q18. How will you differentiate earthed and unearthed system
In an earthed system, the electrical equipment is connected to the ground, while in an unearthed system, there is no connection to the ground.
Earthed system: Electrical equipment is connected to the ground for safety purposes.
Unearthed system: Electrical equipment is not connected to the ground.
In an earthed system, faults or excess current can be safely directed to the ground.
In an unearthed system, faults may cause electric shock or damage to equipment.
Earthed systems are c...read more
Q19. 1.Why the transformer rating is in MVA. 2.What is the use of Isolator. 3.Types of Circuit breaker and their differences.
Answers to questions related to transformers, isolators, and circuit breakers.
Transformer rating is in MVA because it indicates the maximum power that can be transferred through the transformer.
Isolators are used to isolate a section of the electrical circuit for maintenance or repair work.
Types of circuit breakers include air, oil, vacuum, and SF6 circuit breakers, each with their own advantages and disadvantages.
Air circuit breakers are commonly used in low voltage applicat...read more
Q20. How will you implement safety procedure at High rise building projects
Implementing safety procedures at high rise building projects involves thorough planning, training, and enforcement.
Conduct a thorough risk assessment of the high rise building project to identify potential hazards.
Develop and implement a comprehensive safety plan that includes protocols for working at heights, emergency response procedures, and regular safety inspections.
Provide extensive training to all workers on safety procedures, proper use of personal protective equipme...read more
Q21. What are the safety measures to be implemented in construction of building
Safety measures in construction include proper training, use of personal protective equipment, fall protection, and regular inspections.
Provide proper training to all workers on safety procedures and protocols
Ensure all workers wear appropriate personal protective equipment (PPE) such as hard hats, gloves, and safety glasses
Implement fall protection measures such as guardrails, safety nets, or personal fall arrest systems
Conduct regular inspections of the construction site to...read more
Q22. What are the stages of Project Lifecycle?
The stages of Project Lifecycle include initiation, planning, execution, monitoring and controlling, and closing.
Initiation: Define the project at a broad level and obtain approval to start.
Planning: Develop a roadmap for achieving the project goals.
Execution: Implement the plan and manage resources to complete the project.
Monitoring and Controlling: Track and review project progress to ensure it stays on track.
Closing: Finalize all activities to formally close the project.
Q23. What is the documentation work for EHS department.
Documentation work for EHS department includes creating and maintaining safety policies, procedures, incident reports, training records, and regulatory compliance documents.
Creating safety policies and procedures
Maintaining incident reports
Managing training records
Ensuring regulatory compliance
Updating safety manuals and guidelines
Conducting risk assessments and documenting findings
Maintaining safety data sheets (SDS)
Preparing safety audits and inspection reports
Q24. are you suitable for PAN India location
Yes, I am suitable for PAN India location.
I have experience working in different locations across India.
I am adaptable and can easily adjust to new environments.
I have knowledge of local regulations and standards in different states.
I have successfully completed projects in multiple cities like Mumbai, Delhi, and Bangalore.
Q25. Please provide all the required sizes of sieves needed to establish a fine aggregate sieve analysis.
The required sizes of sieves for fine aggregate sieve analysis are typically 3/8", #4, #8, #16, #30, #50, #100, and pan.
3/8" sieve
#4 sieve
#8 sieve
#16 sieve
#30 sieve
#50 sieve
#100 sieve
Pan
Q26. How incident rate can be reduced ?
Incident rate can be reduced by implementing safety measures, providing training, and promoting a safety culture.
Implement safety measures such as personal protective equipment, machine guards, and safety procedures
Provide training to employees on safety procedures, hazard identification, and emergency response
Promote a safety culture by encouraging reporting of near-misses and incidents, conducting safety audits, and recognizing safe behavior
Regularly review and update safet...read more
Q27. How to prepare cost estimation. CTC, budget preparation, control budget.
Cost estimation involves analyzing project requirements, historical data, and market trends to create a budget and control costs effectively.
Gather project requirements and scope to understand the work involved.
Analyze historical data from similar projects to identify cost patterns.
Consider market trends and inflation rates to adjust for future costs.
Use cost estimation techniques such as bottom-up or parametric estimating.
Create a detailed budget with line items for each asp...read more
Q28. What's Safety policy ?
Safety policy is a set of guidelines and procedures designed to ensure the safety of employees and prevent accidents in the workplace.
Safety policy outlines the responsibilities of employees and management in maintaining a safe work environment.
It includes procedures for identifying and reporting hazards, conducting safety training, and responding to emergencies.
Examples of safety policies include wearing personal protective equipment, following lockout/tagout procedures, and...read more
Q29. what type of official documents you prepared?
I have prepared various official documents including reports, proposals, contracts, and presentations.
Reports on company performance and financial analysis
Proposals for new business ventures and partnerships
Contracts for clients and vendors
Presentations for board meetings and conferences
Q30. What is full form of "NCR" ?
National Capital Region
Full form: National Capital Region
Refers to the metropolitan area in India that encompasses the entire NCT of Delhi and several districts in neighboring states
Includes cities like Gurgaon, Noida, Ghaziabad, Faridabad, etc.
Q31. Which types if cement we use for below plinth level structure
Q32. What's hazardous waste and solid waste management?
Hazardous waste is waste that poses a threat to public health or the environment, while solid waste management involves the collection, transportation, and disposal of non-hazardous waste.
Hazardous waste includes chemicals, batteries, pesticides, and radioactive materials.
Solid waste management includes recycling, composting, landfill disposal, and waste-to-energy facilities.
Proper management of hazardous waste is crucial to prevent pollution and protect human health and the ...read more
Q33. can you handle RVNL project
Yes, I have experience in handling RVNL projects.
I have previously managed a similar railway project
I am familiar with the processes and regulations involved
I have a strong team to support me
I am confident in my ability to deliver the project on time and within budget
Q34. Explian about climbing formwork & formwork performance report
Climbing formwork is a construction technique used to vertically move formwork as the building progresses. Formwork performance reports evaluate the efficiency and quality of formwork systems.
Climbing formwork is a method of constructing tall structures, such as high-rise buildings or bridges, by incrementally moving the formwork vertically as each level is completed.
It allows for faster construction and reduces the need for external scaffolding.
Climbing formwork systems are ...read more
Q35. types of formwork systems and it's capacities & limitations
Formwork systems include timber, steel, and aluminum forms, each with different capacities and limitations.
Timber formwork is versatile but has limited reuse and requires skilled labor for assembly.
Steel formwork is durable and can be reused multiple times, but is heavy and expensive.
Aluminum formwork is lightweight, easy to handle, and can be reused many times, but is costly upfront.
Each formwork system has specific load-bearing capacities and limitations based on material s...read more
Q36. What is the current CTC?
The current CTC is confidential and can be discussed during the negotiation phase.
It is common practice to keep the current CTC confidential until the negotiation stage.
Discussing the current CTC during the interview may not be appropriate.
The focus should be on the candidate's skills, experience, and fit for the role.
Salary expectations can be discussed separately during the hiring process.
Q37. EXPLAIN THE PILE TIME CYCLE?
The pile time cycle is the time taken to complete a single pile driving operation.
It involves the driving of a pile into the ground using a pile driver.
The cycle includes lifting the hammer, dropping it onto the pile, and raising it again.
Factors affecting the cycle include the size and weight of the hammer, soil conditions, and the length of the pile.
The cycle time can be reduced by using a hydraulic hammer or pre-augering the soil.
Efficient pile time cycles are crucial in c...read more
Q38. How may types of cement test?
There are several types of cement tests including compressive strength, setting time, soundness, fineness, and consistency.
Compressive strength test measures the ability of cement to withstand pressure.
Setting time test determines the time it takes for cement to harden.
Soundness test checks for the presence of any unsound compounds in cement.
Fineness test measures the particle size of cement.
Consistency test evaluates the workability and flow of cement.
Q39. Planning and design of fire protection system.
Planning and design of fire protection system involves identifying potential fire hazards and selecting appropriate fire protection measures.
Conduct a thorough risk assessment to identify potential fire hazards
Select appropriate fire protection measures based on the identified hazards
Consider factors such as building layout, occupancy, and fire load when designing the system
Ensure compliance with relevant codes and standards
Regularly test and maintain the system to ensure its...read more
Q40. What is mean by SCM and how its done?
SCM stands for Supply Chain Management, which involves the coordination and optimization of all activities involved in the procurement, production, and distribution of goods.
SCM involves planning, sourcing, making, delivering, and returning goods in an efficient and cost-effective manner.
It includes activities such as supplier selection, negotiation, order processing, inventory management, and logistics.
SCM aims to streamline processes, reduce costs, improve quality, and enha...read more
Q41. Which type of brick masonry is good
Flemish bond brick masonry is considered good due to its strength, durability, and aesthetic appeal.
Flemish bond brick masonry is known for its strong and durable structure.
It provides a visually appealing pattern with alternating headers and stretchers in each course.
The bond helps in distributing the load evenly across the wall.
Other types like English bond and Stretcher bond are also commonly used in brick masonry.
Q42. How many types do you shuttring formworks
Q43. What do you mean by BOCW act/ rules
BOCW act/rules refer to Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 and related rules.
BOCW act aims to regulate the employment and conditions of service of building and other construction workers.
It provides for the safety, health, and welfare measures for the workers.
The act also mandates the registration of construction workers and welfare boards for their benefit.
It covers aspects like working hours, wages, safety ...read more
Q44. Difference between OPC and PPC cement ?
OPC cement is Ordinary Portland Cement, while PPC cement is Portland Pozzolana Cement.
OPC is made by grinding clinker with gypsum, while PPC is made by intergrinding clinker with fly ash and gypsum.
PPC has higher long-term strength and durability compared to OPC.
PPC is more environmentally friendly due to the use of fly ash as a partial replacement for clinker.
OPC is commonly used for general construction purposes, while PPC is preferred for mass concreting works.
PPC has lowe...read more
Q45. Site accounting in railway and infrastructure
Site accounting in railway and infrastructure involves managing financial transactions and records related to construction and maintenance of railway tracks, stations, and other infrastructure.
Site accounting involves tracking expenses related to labor, materials, and equipment used in construction and maintenance projects.
It also involves managing budgets and forecasting future expenses.
Examples of site accounting in railway and infrastructure include managing the finances f...read more
Q46. What's Emergency plan ?
Emergency plan is a set of procedures and guidelines to be followed in case of an emergency or disaster.
It outlines the roles and responsibilities of individuals and teams during an emergency
It includes evacuation procedures, communication protocols, and emergency contacts
It should be regularly reviewed and updated to ensure its effectiveness
Examples include fire evacuation plans, severe weather plans, and active shooter plans
Q47. How to pay GST to contractors
GST can be paid to contractors through various modes such as cash, cheque, online transfer, etc.
GST can be paid through cash, cheque, demand draft, online transfer, or electronic payment modes
The payment must be made within 20 days from the end of the month in which the invoice was received
The GST paid can be claimed as input tax credit by the contractor
The GST amount to be paid can be calculated by multiplying the taxable value of the goods or services by the applicable GST ...read more
Q48. What is railway and railway projects
Railway is a transportation system that uses tracks to move trains carrying passengers and goods.
Railway projects involve the construction, maintenance, and improvement of railway infrastructure.
Examples of railway projects include building new railway lines, upgrading existing tracks, and installing new signaling systems.
Railway projects can also involve the purchase of new trains and the development of new technologies to improve safety and efficiency.
Railway projects are o...read more
Q49. Rate of different dia of Coupler?
The rate of different diameters of couplers can vary based on the specific type and manufacturer.
The rate of different diameters of couplers can depend on factors such as material, quality, and brand.
Some common diameters for couplers include 1/2 inch, 3/4 inch, and 1 inch.
Rates may also vary based on the intended use of the coupler, such as for plumbing or electrical connections.
Q50. Precautions related to lifting of materials
Precautions to be taken while lifting materials to prevent injuries and accidents.
Use proper lifting techniques such as bending at the knees and keeping the back straight
Avoid lifting heavy objects alone, ask for help if needed
Wear appropriate personal protective equipment like gloves and closed-toe shoes
Ensure the path is clear of obstacles and plan the lift before executing it
Take breaks in between lifting to avoid strain on muscles
Q51. What are the types of formwork
Formwork refers to the temporary or permanent molds used to hold wet concrete until it sets and hardens.
Timber formwork: made of wood and commonly used for small to medium-sized projects
Steel formwork: made of steel plates and commonly used for large-scale projects
Aluminum formwork: made of aluminum panels and commonly used for high-rise buildings
Plastic formwork: made of lightweight plastic and commonly used for small-scale projects or where quick assembly is required
Enginee...read more
Q52. How you can get order from railway
To get an order from railway, one needs to follow the procurement process and meet the requirements.
Research and understand the procurement process of the railway
Identify the specific requirements for the product/service being offered
Ensure that the product/service meets the quality standards set by the railway
Submit a proposal or bid that meets all the requirements
Follow up with the railway to ensure that the proposal is being considered
Negotiate terms and conditions if nece...read more
Q53. Which safety hazard electrical protection
One safety hazard in electrical protection is electric shock.
Electric shock can occur when coming into contact with live electrical parts.
Proper grounding and insulation of electrical equipment is essential to prevent electric shock.
Regular maintenance and inspections of electrical systems can help identify potential hazards.
Using personal protective equipment such as insulated gloves and safety goggles can reduce the risk of electric shock.
Training employees on electrical sa...read more
Q54. 25kv and 132kv difference
25kv and 132kv are different voltage levels used in electrical power transmission.
25kv is a lower voltage level used for distribution of power to residential and commercial areas.
132kv is a higher voltage level used for transmission of power over long distances.
Higher voltage levels are used to reduce power losses during transmission.
Both voltage levels require different equipment and safety measures.
For example, 25kv may use overhead lines while 132kv may use underground cab...read more
Q55. What is LTI /FR?
LTI stands for Lost Time Injury and FR stands for First Aid Record.
LTI refers to an injury that results in an employee being unable to work for a period of time.
FR refers to an injury that requires first aid treatment but does not result in lost time from work.
Both LTI and FR are used as safety performance indicators in the workplace.
Reducing the number of LTIs and FRs is a key goal of safety programs.
Examples of LTIs include fractures, amputations, and serious burns.
Examples...read more
Q56. Tell something about geo dynamic
Geo dynamics is the study of the movement and changes in the Earth's crust and interior.
It involves the study of plate tectonics, earthquakes, volcanoes, and other geological phenomena.
Geo dynamic processes can have significant impacts on human populations, such as landslides and tsunamis.
Understanding geo dynamics is important for predicting and mitigating natural disasters.
Geo dynamic research also helps us understand the history and evolution of the Earth.
Examples of geo d...read more
Q57. Quality and quantity as per drawing
Quality and quantity as per drawing refers to ensuring that the materials and workmanship meet the specifications outlined in the project drawings.
Ensure that all materials used in construction match the specifications provided in the drawings
Verify that the workmanship meets the quality standards set forth in the drawings
Quantify the materials required for the project based on the drawings to ensure accurate billing
Compare the actual quantities used on site with the quantiti...read more
Q58. How to use concrete is sub-structure
Concrete is used in sub-structures for providing a strong foundation and support for the building above.
Concrete is typically used for constructing foundations, footings, and basement walls in sub-structures.
Reinforcement bars are often used within the concrete to increase its strength and durability.
Proper compaction and curing of the concrete are essential for ensuring its structural integrity.
Waterproofing measures may be necessary to protect the concrete from moisture and...read more
Q59. How many types do you formworks
Q60. What is Liquefaction
Q61. Software on which work comfortably
I work comfortably on software like AutoCAD, SolidWorks, and MATLAB.
AutoCAD
SolidWorks
MATLAB
Q62. Overall journey Managing working capital Tendering
My overall journey has equipped me with strong skills in managing working capital and tendering processes.
I have successfully managed working capital by implementing efficient cash flow management strategies.
I have experience in analyzing financial statements to identify areas for improvement in working capital management.
I have led tendering processes by developing strong relationships with suppliers and negotiating favorable terms.
I have a track record of winning competitiv...read more
Q63. Wher this materials errection.
I'm sorry, but the question is not clear and seems to be incomplete.
The question seems to be incomplete and lacks context.
Please provide more information or clarify the question.
Without proper context, it is impossible to provide a meaningful answer.
Q64. Ri no of Ohe materials.
Ri no is a unique identification number assigned to each type of Ohe material used in railway electrification.
Ri no stands for Railway Identification Number.
It helps in identifying the type of Ohe material used in railway electrification.
Each type of material has a unique Ri no assigned to it.
For example, Ri no 60E1 is used for 60 kg/m rail section.
Ri no 60E2 is used for 60 kg/m rail section with elastic fastening system.
Q65. Materials assembly name
Materials assembly name refers to the identification given to a group of materials that are assembled together for a specific purpose.
Materials assembly name is used to identify a group of materials that are assembled together for a specific purpose
It helps in inventory management and tracking of materials
Examples of materials assembly names include 'Electronics Kit', 'Plumbing Kit', 'Painting Kit', etc.
Q66. What kind of formwork system
The formwork system used depends on the specific project requirements and constraints.
Different types of formwork systems include traditional timber formwork, steel formwork, aluminum formwork, and modular formwork.
Traditional timber formwork is commonly used for small-scale projects and is cost-effective.
Steel formwork is durable and suitable for large-scale projects with repetitive structures.
Aluminum formwork is lightweight and easy to handle, making it ideal for fast-trac...read more
Q67. What is load bearing cuplock
Load bearing cuplock is a type of scaffolding system used in construction to support heavy loads.
Load bearing cuplock is a versatile and efficient scaffolding system.
It consists of vertical standards with cup joints and horizontal ledgers that are connected using captive wedges.
The cup joints allow for quick and easy assembly and disassembly of the system.
Load bearing cuplock can support heavy loads and is commonly used in high-rise construction, bridge construction, and indu...read more
Q68. Weight of 12mm dia steel of 12mtr long
The weight of a 12mm diameter steel rod that is 12m long can be calculated using the formula for the weight of a cylindrical object.
Calculate the volume of the steel rod using the formula for the volume of a cylinder: V = πr^2h
Convert the volume to weight by multiplying it by the density of steel, which is typically around 7850 kg/m^3
Weight = Volume x Density
Q69. Precautions related to work at height
Precautions for working at heights include proper training, use of fall protection equipment, regular inspection of equipment, and securing tools and materials.
Ensure all workers are properly trained on working at heights and using fall protection equipment
Regularly inspect fall protection equipment for any signs of wear or damage
Secure all tools and materials to prevent them from falling
Use guardrails, safety nets, or personal fall arrest systems when working at heights
Imple...read more
Q70. Telecom system in Indian railways
Indian Railways has a modern telecom system for efficient communication and safety.
Telecom system includes GSM-R, Wi-Fi, and CCTV surveillance.
GSM-R enables communication between train drivers and control centers.
Wi-Fi is available for passengers in select trains and stations.
CCTV surveillance ensures safety and security of passengers and railway property.
Indian Railways is also implementing a Train Collision Avoidance System (TCAS) using telecom technology.
Q71. What's zero liquid discharge?
Zero liquid discharge is a water treatment process that eliminates liquid waste by recovering and reusing all water for industrial purposes.
Water treatment process
Eliminates liquid waste
Recovers and reuses all water
Common in industries like textile, pharmaceutical, and power plants
Q72. What's carbon footprint?
Carbon footprint is the total amount of greenhouse gases produced directly and indirectly by human activities.
It includes emissions from burning fossil fuels for electricity, heat, and transportation.
Factors contributing to carbon footprint include diet, travel habits, and energy consumption.
Reducing carbon footprint involves using renewable energy sources, energy-efficient appliances, and sustainable transportation.
Calculating carbon footprint can help individuals and organi...read more
Q73. Insulators types in psi
Insulators types in psi is not a relevant question for a Stores Officer position.
Q74. Uprights details in size wise
Uprights are available in various sizes depending on the storage requirements.
Uprights are vertical components of a storage system that support the horizontal beams and shelves.
Sizes of uprights vary depending on the height and weight capacity required for the storage system.
Common sizes for uprights include 8 feet, 10 feet, and 12 feet tall.
Uprights can also be customized to fit specific storage needs.
The size of uprights should be chosen based on the weight and size of the ...read more
Q75. Cost of pile per Running metre
Cost of pile per running meter is determined by factors like material, length, diameter, soil conditions, and installation method.
Cost of pile per running meter can vary based on the material used (concrete, steel, timber, etc.)
The length and diameter of the pile will also impact the cost per running meter
Soil conditions at the site can affect the cost as well
The method of installation (driven, drilled, etc.) will also play a role in determining the cost
For example, a concret...read more
Q76. formulae for design calculations.
Formulas are essential for design calculations in formwork engineering.
Formwork pressure calculation: P = γ * h
Formwork design load calculation: W = P * A
Formwork lateral pressure calculation: PL = 0.5 * γ * h^2
Formwork tie spacing calculation: S = L / n
Formwork concrete pressure calculation: Pc = γc * h
Formwork vertical load calculation: V = W + Pc
Q77. What is Track sepration.
Track separation refers to the distance between two parallel tracks in a railway system.
It is important to maintain a safe track separation to prevent collisions between trains.
Track separation can vary depending on the speed and weight of the trains using the tracks.
In the United States, the standard track separation for high-speed rail is 14 feet and 6 inches.
Track separation can also refer to the distance between the centerlines of two adjacent tracks.
Track separation is t...read more
Q78. LIFTING STANDARDS at construction sites.
Lifting standards at construction sites are crucial for preventing injuries and ensuring safety.
Lifting standards should be clearly defined and communicated to all workers on site.
Proper training on safe lifting techniques should be provided to all employees.
Use of mechanical aids such as cranes or forklifts should be encouraged to reduce manual lifting.
Regular inspections should be conducted to ensure compliance with lifting standards.
Implementing a buddy system for heavy li...read more
Q79. Rate of threading dia wise?
Rate of threading varies based on the diameter of the thread.
The rate of threading increases with larger thread diameters.
Smaller thread diameters require slower threading rates to prevent damage.
Factors such as material type and cutting tool also impact threading rate.
For example, a 1/4 inch thread may have a different threading rate than a 1 inch thread.
Q80. Is codes, methods of Execution
Q81. What is spt ?
SPT stands for Standard Penetration Test, a common in-situ test to determine the relative density of granular soils.
SPT involves driving a split-spoon sampler into the ground using a hammer and counting the number of blows required to penetrate the soil a certain depth.
The results of the SPT test are used to assess the soil's strength and stiffness properties for geotechnical engineering purposes.
SPT values are typically used in the design of foundations, retaining walls, and...read more
Q82. El Signalling system working
The El Signalling system is a railway signalling system used in Europe.
The system uses a combination of track circuits and signals to control train movements.
It was first introduced in the early 20th century and has since been updated and modernized.
The system is used in countries such as France, Spain, and Italy.
It allows for efficient and safe train operations on busy railway lines.
The system has faced some criticism for being expensive to install and maintain.
Q83. Various codes used in designing
Various codes are used in designing to ensure safety, quality, and compliance with regulations.
Codes vary depending on the industry and type of design
Examples include ASME Boiler and Pressure Vessel Code for pressure vessels, NFPA 70 for electrical systems, and IBC for building construction
Codes are regularly updated to reflect new technologies and safety standards
Q84. Process of Piling work
Piling work involves driving piles into the ground to provide support for structures.
Piling work starts with site investigation to determine soil conditions
Piles are driven into the ground using various methods such as impact hammers or vibratory hammers
Different types of piles include driven piles, bored piles, and screw piles
Piling work requires careful planning and coordination with other construction activities
Q85. Site commercial roles ?
Site commercial roles refer to positions that involve managing the commercial aspects of a physical location or site.
Responsibilities may include managing sales, marketing, and customer service operations at a specific site
Site commercial roles may also involve managing inventory, logistics, and supply chain operations
Examples of site commercial roles include store managers, site coordinators, and operations managers
These roles require strong leadership, communication, and or...read more
Q86. Method of Cable laying
The method of cable laying refers to the process of installing cables in a structured and efficient manner.
Different methods of cable laying include direct burial, trenching, plowing, and aerial installation.
Direct burial involves burying the cables directly underground, typically in a trench or conduit.
Trenching involves digging a trench and placing the cables inside before covering them with soil.
Plowing is a method where a plow is used to create a narrow trench and simulta...read more
Q87. CAPA after NCR and closer
CAPA (Corrective and Preventive Action) is implemented after Non-Conformance Report (NCR) is issued and closed to prevent recurrence of similar issues.
Identify root cause of NCR
Develop corrective action plan to address root cause
Implement corrective actions
Monitor effectiveness of corrective actions
Develop preventive action plan to prevent recurrence
Implement preventive actions
Verify effectiveness of preventive actions
Q88. Preventive action after NcR
Preventive actions after Non-conformance Report (NCR) are crucial for quality assurance in engineering projects.
Investigate the root cause of the NCR to understand why it occurred
Implement corrective actions to address the root cause and prevent recurrence
Update procedures or processes to prevent similar NCRs in the future
Train personnel on the importance of quality control and how to avoid NCRs
Regularly review and monitor quality control measures to ensure effectiveness
Q89. Types of admixture and mix
Admixtures are materials added to concrete to enhance its properties, while mix refers to the combination of ingredients in concrete.
Admixtures include water-reducing admixtures, air-entraining admixtures, accelerating admixtures, and retarding admixtures.
Mix refers to the combination of cement, water, aggregates, and admixtures in concrete.
Examples of admixtures are plasticizers, superplasticizers, accelerators like calcium chloride, and retarders like sugar or citric acid.
Q90. ANY OPTIMISATION / VALUE ADDED DESIGN
Q91. Details type of using system
Q92. Process of variation
Process of variation involves analyzing and managing changes in a system or process.
Variation refers to the differences or deviations from a standard or expected value.
It is important to identify the sources of variation in order to control and improve processes.
Examples of variation include random fluctuations in measurements, changes in environmental conditions, and human error.
Statistical tools like control charts and process capability analysis are used to monitor and ana...read more
Q93. Full form of pcc
PCC stands for Plain Cement Concrete.
PCC is a construction material made by mixing cement, sand, and aggregate with water.
It is used as a base for flooring, foundations, and other structural elements.
PCC provides a smooth and level surface for further construction work.
Example: PCC is commonly used in constructing pathways and driveways.