I applied via Company Website and was interviewed in Oct 2021. There were 2 interview rounds.
Steel measurement can be taken using various methods depending on the type of steel and the purpose of measurement.
Use a micrometer or caliper to measure the thickness of steel plates or sheets.
Use a tape measure or ruler to measure the length and width of steel bars or pipes.
Use ultrasonic testing to measure the thickness of steel pipes or tanks.
Use X-ray fluorescence (XRF) to measure the chemical composition of steel...
Cost can be calculated by considering all the expenses incurred in the production process.
Identify all the expenses incurred in the production process
Determine the quantity of materials required for production
Calculate the cost of each material
Add the cost of labor and overhead expenses
Determine the profit margin and add it to the total cost
Divide the total cost by the number of units produced to get the cost per unit
Top trending discussions
posted on 20 Nov 2024
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
posted on 17 Oct 2024
I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.
The work nature after agreeing to work involves designing, testing, and implementing electrical systems, troubleshooting issues, and collaborating with team members.
Designing electrical systems based on project requirements
Testing electrical components and systems to ensure functionality
Implementing electrical systems in accordance with safety standards
Troubleshooting electrical issues and providing solutions
Collaborat
I was interviewed in Apr 2024.
I am responsible for ensuring quality control and quality assurance in the construction of the metro project.
Conducting inspections and tests on materials used in construction
Ensuring compliance with project specifications and standards
Identifying and resolving any quality issues that may arise
Collaborating with project managers and contractors to maintain quality standards
Pre casting is a construction method where concrete elements are cast in a different location before being transported to the construction site.
Pre casting helps in ensuring quality control and reducing construction time on site.
Examples include precast concrete panels, beams, and columns.
It allows for better planning and coordination of construction activities.
posted on 21 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
posted on 28 Sep 2023
posted on 28 Dec 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
ATS stands for Automatic Transfer Switch. It is used to transfer power supply between two sources. Transformer and motor maintenance procedures and protection methods are essential for their efficient operation. SAP is a software used for enterprise resource planning.
ATS is used to automatically switch power supply between two sources, ensuring uninterrupted power supply.
Transformer maintenance involves regular inspect...
HT motor rating is the maximum power it can handle and FLC is the current it draws at full load.
HT motor rating is expressed in kilowatts (kW) or megawatts (MW).
FLC of HT motor is the full load current it draws at rated voltage and frequency.
FLC is expressed in amperes (A) and varies depending on the motor's power rating and efficiency.
For example, a 1 MW HT motor may have a FLC of 1000 A at 11 kV.
The rating and FLC of...
Plant EHT system and single line diagram of plants.
EHT system refers to Extra High Tension system used in power plants
Single line diagram shows the electrical connections between different components
It is important to have a clear and accurate diagram for safety and maintenance purposes
posted on 11 Feb 2024
I was interviewed before Feb 2023.
The major parts in a power transformer include the core, windings, insulation, cooling system, and tap changer.
Core: Provides a path for magnetic flux and is usually made of laminated steel sheets.
Windings: Consist of primary and secondary coils that transfer electrical energy.
Insulation: Prevents electrical leakage and ensures safety.
Cooling System: Keeps the transformer within operating temperature limits, commonly u...
I want to switch electrical circuits and devices.
Switching electrical circuits to control the flow of electricity.
Switching electrical devices on or off.
Switching between different power sources.
Switching between different modes or settings of electrical equipment.
Switching between different electrical connections or configurations.
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 4 interview rounds.
Yes, I am well-versed with EHS legal compliance related acts and rules.
I have extensive knowledge of OSHA regulations and guidelines.
I am familiar with EPA regulations related to hazardous waste management.
I have experience in implementing and maintaining compliance programs.
I regularly attend training sessions and seminars to stay up-to-date with the latest regulations.
I have successfully managed compliance audits and
Deputy Manager
572
salaries
| ₹5.4 L/yr - ₹19.2 L/yr |
Assistant Manager
548
salaries
| ₹3.8 L/yr - ₹14 L/yr |
Senior Engineer
472
salaries
| ₹3.5 L/yr - ₹10.6 L/yr |
Manager
287
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Civil Engineer
241
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power