Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Kalpataru Projects International Site Supervisor, Site in Charge and Site Engineer Interview Questions and Answers

Updated 25 Jun 2021

Kalpataru Projects International Site Supervisor, Site in Charge and Site Engineer Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. Technical ponts of water treatment plant
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Interview questions from similar companies

Interview Questionnaire 

3 Questions

  • Q1. BBS full form ?
  • Ans. 

    BBS stands for Bar Bending Schedule.

    • BBS is a document that provides details of reinforcement steel required for a construction project.

    • It includes information about the diameter, length, and shape of each bar, as well as the quantity needed.

    • BBS helps in estimating the cost of reinforcement and ensures proper placement of steel in the structure.

    • It is prepared based on the structural drawings and specifications.

    • BBS is es...

  • Answered by AI
  • Q2. How to check the cement quality?
  • Ans. 

    Cement quality can be checked by performing various tests such as fineness, consistency, setting time, compressive strength, etc.

    • Check the fineness of cement by sieving it through a 90-micron sieve

    • Check the consistency of cement by performing the Vicat apparatus test

    • Check the setting time of cement by performing the initial and final setting time tests

    • Check the compressive strength of cement by preparing mortar cubes a...

  • Answered by AI
  • Q3. Take the cement in hand and Throw cement into bucket fill with water, if the cement flot on water it means it's good for the work...
  • Ans. 

    The cement should sink and not float on water to be good for work.

    • If the cement floats on water, it means it has a high amount of gypsum or lime and is not suitable for construction.

    • Good quality cement should sink and settle at the bottom of the bucket.

    • The test is called the float test and is used to check the quality of cement before use.

    • The test should be done with clean water and the cement should be added slowly to...

  • Answered by AI
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Interview Questionnaire 

1 Question

  • Q1. Questions Site electrical
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Previous experience
  • Q2. Which work completed in your supervision

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your work knowledge
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your experience
  • Q2. What is initial setting time of concrete?
  • Ans. 

    Initial setting time of concrete is the time taken for the concrete to change from a plastic to a solid state.

    • Initial setting time is typically around 30 minutes to 1.5 hours, depending on the mix design and environmental conditions.

    • It is important to monitor the initial setting time to ensure proper placement and finishing of the concrete.

    • Factors affecting initial setting time include temperature, water-cement ratio, ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be confident
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(5 Questions)

  • Q1. Metro project Bumbai
  • Q2. Metro project Bumbai j.kumar
  • Q3. J.kumar metro project
  • Ans. 

    J.kumar metro project is a major infrastructure project involving construction of metro rail system.

    • J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.

    • The project involves various stages such as planning, design, construction, and implementation.

    • It may include tasks like excavation, tunneling, track laying, station construction, etc.

    • The project requires coordination wi...

  • Answered by AI
  • Q4. Site Engineer , metro project
  • Q5. Very good company

Interview Preparation Tips

Topics to prepare for J. Kumar Infraprojects Civil Site Engineer interview:
  • Civil Engineering
  • Site Engineering
  • Site Supervision
Interview preparation tips for other job seekers - Site Engineer
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Structural site questions
  • Q2. Fhinishing questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer for villa stectur work from Shalimar one world
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Aptitude Test 

Exam will be conduct for aptitude test

Round 3 - Technical 

(3 Questions)

  • Q1. Any asked questions my Bulding mteriyal i will attemt given answer your questions
  • Q2. Bulding material any questions
  • Q3. Can u any questions my releted tred

Interview Preparation Tips

Topics to prepare for GMR Group Site Engineer interview:
  • Bulding meterial
Interview preparation tips for other job seekers - A standardized test is a test that is administered and scored in a consistent, or "standard", manner
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - HR 

(4 Questions)

  • Q1. What is your family background?
  • Q2. Share details of your previous job.
  • Q3. What are your strengths and weaknesses?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Pre preparation is must to be an engineer I hope that I will
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. All ques related to your work in current company
  • Q2. About Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Give interview with confidence and be aware for salary negotiation
locked

Unlock now! Rate your last interview experience

If you are a fresher, click here to continue

Contribute & help others!
anonymous
You can choose to be anonymous

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 692 Interviews
Siemens Interview Questions
4.1
 • 421 Interviews
Tata Projects Interview Questions
4.3
 • 398 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
Tata Technologies Interview Questions
3.7
 • 249 Interviews
ABB Interview Questions
4.1
 • 225 Interviews
Saint-Gobain Interview Questions
4.0
 • 169 Interviews
View all
Senior Engineer
613 salaries
unlock blur

₹3.4 L/yr - ₹11 L/yr

Deputy Manager
560 salaries
unlock blur

₹5.4 L/yr - ₹19.5 L/yr

Assistant Manager
508 salaries
unlock blur

₹3.7 L/yr - ₹14.8 L/yr

Manager
277 salaries
unlock blur

₹6.2 L/yr - ₹24 L/yr

Civil Engineer
253 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Sterlite Power

4.0
Compare

Adani Transmission

3.8
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent