I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
PIPE FITTINGS,TYPES OF PIPE
Top trending discussions
posted on 2 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 1 Dec 2021
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Micro planning of construction site involves detailed planning and scheduling of activities to ensure efficient and timely completion of the project.
It involves breaking down the project into smaller tasks and assigning timelines for each task.
It includes identifying the resources required for each task and ensuring their availability.
Micro planning also involves monitoring the progress of each task and making necessar...
The unit weight of 12mm bar depends on the type of steel used.
The unit weight of 12mm bar made of mild steel is 0.89 kg/m
For high tensile steel, the unit weight of 12mm bar is 1.06 kg/m
The density of steel used in the bar also affects the unit weight
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 20 Jul 2017
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Jan 2020. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Deputy Manager
626
salaries
| ₹5.5 L/yr - ₹21 L/yr |
Assistant Manager
609
salaries
| ₹3.7 L/yr - ₹14.6 L/yr |
Senior Engineer
509
salaries
| ₹3.4 L/yr - ₹11.2 L/yr |
Engineer
288
salaries
| ₹2.7 L/yr - ₹8.5 L/yr |
Manager
263
salaries
| ₹6.2 L/yr - ₹26 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures