PIPE FITTINGS,TYPES OF PIPE
Top trending discussions
I have 5 years of experience working as a Pipeline Engineer in the oil and gas industry.
Designed and implemented pipeline systems for transporting oil and gas
Performed regular inspections and maintenance to ensure safety and efficiency
Collaborated with cross-functional teams to troubleshoot and resolve pipeline issues
Utilized software tools for pipeline design and analysis, such as AutoCAD and Pipeline Toolbox
A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.
Identify safety precautions needed for the project
Procure necessary equipment and manpower
Create a timeline for the project
Allocate resources efficiently
Ensure compliance with regulations and standards
Monitor progress and adjust plan as needed
To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.
Calculate the total length of the pipeline
Subtract the length of the two sections already lowered and overlap 5m
Add the length of the two 90 degree LR bends
Divide the result by 2 to get the length of each pup-piece
Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.
Collapse percentage is calculated using the Mohr-Coulomb failure criterion
Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process
Factors such as soil type, borehole diameter, and drilling ...
Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.
Drilling holes in rock using specialized equipment
Placing explosives in the holes and detonating them
Removing the debris using heavy machinery
Measuring the quantity of rock excavated by volume or weight
Using software to calculate the amount of explosives needed for a specific excavation project
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Deputy Manager
569
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Assistant Manager
544
salaries
| ₹3.8 L/yr - ₹16 L/yr |
Senior Engineer
471
salaries
| ₹3.5 L/yr - ₹10.6 L/yr |
Manager
243
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Civil Engineer
241
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power