Upload Button Icon Add office photos

Filter interviews by

Kalpataru Projects International Pipeline Supervisor Interview Questions and Answers

Updated 6 Feb 2024

Kalpataru Projects International Pipeline Supervisor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

PIPE FITTINGS,TYPES OF PIPE

Round 3 - Technical 

(1 Question)

  • Q1. STUDY related questions

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Pipeline and HSC
  • Q2. Store experience
  • Ans. 

    I have 5 years of experience working as a Pipeline Engineer in the oil and gas industry.

    • Designed and implemented pipeline systems for transporting oil and gas

    • Performed regular inspections and maintenance to ensure safety and efficiency

    • Collaborated with cross-functional teams to troubleshoot and resolve pipeline issues

    • Utilized software tools for pipeline design and analysis, such as AutoCAD and Pipeline Toolbox

  • Answered by AI

Interview Questionnaire 

5 Questions

  • Q1. Draw a simple line chart for 10 km action plan with in 10 min ( including all safety precautions , procurement , manpower , equipment's , all )
  • Ans. 

    A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.

    • Identify safety precautions needed for the project

    • Procure necessary equipment and manpower

    • Create a timeline for the project

    • Allocate resources efficiently

    • Ensure compliance with regulations and standards

    • Monitor progress and adjust plan as needed

  • Answered by AI
  • Q2. Calculate pup-piece length for - two section are already lowered and overlap 5m and s- bend rolling ,two 90 degree LR bends for 12 inch pipeline ?
  • Ans. 

    To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.

    • Calculate the total length of the pipeline

    • Subtract the length of the two sections already lowered and overlap 5m

    • Add the length of the two 90 degree LR bends

    • Divide the result by 2 to get the length of each pup-piece

  • Answered by AI
  • Q3. How you calculate collapse and damage percentage for HDD crossings ?
  • Ans. 

    Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.

    • Collapse percentage is calculated using the Mohr-Coulomb failure criterion

    • Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process

    • Factors such as soil type, borehole diameter, and drilling ...

  • Answered by AI
  • Q4. What is methodology for rock excavation and how to measure the quantity?
  • Ans. 

    Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.

    • Drilling holes in rock using specialized equipment

    • Placing explosives in the holes and detonating them

    • Removing the debris using heavy machinery

    • Measuring the quantity of rock excavated by volume or weight

    • Using software to calculate the amount of explosives needed for a specific excavation project

  • Answered by AI
  • Q5. In Radiography Interpretation at 30 segment position seems like a crake , but you dint find in UT test how you solve this situation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Pipeline field is full of stress and based on will power management at site fields activities , apart from technical questions have to test his stress handling ,planning and site management .And also confirm that candidate is suitable for pipeline based on his will power and how passionate in pipeline field he can fulfill his responsibilities of any critical situations and targets.

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International Pipeline Supervisor interview?
Kalpataru Projects International interview process usually has 3 rounds. The most common rounds in the Kalpataru Projects International interview process are Resume Shortlist, Case Study and Technical.

Tell us how to improve this page.

Kalpataru Projects International Pipeline Supervisor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 735 Interviews
Siemens Interview Questions
4.1
 • 429 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
KEC International Interview Questions
4.1
 • 295 Interviews
Tata Technologies Interview Questions
3.6
 • 257 Interviews
ABB Interview Questions
4.1
 • 230 Interviews
View all
Kalpataru Projects International Pipeline Supervisor Salary
based on 4 salaries
₹2.4 L/yr - ₹6 L/yr
11% more than the average Pipeline Supervisor Salary in India
View more details

Kalpataru Projects International Pipeline Supervisor Reviews and Ratings

based on 2 reviews

4.7/5

Rating in categories

3.2

Skill development

3.8

Work-life balance

4.7

Salary

4.0

Job security

3.6

Company culture

3.2

Promotions

4.7

Work satisfaction

Explore 2 Reviews and Ratings
Deputy Manager
569 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Assistant Manager
544 salaries
unlock blur

₹3.8 L/yr - ₹16 L/yr

Senior Engineer
471 salaries
unlock blur

₹3.5 L/yr - ₹10.6 L/yr

Manager
243 salaries
unlock blur

₹6.2 L/yr - ₹24 L/yr

Civil Engineer
241 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Sterlite Power

4.0
Compare

Adani Transmission

3.7
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview