Kalpataru Group
Mannat Group of Hotels Interview Questions and Answers
Q1. How much accepted 8mm to 10mm steel rod rolling margine value ?
The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.
The accepted rolling margin value can range from 2% to 5%.
It is important to consult project specifications and industry guidelines for the specific rolling margin value.
For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10.3mm.
The rolling margin value ensures that the steel rods ...read more
Q2. Aluminium (mivan) structure sequence of activities?
The sequence of activities for aluminium (mivan) structure construction involves several steps.
Preparing the site and marking the layout
Constructing the foundation and footings
Erecting the aluminium formwork panels
Fixing reinforcement bars and embedment items
Pouring concrete into the formwork
Curing the concrete
Stripping the formwork
Finishing and cleaning the structure
Q3. Unit Weight of Steel?
The unit weight of steel refers to the weight of a given volume of steel material.
The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.
The specific unit weight of steel can vary depending on the type and grade of steel being used.
For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.
The unit weight of reinforcing steel bars, commonly known as rebars, is typically a...read more
Q4. Water proofing ponding test hours?
Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.
Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.
The test involves subjecting the waterproofing system to a specified water depth for a certain duration.
The duration of the test can vary depending on the project requirements and industry standards.
The test helps evaluat...read more
Q5. Finishing worksequence of activities?
The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.
Inspecting and correcting any defects or deficiencies
Installing finishes such as flooring, paint, and fixtures
Completing final electrical and plumbing work
Cleaning and tidying up the site
Obtaining necessary permits and certifications
Conducting final inspections
Handing over the completed project to the client
Q6. Lapping zone in columns & beams
Lapping zone in columns & beams refers to the overlapping area where two reinforcement bars are spliced together.
Lapping zone is typically located at the mid-height of the column or beam.
It is important to ensure proper lapping length and overlap to maintain structural integrity.
Lapping zone should be free from rust, oil, grease, or any other contaminants.
Proper anchorage length should be provided to prevent failure at the lapping zone.
Example: In a reinforced concrete column...read more
Q7. Cutting length of beam
Cutting length of a beam is the total length of the beam including the extra length required for bending and overlapping reinforcement.
Cutting length is calculated by adding the clear span of the beam to the development length of the reinforcement on both sides.
Extra length is added for bending and overlapping reinforcement to ensure proper strength and stability.
Proper calculation of cutting length is crucial for the structural integrity of the beam.
Example: If the clear spa...read more