Q1. How much accepted 8mm to 10mm steel rod rolling margine value ?

Ans.

The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.

  • The accepted rolling margin value can range from 2% to 5%.

  • It is important to consult project specifications and industry guidelines for the specific rolling margin value.

  • For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10.3mm.

  • The rolling margin value ensures that the steel rods ...read more

View 9 more answers

Q2. Aluminium (mivan) structure sequence of activities?

Ans.

The sequence of activities for aluminium (mivan) structure construction involves several steps.

  • Preparing the site and marking the layout

  • Constructing the foundation and footings

  • Erecting the aluminium formwork panels

  • Fixing reinforcement bars and embedment items

  • Pouring concrete into the formwork

  • Curing the concrete

  • Stripping the formwork

  • Finishing and cleaning the structure

View 4 more answers

Q3. Unit Weight of Steel?

Ans.

The unit weight of steel refers to the weight of a given volume of steel material.

  • The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.

  • The specific unit weight of steel can vary depending on the type and grade of steel being used.

  • For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.

  • The unit weight of reinforcing steel bars, commonly known as rebars, is typically a...read more

View 3 more answers

Q4. Water proofing ponding test hours?

Ans.

Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.

  • Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.

  • The test involves subjecting the waterproofing system to a specified water depth for a certain duration.

  • The duration of the test can vary depending on the project requirements and industry standards.

  • The test helps evaluat...read more

View 2 more answers
Discover Mannat Group of Hotels interview dos and don'ts from real experiences

Q5. Finishing worksequence of activities?

Ans.

The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.

  • Inspecting and correcting any defects or deficiencies

  • Installing finishes such as flooring, paint, and fixtures

  • Completing final electrical and plumbing work

  • Cleaning and tidying up the site

  • Obtaining necessary permits and certifications

  • Conducting final inspections

  • Handing over the completed project to the client

View 1 answer

Q6. Lapping zone in columns & beams

Ans.

Lapping zone in columns & beams refers to the overlapping area where two reinforcement bars are spliced together.

  • Lapping zone is typically located at the mid-height of the column or beam.

  • It is important to ensure proper lapping length and overlap to maintain structural integrity.

  • Lapping zone should be free from rust, oil, grease, or any other contaminants.

  • Proper anchorage length should be provided to prevent failure at the lapping zone.

  • Example: In a reinforced concrete column...read more

Add your answer

Q7. Cutting length of beam

Ans.

Cutting length of a beam is the total length of the beam including the extra length required for bending and overlapping reinforcement.

  • Cutting length is calculated by adding the clear span of the beam to the development length of the reinforcement on both sides.

  • Extra length is added for bending and overlapping reinforcement to ensure proper strength and stability.

  • Proper calculation of cutting length is crucial for the structural integrity of the beam.

  • Example: If the clear spa...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Senior Civil Engineer Interview Questions from Similar Companies

4.0
 • 10 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter