I was interviewed before May 2016.
I am a recent graduate with a degree in Marketing and a passion for digital media. I have experience in social media management and content creation.
Recent graduate with a degree in Marketing
Passionate about digital media
Experience in social media management and content creation
I was interviewed in Jan 2017.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
I have been actively involved in sports since childhood, participating in various team sports and individual activities.
Played soccer for 10 years, competing at a regional level
Participated in track and field events in high school, specializing in long jump and hurdles
Currently enjoy hiking and rock climbing in my free time
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.
Hi
I applied via Naukri.com and was interviewed before Nov 2021. There were 4 interview rounds.
I was interviewed in Sep 2020.
I applied via Campus Placement and was interviewed before Feb 2023. There were 3 interview rounds.
Scope of Renewable energy in India
Current is the flow of electric charge in a circuit.
Current is measured in Amperes (A).
It is the rate of flow of electric charge through a conductor.
Current flows from the positive terminal to the negative terminal in a circuit.
There are two types of current - direct current (DC) and alternating current (AC).
Conductors diameter can be calculated using the formula: diameter = sqrt((4 * area) / pi)
Calculate the area of the conductor (usually circular) using the formula: area = pi * (radius^2)
Determine the radius of the conductor
Use the formula: diameter = sqrt((4 * area) / pi) to calculate the diameter
I applied via Campus Placement and was interviewed before Nov 2022. There were 3 interview rounds.
Any topic such as bullet train, race, education, GSt etc
The ratio of cement, sand, and aggregate in M20 concrete is 1:1.5:3.
The ratio of cement to sand to aggregate is 1:1.5:3 in M20 concrete.
For every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used.
This ratio ensures the desired strength and workability of the concrete mix.
based on 31 reviews
Rating in categories
Assistant Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Green Energy
Tata Power
NTPC
Suzlon Group