Filter interviews by
I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
Low width of coil can affect performance, increasing it can improve efficiency.
Low coil width can lead to poor heat transfer and reduced efficiency
Increasing coil width can improve heat transfer and increase efficiency
Factors such as space constraints and cost may limit the ability to increase coil width
Heat variation in HF plant can be controlled through various methods.
Maintaining proper insulation in the plant
Using heat exchangers to transfer heat from one process to another
Implementing a control system to monitor and adjust temperature
Regular maintenance and cleaning of equipment to prevent heat buildup
Using cooling towers or water sprays to reduce temperature
Optimizing the plant layout to minimize heat transfer b
Improper rolls elongation can cause waveness in pipes during production.
Rolls elongation is the process of stretching the metal sheet to the desired thickness.
If the elongation is not proper, it can cause uneven thickness and waveness in the pipes.
This can lead to defects in the final product and affect its performance.
Proper calibration and maintenance of the rolling equipment can prevent this issue.
Regular inspection...
I was interviewed in Aug 2024.
Utilize budgeting, design, planning, and scheduling tools to mitigate crises and ensure compliance with budget control.
Utilize project management software for budgeting, design, planning, and scheduling.
Regularly monitor budget control and adjust strategies as needed.
Implement risk management techniques to mitigate crises.
Collaborate with stakeholders to ensure alignment with budget and project goals.
Use historical dat...
Motivating man power at the workplace involves recognizing and rewarding employees, providing opportunities for growth and development, and fostering a positive work environment.
Recognize and reward employees for their hard work and achievements
Provide opportunities for growth and development through training programs and career advancement
Foster a positive work environment by promoting open communication, teamwork, an...
posted on 28 Jul 2024
Implemented new performance management system resulting in 20% increase in employee productivity
Implemented new performance management system
Achieved 20% increase in employee productivity
Streamlined HR processes for better efficiency
JSW Group interview questions for popular designations
I applied via Company Website
Add your introduction
Get interview-ready with Top JSW Group Interview Questions
I was interviewed in Aug 2024.
I have 7 years of work experience in project management.
Managed multiple projects simultaneously
Led cross-functional teams to successful project completion
Implemented project management best practices
Developed and monitored project timelines and budgets
Communicated effectively with stakeholders
I was interviewed before Oct 2021.
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
The process of production involves transforming raw materials into finished products through various stages.
Identifying raw materials needed for production
Designing the production process
Manufacturing the product
Quality control checks
Packaging and distribution
Continuous improvement of production process
The final production process involves the last steps in manufacturing a product before it is ready for distribution.
Final inspection and quality control checks are conducted to ensure the product meets specifications.
Packaging and labeling are completed to prepare the product for shipping.
Any necessary finishing touches or assembly steps are done to complete the product.
Documentation and record-keeping are finalized to...
I applied via Approached by Company and was interviewed in Jun 2024. There were 2 interview rounds.
I applied via Company Website and was interviewed in Oct 2024. There was 1 interview round.
I am a Civil Engineer specializing in structural engineering.
Specialize in designing and analyzing structures such as buildings, bridges, and dams
Knowledge of materials and construction techniques
Experience with software like AutoCAD and SAP2000
I applied via Approached by Company and was interviewed in Jun 2024. There were 3 interview rounds.
General questions related to job profile
Top trending discussions
The duration of JSW Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 108 interviews
Interview experience
based on 703 reviews
Rating in categories
10-15 Yrs
Not Disclosed
Assistant Manager
259
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer Trainee (Get)
166
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
120
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
74
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Adani Group
Reliance Industries
Bharti Enterprises