Filter interviews by
The volume of tonnage under service refers to the amount of weight being handled by the company's services.
The volume of tonnage under service can be measured in various units such as metric tons, pounds, or kilograms.
It is important to track the volume of tonnage under service to ensure that the company's resources are being utilized efficiently.
The volume of tonnage under service can be affected by factors such as se...
I handle a wide range of products including electronics, home appliances, and personal care items.
Electronics such as smartphones, laptops, and gaming consoles
Home appliances like refrigerators, washing machines, and air conditioners
Personal care items including hair care, skincare, and grooming products
Refrigeration cycle and technical factors are crucial in air conditioning machines.
The refrigeration cycle involves four main components: compressor, condenser, expansion valve, and evaporator.
Technical factors include proper sizing of the unit, correct refrigerant charge, and adequate airflow.
Efficiency can be improved by using variable speed compressors and fans, and by implementing smart controls.
Regular maintenance...
I applied via LinkedIn and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Sep 2022. There were 4 interview rounds.
What is a data structure?
What is an array?
What is a linked list?
I applied via campus placement at Board of Technical Education (BTE) and was interviewed in Apr 2021. There was 1 interview round.
Johnson Controls Hitachi Air Conditioning interview questions for popular designations
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
In-process defect controls & prevention of outflow
Implement quality control measures at each stage of production
Train employees on identifying and addressing defects
Regularly monitor and analyze production data to identify trends
Implement corrective actions to prevent recurrence of defects
Conduct regular audits to ensure compliance with quality standards
Use statistical process control techniques to identify and address...
I use various tools depending on the nature of the problem, such as Fishbone diagram, Pareto chart, and 5 Whys.
I analyze the problem using Fishbone diagram to identify the root cause
I use Pareto chart to prioritize the problems based on their impact
I apply 5 Whys technique to dig deeper into the problem and find the underlying cause
I also use statistical tools like Control charts and Histograms to analyze data
I select ...
Get interview-ready with Top Johnson Controls Hitachi Air Conditioning Interview Questions
I applied via Referral and was interviewed before May 2021. There were 2 interview rounds.
I was interviewed in Aug 2024.
VCR cycle is a technology that allows the compression ratio of an engine to be varied for optimal performance and efficiency.
VCR cycle adjusts the compression ratio of an engine based on operating conditions.
It can improve fuel efficiency and power output of the engine.
Examples of VCR systems include Mazda's Skyactiv-X engine and Infiniti's VC-Turbo engine.
An expansion valve is a device in a refrigeration system that controls the flow of refrigerant into the evaporator.
Regulates the flow of refrigerant into the evaporator to maintain proper temperature and pressure
Helps in converting high-pressure liquid refrigerant into low-pressure liquid-vapor mixture
Controls the superheat in the evaporator to ensure efficient cooling
Examples include thermostatic expansion valves (TXV
I have knowledge about HVAC industry including principles of heating, ventilation, and air conditioning systems.
Understanding of HVAC systems and components such as boilers, chillers, air handlers, and ductwork
Knowledge of HVAC design principles and calculations for heating and cooling loads
Familiarity with HVAC codes and standards like ASHRAE and building regulations
Experience with HVAC troubleshooting and maintenance...
I completed multiple projects during my college experience, including a smart irrigation system and a mobile app for waste management.
Developed a smart irrigation system using Arduino and sensors to optimize water usage in agriculture
Created a mobile app for waste management to track waste collection schedules and promote recycling
Collaborated with a team to design and implement a solar-powered car for a national compe
I come from a close-knit family of four with supportive parents and a younger sibling.
Family of four
Supportive parents
Close-knit
Younger sibling
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for career growth and new experiences.
I understand that relocation may be necessary for certain job opportunities.
I am flexible and adaptable to new environments and challenges.
Top trending discussions
The duration of Johnson Controls Hitachi Air Conditioning interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 16 interviews
Interview experience
based on 329 reviews
Rating in categories
9-11 Yrs
Not Disclosed
10-12 Yrs
Not Disclosed
10-12 Yrs
Not Disclosed
Assistant Manager
140
salaries
| ₹6 L/yr - ₹17.7 L/yr |
Senior Executive
114
salaries
| ₹4.2 L/yr - ₹13 L/yr |
Manager
64
salaries
| ₹9.4 L/yr - ₹22 L/yr |
Area Service Manager
27
salaries
| ₹3 L/yr - ₹10.5 L/yr |
Executive
26
salaries
| ₹4.7 L/yr - ₹9 L/yr |
Daikin
Blue Star
Voltas
Mitsubishi Electric