Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.
The frequency of cube casting and testing is determined by the project specifications and quality control requirements.
In general, cube casting and testing may be done at regular intervals during the construction process.
For example, in a large construction project, cube casting and testing may be d...
Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.
Rate analysis helps in estimating the total cost of a construction project.
It involves breaking down the project into various activities and determining the cost of each activity.
Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...
Sieve analysis & Sieve Size
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Seeking new challenges and opportunities for growth in a different environment.
Desire for career advancement
Seeking new challenges
Opportunity for growth
Change in work environment
Acceptance criteria of cube includes dimensions, material, weight, and quality standards.
Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)
Material should be durable and suitable for intended use (e.g. plastic, wood, metal)
Weight should be within acceptable range based on material and size
Quality standards must be met in terms of finish, edges, and overall construction
Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.
Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.
For example, timber formwork may require longer stripping time compared to steel formwork.
In hot weather, concrete may set faster, reducing the stripping time.
Proper curing can also affec...
Code 1200 is not specifically for billing purposes.
Code 1200 is typically used in reference to a specific task or action, not billing.
It could be related to a specific product, service, or process within a company.
For example, code 1200 might indicate a specific troubleshooting step in a technical manual.
Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.
Manpower output for shuttering can range from 10-20 sqm per day depending on complexity
Steelwork output can vary from 50-100 kg per worker per day
Blockwork output can range from 50-100 blocks per worker per day
Plastering output can vary from 10-20 sqm per worker per day
Fact...
Top trending discussions
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
The rating of a transformer is in kVA and the current can be found using the formula: Current (A) = kVA / (1.732 x Voltage)
Transformer rating is in kVA (kilo-volt-ampere)
To find the current in a transformer, use the formula: Current (A) = kVA / (1.732 x Voltage)
For example, if a transformer has a rating of 100 kVA and operates at 480V, the current would be 100 / (1.732 x 480) = 120.7A
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
posted on 14 Jan 2022
I applied via Walk-in and was interviewed before Jan 2021. There were 3 interview rounds.
The least count of staff reading is the smallest measurement that can be read and recorded using the staff.
The least count is determined by the smallest division on the staff scale.
It is usually expressed in millimeters or centimeters.
For example, if the smallest division on the staff scale is 1 mm, then the least count is 1 mm.
The least count is important in accurately measuring and recording distances in civil engine...
I worked as a civil engineer focusing on infrastructure projects, managing teams, and ensuring compliance with safety standards.
Led a team of engineers in the design and construction of a new bridge, improving traffic flow by 30%.
Managed a $2 million road rehabilitation project, completing it 10% under budget and ahead of schedule.
Conducted site inspections to ensure compliance with local regulations and safety standar...
based on 2 interview experiences
Difficulty level
Duration
based on 15 reviews
Rating in categories
Design Engineer
278
salaries
| ₹7.9 L/yr - ₹15 L/yr |
Senior Design Engineer
162
salaries
| ₹13 L/yr - ₹22.5 L/yr |
Piping Design Engineer
109
salaries
| ₹6.6 L/yr - ₹14.2 L/yr |
Piping Designer
98
salaries
| ₹4.9 L/yr - ₹12.8 L/yr |
Lead Engineer
84
salaries
| ₹20 L/yr - ₹34 L/yr |
L&T Construction
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation