Upload Button Icon Add office photos

Filter interviews by

Power Mech Projects Field Engineer Interview Questions and Answers

Updated 13 Sep 2021

Power Mech Projects Field Engineer Interview Experiences

1 interview found

Interview Questionnaire 

2 Questions

  • Q1. About my designation.
  • Q2. Which department will give you, for learning new things.

Interview Preparation Tips

Interview preparation tips for other job seekers - Since my collage days I have much interested in power plant engineering, the interviewer asked so many questions on power plant related only so iam able to attend maximum questions. They check my communication skill and both Hindi and English language is must and should for communicating with workers and officers. So my technical knowledge about power plant and communication are helps to clear my interview.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Self introduction about your work experience
  • Ans. 

    I have 5 years of experience as a Field Engineer in the telecommunications industry.

    • Managed and maintained network infrastructure for multiple clients

    • Performed site surveys and installations of equipment

    • Troubleshot and resolved network issues

    • Provided technical support and training to customers

    • Collaborated with cross-functional teams to ensure project success

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Structure design and site execution work details planning billing work details

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your technical skills and experience about your work experience and documentation
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Frequency of cube casting & testing per cubic meter
  • Ans. 

    The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.

    • The frequency of cube casting and testing is determined by the project specifications and quality control requirements.

    • In general, cube casting and testing may be done at regular intervals during the construction process.

    • For example, in a large construction project, cube casting and testing may be d...

  • Answered by AI
  • Q2. PEB structure Erection process
  • Q3. Rate analysis of each items of construction
  • Ans. 

    Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.

    • Rate analysis helps in estimating the total cost of a construction project.

    • It involves breaking down the project into various activities and determining the cost of each activity.

    • Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...

  • Answered by AI
  • Q4. Testing of concrete, sieve analysis fine aggregates, course aggregates
  • Q5. Tremix flooring process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be relaxed & confident during interview

I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. About experience on FTTH
  • Q2. Fiber optic power level
  • Ans. 

    Fiber optic power level refers to the strength of the optical signal transmitted through the fiber optic cable.

    • Fiber optic power level is measured in decibels (dB)

    • It is important to maintain the correct power level to ensure optimal performance and prevent damage to the equipment

    • Power level can be affected by factors such as distance, attenuation, and dispersion

    • Power meters and optical time-domain reflectometers (OTDRs

  • Answered by AI
  • Q3. Equipment related and repair
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and explanations

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your own and on your own and try to cool
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Boiler & turbine lightup procedure
  • Ans. 

    Boiler and turbine lightup procedure involves several steps to ensure safe and efficient operation.

    • Check and verify all safety interlocks and alarms

    • Purge the boiler and turbine of any air or gas

    • Start the auxiliary systems such as pumps and fans

    • Gradually increase the temperature and pressure

    • Monitor and adjust the combustion process

    • Ensure all parameters are within safe operating limits

    • Once stable operation is achieved, s

  • Answered by AI
  • Q2. Turbine high pressure heater bypass systems

Interview Preparation Tips

Interview preparation tips for other job seekers - GOO policy and salary and living & school arrangement
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. All about your resume .
  • Q2. Why you want to change job
  • Ans. 

    Seeking new challenges and opportunities for growth in a different environment.

    • Desire for career advancement

    • Seeking new challenges

    • Opportunity for growth

    • Change in work environment

  • Answered by AI
  • Q3. Reloaction related
  • Q4. Work experience and my past companies job responsbility
Round 2 - Technical 

(10 Questions)

  • Q1. Questions from Is code 456
  • Q2. Acceptance criteria of cube
  • Ans. 

    Acceptance criteria of cube includes dimensions, material, weight, and quality standards.

    • Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)

    • Material should be durable and suitable for intended use (e.g. plastic, wood, metal)

    • Weight should be within acceptable range based on material and size

    • Quality standards must be met in terms of finish, edges, and overall construction

  • Answered by AI
  • Q3. Colomn cover tolerance
  • Q4. Stripping time of shutterings
  • Ans. 

    Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.

    • Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.

    • For example, timber formwork may require longer stripping time compared to steel formwork.

    • In hot weather, concrete may set faster, reducing the stripping time.

    • Proper curing can also affec...

  • Answered by AI
  • Q5. Construction Materials and there site test
  • Q6. Design mix questions
  • Q7. Quality related questions of concrete
  • Q8. Is code 1200 for billing purpose
  • Ans. 

    Code 1200 is not specifically for billing purposes.

    • Code 1200 is typically used in reference to a specific task or action, not billing.

    • It could be related to a specific product, service, or process within a company.

    • For example, code 1200 might indicate a specific troubleshooting step in a technical manual.

  • Answered by AI
  • Q9. Manpower output for works like shuttering,steel,blockwork,plaster etc
  • Ans. 

    Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.

    • Manpower output for shuttering can range from 10-20 sqm per day depending on complexity

    • Steelwork output can vary from 50-100 kg per worker per day

    • Blockwork output can range from 50-100 blocks per worker per day

    • Plastering output can vary from 10-20 sqm per worker per day

    • Fact...

  • Answered by AI
  • Q10. Last question was about my salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever the work you are doing you have to deep knowledege about there tests, codes, etc and focus on is codes like 456 ,1200

I applied via Walk-in and was interviewed in Nov 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. About myself and my studies
  • Q2. About family and about work ahead

Interview Preparation Tips

Interview preparation tips for other job seekers - about yourself and what you used to do before and what to do next
Round 1 - One-on-one 

(1 Question)

  • Q1. Basic mechanical engineering questions were asked.

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare the basic engineering questions
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Frequency of cube casting & testing per cubic meter
  • Ans. 

    The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.

    • The frequency of cube casting and testing is determined by the project specifications and quality control requirements.

    • In general, cube casting and testing may be done at regular intervals during the construction process.

    • For example, in a large construction project, cube casting and testing may be d...

  • Answered by AI
  • Q2. PEB structure Erection process
  • Q3. Rate analysis of each items of construction
  • Ans. 

    Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.

    • Rate analysis helps in estimating the total cost of a construction project.

    • It involves breaking down the project into various activities and determining the cost of each activity.

    • Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...

  • Answered by AI
  • Q4. Testing of concrete, sieve analysis fine aggregates, course aggregates
  • Q5. Tremix flooring process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be relaxed & confident during interview

I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. About experience on FTTH
  • Q2. Fiber optic power level
  • Ans. 

    Fiber optic power level refers to the strength of the optical signal transmitted through the fiber optic cable.

    • Fiber optic power level is measured in decibels (dB)

    • It is important to maintain the correct power level to ensure optimal performance and prevent damage to the equipment

    • Power level can be affected by factors such as distance, attenuation, and dispersion

    • Power meters and optical time-domain reflectometers (OTDRs

  • Answered by AI
  • Q3. Equipment related and repair
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and explanations

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your own and on your own and try to cool

Tell us how to improve this page.

Power Mech Projects Field Engineer Salary
based on 88 salaries
₹2.3 L/yr - ₹5 L/yr
At par with the average Field Engineer Salary in India
View more details

Power Mech Projects Field Engineer Reviews and Ratings

based on 15 reviews

3.6/5

Rating in categories

2.7

Skill development

2.9

Work-life balance

2.6

Salary

3.6

Job security

3.0

Company culture

2.2

Promotions

2.8

Work satisfaction

Explore 15 Reviews and Ratings
Senior Engineer
411 salaries
unlock blur

₹3 L/yr - ₹8.4 L/yr

Assistant Manager
281 salaries
unlock blur

₹4.1 L/yr - ₹10 L/yr

Engineer
273 salaries
unlock blur

₹2 L/yr - ₹6.9 L/yr

Mechanical Engineer
243 salaries
unlock blur

₹1.9 L/yr - ₹8 L/yr

Electrical Engineer
223 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Explore more salaries
Compare Power Mech Projects with

Thermax Limited

4.2
Compare

BGR Energy Systems

3.7
Compare

Larsen & Toubro Limited

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview