Filter interviews by
Top trending discussions
I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.
I have 5 years of experience as a Field Engineer in the telecommunications industry.
Managed and maintained network infrastructure for multiple clients
Performed site surveys and installations of equipment
Troubleshot and resolved network issues
Provided technical support and training to customers
Collaborated with cross-functional teams to ensure project success
posted on 30 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.
The frequency of cube casting and testing is determined by the project specifications and quality control requirements.
In general, cube casting and testing may be done at regular intervals during the construction process.
For example, in a large construction project, cube casting and testing may be d...
Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.
Rate analysis helps in estimating the total cost of a construction project.
It involves breaking down the project into various activities and determining the cost of each activity.
Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...
posted on 30 Aug 2022
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
Fiber optic power level refers to the strength of the optical signal transmitted through the fiber optic cable.
Fiber optic power level is measured in decibels (dB)
It is important to maintain the correct power level to ensure optimal performance and prevent damage to the equipment
Power level can be affected by factors such as distance, attenuation, and dispersion
Power meters and optical time-domain reflectometers (OTDRs
Boiler and turbine lightup procedure involves several steps to ensure safe and efficient operation.
Check and verify all safety interlocks and alarms
Purge the boiler and turbine of any air or gas
Start the auxiliary systems such as pumps and fans
Gradually increase the temperature and pressure
Monitor and adjust the combustion process
Ensure all parameters are within safe operating limits
Once stable operation is achieved, s
posted on 26 Aug 2024
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Seeking new challenges and opportunities for growth in a different environment.
Desire for career advancement
Seeking new challenges
Opportunity for growth
Change in work environment
Acceptance criteria of cube includes dimensions, material, weight, and quality standards.
Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)
Material should be durable and suitable for intended use (e.g. plastic, wood, metal)
Weight should be within acceptable range based on material and size
Quality standards must be met in terms of finish, edges, and overall construction
Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.
Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.
For example, timber formwork may require longer stripping time compared to steel formwork.
In hot weather, concrete may set faster, reducing the stripping time.
Proper curing can also affec...
Code 1200 is not specifically for billing purposes.
Code 1200 is typically used in reference to a specific task or action, not billing.
It could be related to a specific product, service, or process within a company.
For example, code 1200 might indicate a specific troubleshooting step in a technical manual.
Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.
Manpower output for shuttering can range from 10-20 sqm per day depending on complexity
Steelwork output can vary from 50-100 kg per worker per day
Blockwork output can range from 50-100 blocks per worker per day
Plastering output can vary from 10-20 sqm per worker per day
Fact...
posted on 18 Dec 2022
I applied via Walk-in and was interviewed in Nov 2022. There was 1 interview round.
posted on 30 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
The frequency of cube casting and testing per cubic meter varies depending on the project requirements and specifications.
The frequency of cube casting and testing is determined by the project specifications and quality control requirements.
In general, cube casting and testing may be done at regular intervals during the construction process.
For example, in a large construction project, cube casting and testing may be d...
Rate analysis of each item of construction involves determining the cost of materials, labor, and equipment for each construction activity.
Rate analysis helps in estimating the total cost of a construction project.
It involves breaking down the project into various activities and determining the cost of each activity.
Factors considered in rate analysis include material costs, labor costs, equipment costs, and overhead c...
posted on 30 Aug 2022
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
Fiber optic power level refers to the strength of the optical signal transmitted through the fiber optic cable.
Fiber optic power level is measured in decibels (dB)
It is important to maintain the correct power level to ensure optimal performance and prevent damage to the equipment
Power level can be affected by factors such as distance, attenuation, and dispersion
Power meters and optical time-domain reflectometers (OTDRs
based on 15 reviews
Rating in categories
Senior Engineer
411
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Assistant Manager
281
salaries
| ₹4.1 L/yr - ₹10 L/yr |
Engineer
273
salaries
| ₹2 L/yr - ₹6.9 L/yr |
Mechanical Engineer
243
salaries
| ₹1.9 L/yr - ₹8 L/yr |
Electrical Engineer
223
salaries
| ₹2 L/yr - ₹7 L/yr |
Thermax Limited
BGR Energy Systems
Larsen & Toubro Limited
Kalpataru Projects International