J. Kumar Infraprojects Interview Questions, Process, and Tips for Experienced

Updated 28 Feb 2025

Top J. Kumar Infraprojects Interview Questions and Answers for Experienced

View all 40 questions

J. Kumar Infraprojects Interview Experiences for Experienced

Popular Designations

42 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How define one way slab?
  • Ans. 

    One way slab is a type of slab which is supported by beams on two opposite sides only.

    • One way slab is designed to span in one direction only

    • It is supported by beams on two opposite sides

    • Commonly used in buildings with rectangular layout

    • Examples include slabs in residential buildings, offices, and commercial spaces

  • Answered by AI
  • Q2. Stresing calculation how to do?
  • Ans. 

    Stressing calculation involves determining the internal forces acting on a structure and analyzing their effects.

    • Calculate the external loads acting on the structure

    • Determine the support reactions at the foundation

    • Analyze the internal forces using methods like the method of joints or sections

    • Calculate the stresses in the structural members based on the internal forces

    • Consider factors like material properties and safety

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is weight of 32 mm diameter bar?
  • Ans. 

    The weight of a 32 mm diameter bar can be calculated using the formula for the weight of a round bar.

    • Calculate the cross-sectional area of the bar using the formula A = πr^2, where r is the radius (diameter/2)

    • Determine the weight of the bar using the formula Weight = Volume x Density, where Volume = A x Length and Density is the density of the material

    • For example, for a steel bar with a density of 7850 kg/m^3 and a len...

  • Answered by AI
  • Q2. Define LD?
  • Ans. 

    LD stands for Line of Development, which is a line connecting the points of intersection of the ground surface and the tunnel axis.

    • LD is used in tunneling projects to determine the alignment of the tunnel with respect to the ground surface.

    • It helps in ensuring that the tunnel is constructed in the desired direction and at the correct depth.

    • LD is crucial for maintaining the stability and structural integrity of the tunn...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Goog attitude for work , dedication for excellent work planing before start a day complete the task as per plan.
Work with according plan.

B E Civil Engineer Interview Questions asked at other Companies

Q1. What do you mean by bent up bars Formula for calculating steel. Different formulas relating to civil engineering
View answer (1)

Asst Store Interview Questions & Answers

user image Anonymous

posted on 30 Jan 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Group Discussion 

About materials knowledge,like Shuttering,mivan,mep, finishing etc.

Round 2 - One-on-one 

(2 Questions)

  • Q1. Five shuttering materials name ?
  • Ans. 

    Shuttering materials are used in construction to support the concrete until it sets. Five common materials include plywood, steel, timber, plastic, and aluminum.

    • Plywood: commonly used due to its strength and flexibility

    • Steel: provides strong support for heavy concrete loads

    • Timber: traditional material that is cost-effective and easy to work with

    • Plastic: lightweight and easy to clean, often used for smaller projects

    • Alum...

  • Answered by AI
  • Q2. 5 Electrical materials name ?
  • Ans. 

    Electrical materials are essential components used in electrical systems for conducting electricity.

    • Copper wire

    • Insulation tape

    • Switches

    • Circuit breakers

    • Light bulbs

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Shuttering Oil,Grease, Plywood, Pinewood, Foam sheet etc. Ledger, Vertical,U Head Jack, Base Jack.

Asst Store Interview Questions asked at other Companies

Q1. What is the process of issuing material in your company?
View answer (5)

Electrician Interview Questions & Answers

user image Anonymous

posted on 9 Dec 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Machinery cable
  • Q2. Switches and working switches
  • Q3. Cable and swithes
  • Q4. Machinery working
  • Q5. Cable and swithes load

Electrician Interview Questions asked at other Companies

Q1. 1. How much current takes a 5hp motor ?, 2. Draw a STAR DELTA and DOL starter control wireing. 3. How to connect star connection, and DELTA connectin. 4. What is the kw of 30hp motor ?, 5. Can you connect a temperature controller ?, 6. What... read more
View answer (5)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. How much type of lifting crane
  • Ans. 

    There are several types of lifting cranes used in various industries.

    • Mobile cranes

    • Tower cranes

    • Overhead cranes

    • Telescopic cranes

    • Loader cranes

  • Answered by AI
  • Q2. How much type of lifting
  • Ans. 

    There are two main types of lifting: manual lifting and mechanical lifting.

    • Manual lifting involves lifting objects by hand, without the use of equipment.

    • Mechanical lifting involves using equipment such as cranes, forklifts, or hoists to lift heavy objects.

    • Proper training and techniques are essential to prevent injuries during lifting.

    • Examples of manual lifting include lifting boxes, bags, or furniture.

    • Examples of mecha...

  • Answered by AI

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (18)

J. Kumar Infraprojects interview questions for popular designations

 Civil Engineer

 (4)

 Civil Foreman

 (3)

 Senior Engineer

 (2)

 Safety Officer

 (2)

 Safety Supervisor

 (2)

 Asst Store

 (2)

 Quality Engineer

 (2)

 QA QC Engineer

 (2)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Reason for join the organization.
  • Ans. 

    I am passionate about the company's mission and values, and I believe my skills and experience align well with the organization's goals.

    • Passionate about company's mission and values

    • Skills and experience align with organization's goals

  • Answered by AI
  • Q2. Reason for leaving the present organization
  • Ans. 

    Seeking new challenges and growth opportunities in a larger organization.

    • Desire for career advancement

    • Looking for new challenges

    • Seeking growth opportunities

    • Interested in larger organization

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - One should have some basic important informations about company in which he is going to attend interview.

Senior Store Manager Interview Questions asked at other Companies

Q1. Which year was Senco Gold Ltd was enlisted for IPO in?
View answer (1)

Get interview-ready with Top J. Kumar Infraprojects Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What equipment handle
  • Ans. 

    Assistant Managers handle various equipment depending on the industry, such as computers, software, machinery, tools, and office supplies.

    • Computers and software for data management and analysis

    • Machinery for production or operations

    • Tools for maintenance or repairs

    • Office supplies for administrative tasks

  • Answered by AI
  • Q2. B

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (87)

Jobs at J. Kumar Infraprojects

View all
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Metro project Bumbai
  • Q2. Metro project Bumbai j.kumar
  • Q3. J.kumar metro project
  • Ans. 

    J.kumar metro project is a major infrastructure project involving construction of metro rail system.

    • J.kumar metro project is a large-scale infrastructure project focused on building a metro rail system.

    • The project involves various stages such as planning, design, construction, and implementation.

    • It may include tasks like excavation, tunneling, track laying, station construction, etc.

    • The project requires coordination wi...

  • Answered by AI
  • Q4. Site Engineer , metro project
  • Q5. Very good company

Interview Preparation Tips

Topics to prepare for J. Kumar Infraprojects Civil Site Engineer interview:
  • Civil Engineering
  • Site Engineering
  • Site Supervision
Interview preparation tips for other job seekers - Site Engineer

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1. BBS process 1. Subcontractor billing 2. Claim Estimation 4.Material reconciliation
  • Q2. Answer as per the question

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Basics Communication skills based questions. 2. General introduction.
Round 3 - Technical 

(1 Question)

  • Q1. Civil related basic technical questions. Procurement related questions
Round 4 - HOD round 

(1 Question)

  • Q1. 1. In-depth Technical questions. 2. In-depth Procurement Based questions.

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Civil Foreman work 

(6 Questions)

  • Q1. What BBS in contraction
  • Ans. 

    BBS in construction stands for Bar Bending Schedule.

    • BBS is a document that provides details about the reinforcement steel bars used in a construction project.

    • It includes information about the size, shape, quantity, and placement of the bars.

    • BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.

    • Example: BBS for a column may spec...

  • Answered by AI
  • Q2. What is mix ratio M 25
  • Ans. 

    Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.

    • M 25 mix ratio is commonly used in construction for structural applications.

    • The mix ratio represents the proportions of different materials used in the concrete mix.

    • For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or g...

  • Answered by AI
  • Q3. How many zone in u grider
  • Ans. 

    The number of zones in a u grider varies depending on the specific design and requirements.

    • The number of zones in a u grider can range from 1 to multiple zones.

    • Zones are typically created to divide the grider into sections for better load distribution and structural stability.

    • The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specific...

  • Answered by AI
  • Q4. How calculate zone Azone 3,700m B zone 1000ma& C zone remaining in center
  • Ans. 

    To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.

    • Determine the total area of the site

    • Calculate the area of zone A by subtracting the combined area of zones B and C from the total area

    • Calculate the area of zone B using the given dimension

    • Calculate the area of zone C by subtracting the area of zone B from the total area

    • Ensure the units of measurement are consistent

  • Answered by AI
  • Q5. How can work in hight
  • Ans. 

    Working at heights requires proper safety measures and equipment.

    • Use appropriate safety harnesses and fall protection systems.

    • Ensure scaffolding and ladders are secure and stable.

    • Follow safety guidelines and regulations.

    • Provide proper training to workers on working at heights.

    • Regularly inspect and maintain equipment and tools.

    • Implement safety barriers and guardrails.

    • Use aerial lifts or platforms for safe access to elev...

  • Answered by AI
  • Q6. How u bihev ur Engeniar
  • Ans. 

    I behave as a civil engineer by being professional, organized, and detail-oriented.

    • I maintain a professional demeanor at all times, treating colleagues and clients with respect.

    • I am organized in my work, keeping track of project timelines, budgets, and resources.

    • I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.

    • I communicate effectively with team members, subcontractors, and...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil foreman concrete & finishing process

Skills evaluated in this interview

Top J. Kumar Infraprojects Civil Foreman Interview Questions and Answers

Q1. How calculate zone Azone 3,700m B zone 1000ma& C zone remaining in center
View answer (2)

Civil Foreman Interview Questions asked at other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .
View answer (1)

J. Kumar Infraprojects Interview FAQs

How many rounds are there in J. Kumar Infraprojects interview for experienced candidates?
J. Kumar Infraprojects interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the J. Kumar Infraprojects interview process for experienced candidates are Technical, Resume Shortlist and HR.
How to prepare for J. Kumar Infraprojects interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at J. Kumar Infraprojects. The most common topics and skills that interviewers at J. Kumar Infraprojects expect are Project Management, General Insurance, Quantity Surveying, Receptionist Activities and Talent Acquisition.
What are the top questions asked in J. Kumar Infraprojects interview for experienced candidates?

Some of the top questions asked at the J. Kumar Infraprojects interview for experienced candidates -

  1. Grade of dlc ,gsb and dBm which provided of pavemen...read more
  2. What is fire, classes of fi...read more
  3. How much cost of material value in you do have store sto...read more
How long is the J. Kumar Infraprojects interview process?

The duration of J. Kumar Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

J. Kumar Infraprojects Interview Process for Experienced

based on 20 interviews

Interview experience

4.5
  
Good
View more

J. Kumar Infraprojects Reviews and Ratings

based on 1.1k reviews

4.0/5

Rating in categories

3.8

Skill development

3.9

Work-life balance

3.6

Salary

3.9

Job security

3.7

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 1.1k Reviews and Ratings
Procurement Engineer / Officer

Mumbai

4-6 Yrs

Not Disclosed

Engineer Procurement (HO - Mumbai)

Mumbai

2-3 Yrs

Not Disclosed

Engineer - Procurement (For Delhi)

New Delhi

5-7 Yrs

Not Disclosed

Explore more jobs
Junior Engineer
181 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
157 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
152 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
138 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
114 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare J. Kumar Infraprojects with

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview